Romania’s high-capacity road network remains fragmented despite sustained investment: the system expands but does not consolidate. Fragmentation is not primarily the result of insufficient funding, technical incapacity, or administrative delay, nor of mountainous relief alone. It emerges from the interaction between a geographically constrained territorial structure and a post-socialist institutional system required to deliver long linear infrastructure across multiple jurisdictions, legal regimes, and political cycles. The inherited spatial geometry persists; yet its articulation at high-capacity standard is uneven: corridors with lower implementation risk stabilise early, while cross-Carpathian links are delayed under cumulative constraint. Romania is analytically revealing because physical constraint and sequential institutional reform converge on the same alignments, producing not network failure but selective consolidation within a stable radial framework. In 1984, Pop described Romania’s road system as a structured territorial formation (Pop, 1984). Two concentric rings organised the country: an extra-Carpathian arc along the plains and borders and an intra-Carpathian ring enclosing the Transylvanian basin. From Bucharest, radial corridors connected the capital to all major regions, while the Carpathian arc functioned as the system’s central constraint. Roads followed river valleys, crossed the mountains at fixed passes, and paralleled the railway network. The hierarchy was explicit and the geometry was stable. The system was not high capacity, but it remained internally coherent. That territorial structure did not disappear after 1990. The main corridors, the mountain crossings, and the radial orientation towards Bucharest persisted. What changed was the institutional regime through which they were governed and extended: centralised territorial planning gave way to fragmented competences, restitution-based land regimes, decentralised permitting, European funding cycles, and contract-based implementation. Today, Romania’s high-capacity road network remains discontinuous. Some radial segments have been upgraded to motorway or expressway standard, while others remain incomplete. Trans-Carpathian links lag behind, and ring continuity is partial. Construction advances in isolated sections rather than through fully integrated corridors. This chapter argues that fragmentation does not result primarily from insufficient funding, technical incapacity, or administrative delay nor from mountainous relief alone. It emerges from the interaction between a geographically constrained territorial structure and a post-socialist institutional system required to coordinate long linear projects across jurisdictions, legal domains, and political time horizons. The inherited spatial logic persists, but its articulation at high-capacity standard operates under cumulative constraint. Romania is analytically revealing because physical constraint and sequential institutional reform converge on the same corridors. The result is not the disappearance of the inherited geometry but its selective consolidation: some axes stabilise early, while others accumulate delay. The analysis proceeds in six steps. It begins with the present configuration of the high-capacity network and then examines the geographic, temporal, legal, and normative dimensions that shape its evolution before turning to selected metropolitan case studies.