Ping Wang

Ping Wang


Research Focus & Metrics

Academic Career Length

27Years (2000-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2020 in Applied Energy
Verified
Journal Article
Closed access
MGMingyuan Gao
Mingyuan Gao
JCJianli Cong
Jianli Cong
JXJieling Xiao
Jieling Xiao
QHQing He
Qing He
SLShoutai Li
Shoutai Li
PWPing Wang
Ping Wang

1 May 2016 in Construction and Building Materials
Verified
Journal Article
Closed access
JRJuanjuan Ren
Juanjuan Ren
XLXiao Li
Xiao Li
RYRongshan Yang
Rongshan Yang
PWPing Wang
Ping Wang
PXPeng Xie
Peng Xie

1 May 2020 in Applied Energy
Verified
Journal Article
Closed access
YGYuhan Gu
Yuhan Gu
Weiqun LiuWeiqun Liu
Weiqun Liu
CZCaiyou Zhao
Caiyou Zhao
PWPing Wang
Ping Wang

1 April 2020 in Construction and Building Materials
Verified
Journal Article
Closed access
JLJianxing Liu
Jianxing Liu
PWPing Wang
Ping Wang
GLGanzhong Liu
Ganzhong Liu
JXJieling Xiao
Jieling Xiao
HLHao Liu
Hao Liu
TGTianci Gao
Tianci Gao

1 January 2014 in Advances in Materials Science and Engineering
Verified
Journal Article
Open access
PDF file
PWPing Wang
Ping Wang
HXHao Xu
Hao Xu
Rong ChenRong Chen
Rong Chen
The debonding of cement emulsified asphalt mortar (CA mortar) is one of the main damage types in China railway track system II slab ballastless track. In order to analyze the influence of mortar debonding on the dynamic properties of CRTS II slab ballastless track, a vertical coupling vibration model for a vehicle-track-subgrade system was established on the base of wheel/rail coupling dynamics theory. The effects of different debonding lengths on dynamic response of vehicle and track system were analyzed by using the finite element software. The results show that the debonding of CA mortar layer will increase the dynamic response of track. If the length of debonding exceeds 1.95 m, the inflection point will appear on the vertical displacement curve of track. The vertical vibration acceleration of slab increases 4.95 times and the vertical dynamic compressive stress of CA mortar near the debonding region increases 15 times when the debonding length reaches 3.9 m. Considering the durability of ballastless track, once the length of debonding reaches 1.95 m, the mortar debonding should be repaired.

1 March 2021 in Journal of Sound and Vibration
Verified
Journal Article
Closed access
Rong ChenRong Chen
Rong Chen
CHChenyang Hu
Chenyang Hu
Jingmang XuJingmang Xu
Jingmang Xu
ZGZheng Gong
Zheng Gong
LLLe Liu
Le Liu
XCXiaoping Chen
Xiaoping Chen