Xinpeng Zhang

Mr. Xinpeng Zhang


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 January 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HZHua Zhang
Hua Zhang
QLQichang Li
Qichang Li
BLBingyue Lin
Bingyue Lin
LYLiu Yanyi
Liu Yanyi
XZXinpeng Zhang
Xinpeng Zhang
In this paper, we take the longitudinal two-stage and two-yard EMU (Electric Multiple Unit) depot as an example and discusses the optimization challenges of the first-level maintenance shunting operation plan under the background of limited maintenance capacity. A multi-objective programming is constructed, which adopts the lexicographic ordering method and aims to minimize the occupancy time of key line areas and the number of train storage times. In order to enhance the flexibility and solution efficiency of the shunting operation plan, we design an efficient three-stage strategy algorithm. Specifically, in the first stage, the genetic and mutation rules are integrated, and the fast iterative advantage of the genetic algorithm is utilized to solve the time decision variables in the optimization problem. In the second stage, the allocation of track occupancy variables is further solved. The third stage focuses on the optimized allocation of maintenance team variables to ensure the scientific scheduling of maintenance resources. Finally, a validation experiment was conducted using the maintenance tasks of 19 EMU sets as the test scenario. The results indicate that when the number of maintenance teams is set to 4, an optimal balance between maintenance efficiency and operational cost is achieved, the occupancy duration of key line zones reaches 3034 min (the theoretical optimum), the number of maintenance teams is reduced by 33.33% compared to the initial 6 teams, and the number of storage operations is optimized to 27 times. Additionally, the algorithm’s solution time remains under 50 s, demonstrating significantly improved computational efficiency. Comparative experiments with baseline algorithms show that the proposed method reduces the occupancy duration of key line zones by up to 0.49%, decreases the number of storage operations by 14 times, and advances the maximum completion time by 20 min. In summary, the proposed method provides solid theoretical support for the formulation of maintenance plans and shunting schedules in EMU depots. Particularly in complex scenarios with limited maintenance capacity, it offers innovative and robust decision-making foundations, demonstrating significant practical guidance value.