Paolo Stracchi

Dr. Paolo Stracchi

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 December 2025 in Buildings
Verified
Journal Article
Open access
PDF file
PSPaolo Stracchi
Paolo Stracchi
Scholarly research offers a robust theoretical understanding of design-to-construction processes, but there is a shortage of empirically grounded accounts that trace how procurement decisions, industrial conditions, and production dynamics interact within specific projects. This shortage is largely due to the scarcity of accessible data—constrained by confidentiality obligations and reluctance to disclose contentious procedures—and to the practical difficulty of reconstructing construction processes in a way that follows multiple actors’ perspectives (client, designers, contractor, consultants) within concrete technical, contractual, and market conditions. This paper argues that historical archival material offers a way to address this evidentiary and methodological gap. It reconstructs the construction of the Cameron Offices (1967–1976) in Canberra as an evidence-rich design-to-construction case-story, based on systematic analysis of contracts, specifications, correspondence, site minutes, and technical reports. The resulting case-story preserves multiple perspectives as well as sequence and contingency, rendering project decision-making, production dynamics, and external constraints both highly interconnected and analytically legible. In doing so, the study demonstrates the potential of historical archives as a source of construction data and advances case-stories as a methodological avenue that complements existing analytical models, supports case-based learning, and sets a future agenda for integrating historical, archive-based evidence into design-to-construction research and practice.

27 February 2026 in Buildings
Verified
Journal Article
Open access
PDF file
LCLuciano Cardellicchio
Luciano Cardellicchio
PSPaolo Stracchi
Paolo Stracchi
KBKathy Bowrey
Kathy Bowrey
SASamaneh Arasteh
Samaneh Arasteh
This study conducts a systematic mapping review of the academic literature published between 2008 and 2025 to examine how architects’ agency is framed, attributed, and conceptualised within construction innovation research. The review maps how scholarship represents architectural contributions, identifies patterns of visibility and omission, and diagnoses gaps in how innovation is recognised, documented, and valued. It asks how scholarship characterises architects’ roles, how such agency shifts across design, procurement, and construction, and what inhibits the dissemination of innovation. Across the mapped corpus, architects are predominantly positioned as innovation enablers who act as knowledge creators, integrators, and collective problem solvers. Their influence is phase contingent and shaped by the social and technical conditions of project delivery. The review also shows that the literature often struggles to attribute, with analytical clarity, such innovation to architects. Authorship is frequently obscured, and the value generated through architectural work is therefore difficult to trace, compare, and transfer. Building on these findings, the paper advances a framework for analysing architect-led construction innovation across four domains: development, recognition, documentation, and evaluation. This framework highlights the institutional checkpoints and leverage points through which architectural contributions can be made legible, comparable, and cumulative, including through comparative case study analysis.

2 January 2024 in Fabrications
Verified
Journal Article
Closed access
PSPaolo Stracchi
Paolo Stracchi

13 July 2023 in Architectural Research Quarterly
Verified
Journal Article
Open access
PDF file
PTPaolo Tombesi
Paolo Tombesi
PSPaolo Stracchi
Paolo Stracchi
LCLuciano Cardellicchio
Luciano Cardellicchio
In modern architectural debate, buildings are made by their description in the literature as much as they are defined by the reality of their construction. On this point, a relatively small glitch in the celebratory narrative of the roof of the Sydney Opera House – four columns that do not appear in the descriptions of the building – offers the opportunity to reflect on the generation of architecture’s canons and perhaps the perceived need to elevate the subject matter by abstracting the engineering of its construction. While questioning the reasons for the absence of the columns from the biographies of the building, the article articulates the value of embracing even the smaller details in projects' histories.

1 September 2021 in Journal of the International Association for Shell and Spatial Structures
Verified
Journal Article
Closed access
PSPaolo Stracchi
Paolo Stracchi
Location of Project: Dee Why, NSW, Australia Structural Type: Prefabricated thin concrete shell Project Scale: Length 30 m, width 15.5 m, height 12 m Owner/Client: Warringah Catholic Parish Architect: Gibbons & Gibbons Architects Structural Engineer: Concrete Industries Australia (Monier) Engineers Pty. Ltd. Construction: Concrete Industries Australia (Monier) Pty. Ltd. Construction year: 1961

1 May 2026 in Archnet-IJAR: International Journal of Architectural Research
Verified
Journal Article
Open access
PSPaolo Stracchi
Paolo Stracchi
Purpose: This article examines how architectural agency and socio-technical risk shift across the life cycle of a building innovation, using the plastic sun-shading screen of King George Tower (KGT), Sydney (designed/built 1967–1976; removed 1998), as a mechanism-rich case-story. Design/methodology/approach: The study constructs a historical case-story from construction archives, specifications, correspondence, technical datasheets, test reports and post-occupancy files, assembling these materials into a project chronology. Mechanism tracing is then used to follow decision chains across actors and document genres as the innovation moved from design and implementation into early operation and dispute. Findings: Architectural agency becomes especially legible when innovations are justified and authorised through evidentiary scaffolding, and when those same devices later redistribute responsibility and exposure as performance becomes consequential. As procurement, system-level testing, substitution and in-use deterioration unfold, agency becomes increasingly conditional and shifts across suppliers, contractors, clients and technical and legal advisers. Socio-technical risk intensifies as uncertainty is translated into contractual and procedural instruments – tests, classifications, warranties, exclusions and settlements – moving exposure from shared professional judgement towards client–supplier negotiation and time-bounded guarantees. Originality/value: The article offers an evidence-based account of innovation governance in practice, showing how evidentiary infrastructures reshape professional leverage and redistribute liability over time. It demonstrates the value of archival learning histories as a complement to abstract management models, particularly where contemporary projects are difficult to analyse due to confidentiality, fragmented documentation and dispute.