Wei Lin

Prof. Wei Lin


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 December 2025 in Energies
Verified
Journal Article
Open access
PDF file
SCShuting Chen
Shuting Chen
SXSen Xu
Sen Xu
YLYajie Li
Yajie Li
GLGang Liang
Gang Liang
MMMengnan Ma
Mengnan Ma
WLWei Lin
Wei Lin
With the rapid expansion of data centers and the growing demand for cloud computing, their share in total electricity consumption has surged, making them a major high-power load in power systems. Consequently, accurately modeling their energy consumption and quantifying the feasible region have become critical research challenge. Existing studies have focused on energy consumption models for single data centers and single time periods, while limited attention has been given to multi-data centers energy optimization that considers spatiotemporal workload migration. This paper presents an energy consumption model for multi-data centers that accounts for the spatiotemporal transfer flexibility of delay-tolerant workloads. By enabling task migration across data centers (spatial dimension) and workload deferral within each center (temporal dimension), the model dynamically adjusts the operational states of IT equipment to minimize overall system operating costs while satisfying computational demands. To address the computational challenges caused by the large number of integer variables, the sliding window method and equipment aggregation method are employed to ensure the model can be efficiently solved. To further capture the flexibility of data center energy consumption, a method for computing the energy consumption elasticity space is proposed based on multi-parametric programming. This elasticity space characterizes the feasible range of energy consumption under operational constraints and provides boundary conditions for power system dispatch optimization. Simulation studies using real operational data from a large-scale Internet enterprise show that the proposed model reduces the total operational cost by approximately 3.4% compared to the baseline model without flexibility, decreases the frequency of IT equipment state transitions, and enhances the flexibility of data centers in supporting power system supply-demand balance and renewable energy integration.

26 August 2025
Verified
Book Chapter
Closed access
PDF file
WLWei Lin
Wei Lin
JYJuan Yu
Juan Yu
SZSuhan Zhang
Suhan Zhang

26 August 2025
Verified
Book Chapter
Closed access
PDF file
WLWei Lin
Wei Lin
JYJuan Yu
Juan Yu
SZSuhan Zhang
Suhan Zhang

26 August 2025
Verified
Book Chapter
Closed access
PDF file
WLWei Lin
Wei Lin
JYJuan Yu
Juan Yu
SZSuhan Zhang
Suhan Zhang

26 August 2025
Verified
Book Chapter
Closed access
PDF file
WLWei Lin
Wei Lin
JYJuan Yu
Juan Yu
SZSuhan Zhang
Suhan Zhang

26 August 2025
Verified
Book Chapter
Closed access
PDF file
WLWei Lin
Wei Lin
JYJuan Yu
Juan Yu
SZSuhan Zhang
Suhan Zhang