Xiaotong Sun

Mr. Xiaotong Sun


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 January 2026 in Buildings
Verified
Journal Article
Open access
PDF file
SZShuhong Zhu
Shuhong Zhu
XSXiaotong Sun
Xiaotong Sun
XLXiaofeng Liu
Xiaofeng Liu
WLWenjie Li
Wenjie Li
BLBin Liang
Bin Liang
Wind-induced response poses a significant challenge to the stability of extra-large-span heavy steel box girders during synchronous lifting operations. This study adopted a method combining numerical simulation with on-site monitoring to investigate the aerodynamic characteristics the beam during the overall hoisting process of the Xiaotun Bridge. A high-fidelity finite element model was established using Midas NFX 2024 R1, and fluid–structure interaction (FSI) analysis was conducted, utilizing the RANS k-ε turbulence model to simulate stochastic wind fields. The results show that during the lifting stage from 3 m to 25 m, the maximum horizontal displacement of the steel box girder rapidly increases at wind angles of 90° and 60°, and the peak displacement is reached at 25 m. Under a strong breeze at a 90° wind angle and 25 m lifting height, the maximum lateral displacement was 42.88 mm based on FSI analysis, which is approximately 50% higher than the 28.58 mm obtained from linear static analysis. Subsequently, during the 25 m to 45 m lifting stage, the displacement gradually decreases and exhibits a linear correlation with lifting height. Concurrently, the maximum stress of the lifting lug of the steel box girder increases rapidly in the 3–25 m lifting stage, reaches the maximum at 25 m, and gradually stabilizes in the 25–45 m lifting stage. The lug stress under the same critical condition reached 190.80 MPa in FSI analysis, compared with 123.83 MPa in static analysis, highlighting a significant dynamic amplification. Furthermore, the detrimental coupling effect between mechanical vibrations from the lifting platform and wind loads was quantified; the anti-overturning stability coefficient was reduced by 10.48% under longitudinal vibration compared with lateral vibration, and a further reduction of up to 39.33% was caused by their synergy with wind excitation. Field monitoring validated the numerical model, with stress discrepancies below 9.7%. Based on these findings, a critical on-site wind speed threshold of 9.38 m/s was proposed, and integrated control methods were implemented to ensure construction safety. During on-site lifting, lifting lug stresses were monitored in real time, and if the predefined threshold was exceeded, contingency measures were immediately activated to ensure a controlled termination.

11 June 2026 in Eng
Verified
Journal Article
Open access
PDF file
HXHongyu Xu
Hongyu Xu
XSXiaotong Sun
Xiaotong Sun
XLXiaofeng Liu
Xiaofeng Liu
WLWenjie Li
Wenjie Li
To investigate the posture control of super-long-span heavy steel box girders during synchronous lifting, this study takes the integral lifting project of the 82 m-span steel box girder of Xiaotun Bridge on the Fuyi Expressway as a case study. A fluid–solid–thermal three-field coupled numerical model was established using Midas NFX 2024 R1 (a general-purpose finite element analysis software for multi-physics and fluid–structure interaction simulations) to explore the alignment and end-displacement characteristics of the steel box girder throughout the lifting process. The results show that under combined thermal and wind loads, girder deflection presents a daily cyclic pattern: temperature rise induces upward arching, while wind-induced vibration generates a mid-span instantaneous amplitude of ±25.0 mm, with a maximum coupled deflection of 31.78 mm. Girder end-displacement increases significantly at lifting heights of 5–25 m and peaks at 25 m. With further height increase and shortened sling length, sway frequency rises while maximum displacement gradually declines. When the plane tilt ratio exceeds 0.17% or the overall unbalanced displacement at lifting points exceeds 12 mm, local stress exceeds 95% of the allowable value, implying potential instability risks. For construction safety, a synchronous intelligent hydraulic lifting system based on the “displacement synchronization and load balancing” strategy was applied. Supported by real-time sensor feedback and adjustment, the system achieves millimeter-level lifting precision and welding positioning accuracy. This study provides a reference for similar synchronous lifting practices of large-span steel box girders.