Everything in the world is about risk, from individual decisions to global manipulations, which is of fundamental importance in a nuclear power plant environment. The question is whether, in a given situation, this risk is acceptable or no longer acceptable. In some respects, the risk analysis applied to construction projects differs from the risk analysis applied to nuclear installations. For nuclear installations, the risk as such is nuclear risk. Primary safety is nuclear safety. Secondarily, we talk about other risks, for each of which it must be assessed whether there is an impact on nuclear safety. In view of this, for investments involving a nuclear installation, the risk analysis to be carried out must be carried out at two separate levels. In the case of civil engineering works in the immediate vicinity of a nuclear installation, it is particularly important to analyse the construction risks. The main problem for a nuclear installation is the unequal subsidence, which causes the building to tilt. The primary objective is to determine the value of the expected settlement, which forms the basis for an accurate determination of the risks. The first level is the traditional construction risk analysis, and then as a second level, each risk item should be classified from a nuclear risk point of view. In this paper, we present the nuclear exposure of construction risks and the possibility of mitigating these risks through a real-time monitoring system.
Modelling concrete columns confined with fiber-reinforced polymer (FRP) using finite element (FEM) analysis is a difficult task due to the need for precise definition of material and interaction parameters. The inclusion of FRP confinement in composites introduces complexities in representing the volumetric behavior of concrete under triaxle stress conditions. The behavior of confined concrete differs from that of non-confined concrete due to the passive nature of FRP confinement, requiring consideration of flow rules, damage parameters, strain hardening/softening constitutive relationships, and a pressure-dependent yield criterion. This project aims to address these challenges by proposing a modified plastic damage model, a concrete dilation model, and a new set of concrete hardening/softening rules using the advanced FE program ABAQUS CAE. The FE model’s strengths and limitations are evaluated by comparing it with experimental results from this project, as well as other findings from literature, including both experimental and analytical studies.
Fire safety in heritage buildings is a major challenge. It is necessary to find effective solutions that minimise damage to the protected building and do not cause damage or diminish the aesthetic value of the building. This requires not only special equipment, but often also specific solutions. The easiest way to increase the fire safety level of a building is to retrofit it with active fire protection systems. The aim of this paper is to review fire detection solutions suitable for historic buildings, with particular emphasis on minimally invasive and visually unobtrusive systems. The study combines a structured review of point, linear, and aspirating smoke detection technologies with a demonstrative parametric sizing assessment of an aspirating smoke detection (ASD) system using a manufacturer-supported sizing software. The sizing analysis investigates how changes in sampling hole diameter and fan settings influence transport time, sensitivity distribution, and system balance under constrained routing conditions typical of heritage interiors. The results highlight key trade-offs between response time and system balance, providing practical guidance for designers and conservation professionals. The findings support the development of fire detection strategies that align with European recommendations for heritage protection while ensuring technical effectiveness. The paper also provides a guideline to professionals, architects, restorers, and heritage experts, who have key roles in the protection of heritage structures.
Everything in the world is about risk, from individual decisions to global manipulations, which is of fundamental importance in a nuclear power plant environment. The question is whether, in a given situation, this risk is acceptable or no longer acceptable. In some respects, the risk analysis applied to construction projects differs from the risk analysis applied to nuclear installations. For nuclear installations, the risk as such is primarily nuclear risk. In view of this, for investments involving a nuclear installation, the risk analysis to be carried out must be carried out at two separate levels. The first level is the traditional construction risk analysis, and then as a second level, each risk item should be classified from a nuclear risk point of view. In this study, the nuclear exposure of construction risks will be presented.
17 November 2025 in YBL Journal of Built Environment
In this paper, we would like to assess the issue of construction risks in a nuclear power plant and the possibility of mitigating these risks through a real-time monitoring system. In our research, we are concerned with the determination of the risks of deep construction activities and their impact on a specific nuclear site. We will also investigate possible risk mitigation activities that can be used in the nuclear power plant environment and their effectiveness. In some respects, the risk analysis applied to construction projects differs from the risk analysis applied to nuclear installations. For nuclear installations, the risk as such is primarily nuclear risk. In view of this, for investments involving a nuclear installation, the risk analysis to be carried out must be carried out at two separate levels. The first level is the traditional construction risk analysis, and then on a second level, each risk item should be classified from a nuclear risk point of view. In this study, the nuclear exposure of construction risks will be presented.
A világon minden a kockázatról szól, az egyéni döntésektől a globális döntésekig. A kérdés az, hogy egy adott projekt számára ez a kockázat elfogadható, vagy már nem. Az építési projektekre alkalmazott kockázatelemzés bizonyos tekintetben eltér a nukleáris létesítményekre alkalmazott kockázatelemzéstől. A nukleáris létesítmények esetében a kockázat mint olyan elsősorban nukleáris kockázat. Ennek fényében a nukleáris létesítményt érintő beruházások esetében az elvégzendő kockázatelemzést két külön szinten kell elvégezni. Az első szint a hagyományos építési kockázatelemzés, majd második szintként minden kockázati elemet nukleáris kockázati szempontból kell besorolni. A kutatás az építési kockázatok nukleáris kitettségének meghatározására irányult, továbbá ezen kockázatok valós idejű monitoringrendszerrel való csökkentési lehetőségét vizsgálja.