Fengyu Zhang

Dr. Fengyu Zhang


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 January 2026 in Electronics
Verified
Journal Article
Open access
PDF file
FZFengyu Zhang
Fengyu Zhang
JLJinyang Liu
Jinyang Liu
PLPeizhen Li
Peizhen Li
LCLin Chen
Lin Chen
QXQingsong Xiong
Qingsong Xiong
Building information models (BIMs) serve as a foundational tool for digital management of existing structures. Traditional methods suffer from low automation and heavy reliance on manual intervention. This paper proposes an automated method for structural component dimension recognition and BIM modeling based on 3D point cloud data. The proposed methodology follows a three-step workflow. First, the raw point cloud is semantically segmented using the PointNet++ deep learning network, and individual structural components are effectively isolated using the Fast Euclidean Clustering (FEC) algorithm. Second, the principal axis of each component is determined through Principal Component Analysis, and the Random Sample Consensus (RANSAC) algorithm is applied to fit the boundary lines of the projected cross-sections, enabling the automated extraction of geometric dimensions. Finally, an automated script maps the extracted geometric parameters to standard IFC entities to generate the BIM model. The experimental results demonstrate that the average dimensional error for beams and columns is within 3 mm, with the exception of specific occluded components. This study realizes the efficient transformation from point cloud data to BIM models through an automated workflow, providing reliable technical support for the digital reconstruction of existing buildings.

15 January 2026 in Buildings
Verified
Journal Article
Open access
PDF file
FZFengyu Zhang
Fengyu Zhang
PLPeizhen Li
Peizhen Li
GZGang Zong
Gang Zong
LYLepeng Yu
Lepeng Yu
JYJinping Yang
Jinping Yang
PZPeng Zhao
Peng Zhao
Accurate prediction of subway-induced environmental vibrations for unopened lines remains a significant challenge due to the difficulty in determining appropriate excitation inputs. To address this issue, this study proposes an excitation modification method based on field measurements and numerical simulations. First, field measurements were conducted on a subway line in Shanghai to analyze vibration propagation characteristics and validate a two-dimensional finite element model (FEM). Subsequently, based on the validated model, frequency-band excitation modification formulas were derived. Distinct from existing empirical approaches that often rely on simple statistical scaling, the proposed method utilizes parametric numerical analyses to determine frequency-dependent correction coefficients for four key parameters: tunnel burial depth, tunnel diameter, soil properties, and train speed. The reliability of the proposed method was verified through theoretical analysis and an engineering application. The results demonstrate that the proposed method improves prediction accuracy for tunnels in similar soft soil regions, reducing the prediction error from 10.1% to 5.2% in the engineering case study. Furthermore, parametric sensitivity analysis reveals that ground vibration levels generally decrease with increases in burial depth, tunnel diameter, and soil stiffness, while exhibiting an increase with train speed. This study improves the reliability of vibration prediction in the absence of direct measurements and provides a practical tool for early-stage design and vibration mitigation for unopened lines.

28 October 2026 in Journal of Civil Structural Health Monitoring
Verified
Journal Article
Closed access
PDF file
FZFengyu Zhang
Fengyu Zhang
Qingzhao KongQingzhao Kong
Qingzhao Kong
PLPeizhen Li
Peizhen Li
JLJinyang Liu
Jinyang Liu