In waterproofing mountain tunnels, the tunnel joint is the weak link. To explore the waterproof failure mechanism of the tunnel joint waterstop belt and to propose an optimization method for the waterstop belt, this paper combines tests and numerical simulations, summarizes the waterproofing mechanism of the waterstop belt, establishes a finite element model of the waterstop belt considering bonding and extrusion, and studies the waterproofing ability and mechanical properties of the waterstop. The main conclusions are as follows: (1) The waterproofing capacity of the water stop belt depends on its surface contact pressure and bonding force. (2) Waterstop deformation will partially destroy the bonding between the waterstop and concrete, reducing the reliability of the waterproofing mechanism. (3) When the deformation of the waterstop belt reaches a certain degree, its stress value is too large to meet the requirements of its service life. (4) The design can be optimized from two aspects: the bond between the waterstop and concrete, and the size of the waterstop.
Foot steel pipe was the main arch foot supporting structure to control large deformation of loess tunnels, but the supporting effect was not ideal. Taking Yulinzi Tunnel in Qingyang, Gansu Province, as the engineering background, the design concept and implementation scheme of a foot steel pipe active bearing was put forward. The purpose was to solve the problem that it was difficult to control the surrounding rock settlement with the foot steel pipe. Numerical simulation and field experiments were used to verify the effect of the active bearing technology of the foot steel pipe. The main conclusions were as follows: (1) The effect of increasing the diameter of the foot steel pipe is better than that of increasing the number of foot steel pipes. (2) The active bearing mode of exerting its bearing capacity in advance by prepressing the foot steel pipe can effectively reduce the settlement of the vault. The settlement rate of the vault can be reduced by about 70% in 1–2 days and more than 50% in 1–3 days. (3) At the initial stage of surrounding rock deformation, this technology can provide a large bearing capacity, thereby reducing the overall deformation of the surrounding rock, slowing down the release of the surrounding rock pressure, and playing a positive role in the settlement control of the vault.
Drill-and-blast tunnel construction continuously releases high-intensity dust during drilling, blasting, and shotcreting, while conventional forced ventilation is often insufficient to control dust migration and worker exposure. This study develops three-dimensional Euler–Lagrange gas–solid two-phase models for these three typical processes to clarify the spatiotemporal dispersion of polydisperse dust and to explore effective control strategies. The simulations show that all processes generate a persistent high-concentration dust belt near the tunnel face, and a low-velocity recirculation zone at the crown acts as a structural hotspot of dust accumulation that is difficult to purge by longitudinal ventilation. Particle size strongly affects dispersion behaviour: coarse particles rapidly settle near the source under gravity, whereas fine and medium-sized particles remain suspended for long periods and can be transported over long distances, particularly after blasting. Based on these findings, a rail-mounted purification system with a dynamically adjustable position along the tunnel is proposed, and its preferred deployment zones are determined to work synergistically with the main airflow. The system is designed to perform near-source and crown-targeted removal, providing an engineering-oriented “dynamic local purification plus overall ventilation dilution” pathway for improving air quality in drill-and-blast tunnel construction.
Sediment accumulation in the drainage systems of mountain tunnels is a typical issue threatening operational safety. To explore the sedimentation behavior under the coupling of multiple factors, this study systematically analyzes the coupled effects of sediment content, flow rate, slope, and cross-sectional shape on sedimentation through full-scale experiments and numerical simulations. The results indicate that: (1) the sediment accumulation is linearly positively correlated with sediment concentration (fitting slope of 0.87) and exponentially negatively correlated with flow rate and slope (R2 > 0.90); (2) for drainage trenches with different cross-sectional shapes under the same boundary conditions, the maximum flow velocity and anti-sedimentation capacity rank as narrow rectangular > semi-circular ≈ inverted trapezoidal > rectangular; (3) the study proposes engineering anti-sedimentation strategies, such as moderately increasing the slope and adopting a periodic concentrated discharge model to enhance sediment transport capacity using peak flow; (4) under the premise of meeting drainage and flood control standards, the inverted trapezoidal or semi-circular cross-sections are preferred. The bottom waterway width can be reduced to increase flow velocity, thereby achieving a synergistic optimization of drainage efficiency and operational reliability. This provides a quantitative basis for the structural selection and anti-sedimentation design of tunnel drainage systems.