M. Oka OKA Mahendra

Mr. M. Oka OKA Mahendra

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 August 2025 in UKaRsT
Verified
Journal Article
Open access
PDF file
MMM. Oka OKA Mahendra
M. Oka OKA Mahendra
MDMuhammad Djuneydi
Muhammad Djuneydi
Urban population growth has had an impact on traffic congestion. Although public infrastructure is available, public preference for private vehicles remains high. This occurs on the Merak-Rangkasbitung route which is served by the train. The gap between service availability and user preferences indicates the need to study mode selection behavior and the factors that influence it. This study aims to analyze motorcycle and car users' tendency to shift their transportation modes from private vehicles to the train service on the Merak- rangkasbitung route. A quantitative approach was carried out using a questionnaire survey method on 300 respondents using a dual-stratum sampling technique. The analysis used the Importance Performance Analysis (IPA), Customer Satisfaction Index (CSI), and Chi-Square test. The IPA results showed a service suitability value of 86.57%, while CSI showed a satisfaction level of 72.86% (satisfied category). The Chi-Square test results identified that the factors influencing the transportation mode choice differed between segments. For motorcycle users, it was influenced by age, car ownership, and reason for travel, while car users were influenced by occupation, travel costs, reasons and purposes of travel. These findings emphasize the importance of a policy approach based on user segmentation and strengthening integration between modes to improve the effectiveness of train services. With an adaptive service strategy and targeted incentive policies, the transformation towards sustainable urban mobility can be realized.

30 June 2023 in International Journal of Engineering and Advanced Technology
Verified
Journal Article
Open access
MDMuhammad Djuneydi
Muhammad Djuneydi
YPYudi Setio Prabowo
Yudi Setio Prabowo
MMM. Oka OKA Mahendra
M. Oka OKA Mahendra
In carrying out the PPLP Banten Building construction project, it experienced delays. The causes of delays are the addition of time, changes in shop drawings and material delays. Then the solution in theMicrosoft project is an alternative crashing method of 4 hours of overtime and work shifts. The research results obtained 18 jobs that are on the critical path of 43 jobs. The normal total duration is 942 days and the normal fee is Rp. 569.100.000 using AHSP. The results obtained are the total duration of the alternative crashing 4 hours of overtime work is 678 days, while the work shift is 530 days, the AHSP Project produces an alternative total cost of 4 hours overtime of Rp. 3.066.675.000 and work shifts with accident costs of Rp. 1.223.565.000. The alternative cost of 4 hours of overtime using the AHSP project is Rp. 193.067.245,23 and work shifts using the AHSP project of Rp. 33.638.199,58 then the work shift alternative is more economical and was chosen to be applied to the project. The results of the comparison of direct and indirect costs for the 4-hour overtime alternative are direct costs Rp. 9.672.161.032,2 indirect costs Rp. 1.322.728.805,77 and direct costs for work shift alternatives Rp.9.512.731.986,58 costs Rp. 1.273.456.116,78 then the work shift alternative is more economical and is chosen to be applied to the project.

10 April 2025 in Jurnal Teknik Industri Terintegrasi
Verified
Journal Article
Open access
PDF file
MMM. Oka OKA Mahendra
M. Oka OKA Mahendra
TSTeguh Eko Saputro
Teguh Eko Saputro
APAl Fiillian Sah Putra
Al Fiillian Sah Putra
The PPLP Banten Building construction project experienced significant delays due to the extension of the implementation time, design revisions (shop drawings), and inaccurate material delivery. This study implemented a schedule compression strategy using Microsoft Project with two acceleration alternatives based on the AHSP standard. The crashing research method. The results of the study showed that the project duration was successfully shortened by 678 days with the 4-hour/day overtime alternative, while further work shift optimization reduced the duration to 530 days. Cost analysis showed differences between the two alternatives: with 4-hour/day overtime, the acceleration cost reached IDR3,066,675,000 (AHSP), while the work shift only cost IDR1,223,565,000 (AHSP). Comparison of cost slopes strengthened the advantages of work shifts: 4-hour/day overtime resulted in a cost slope of IDR193,067,245.23/day (AHSP), while the work shift only cost IDR33,638,199.58/day (AHSP). Evaluation of total costs (direct and indirect) also confirmed the efficiency of work shifts, with direct costs of Rp9,512,731,986.58 and indirect costs of Rp1,273,456,116.78, compared to 4 hours/day of overtime which required direct costs of Rp9,672,161,032.20 and indirect costs of Rp1,322,728,805.77.

23 July 2025 in Seminar Nasional Pengabdian Masyarakat
Verified
Journal Article
Open access
PDF file
MMM. Oka OKA Mahendra
M. Oka OKA Mahendra
KKKhoirunnajwa Khoirunnajwa
Khoirunnajwa Khoirunnajwa
MFMelanie Febrianty
Melanie Febrianty
EAErica Aprilia
Erica Aprilia
LRLutfia Rahmawati
Lutfia Rahmawati
Pemotongan distribusi sampah organik menuju TPA melalui konversi menjadi produk bernilai menjadi solusi berkelanjutan bagi SMAN 3 Kota Serang. Eco enzim sebagai produk ramah lingkungan dihasilkan dari fermentasi limbah organik (kulit buah, sisa sayuran) dengan gula merah dan air (rasio 3:1:10). Observasi menunjukkan 65% sampah sekolah berupa limbah organik yang belum dimanfaatkan dan langsung dibuang. Kegiatan pengabdian ini mengintegrasikan program P5 (Projek Penguatan Profil Pelajar Pancasila) melalui lima tahapan: (1) perencanaan pengelolaan sampah berbasis partisipasi siswa, (2) koordinasi dengan pihak sekolah, (3) sosialisasi dan pelatihan pembuatan eco enzim, (4) pendampingan praktik selama 1 minggu, dan (5) evaluasi dampak. Hasilnya menunjukkan 88% siswa dari 30 kelas sangat tertarik mempraktikkan eco enzim, 92% berkomitmen membuatnya di rumah, 76% berminat mengembangkan produk turunan, dan 94% akan memanfaatkannya untuk pembersih alami ruang kelas serta penghilang bau toilet. Tingkat kepuasan mencapai 90% dengan estimasi pengurangan 40 kg/bulan sampah organik. Kegiatan ini membuktikan integrasi P5 dan pengelolaan sampah organik efektif membangun kesadaran ekologis pelajar.

18 October 2024 in Seminar Nasional Pengabdian Masyarakat
Verified
Journal Article
Open access
PDF file
MMM. Oka OKA Mahendra
M. Oka OKA Mahendra
AOAnggun Nur Oktaviani
Anggun Nur Oktaviani
Kemudahan penggunaan plastik menyebabkan penggunaannya meluas, sehingga sampah plastik menumpuk dan menimbulkan pencemaran lingkungan karena kandungan senyawa berbahaya dan logam berat. Pemerintah mengusung konsep 4R (Reduce, Reuse, Recycle, Replacement) untuk mengatasi masalah ini. Ecobrick adalah salah satu penerapan konsep ini, khususnya reduksi dan daur ulang. Tujuan dari pengabdian di desa Keronjen ini adalah untuk memanfaatkan sampah plastik menjadi produk bernilai guna untuk meminimalisir penumpukan sampah plastik. Metode yang digunakan dalam penelitian ini adalah kualitatif dengan teknik pengumpulan data melalui penelitian dokumen, observasi, dan wawancara. Data yang diperoleh dianalisis secara deskriptif dan kualitatif serta disajikan secara naratif. Pelaksanaan pengabdian ini terbagi dalam dua kegiatan yaitu konsultasi dan pelatihan. Pelaksanaan penelitian ini terdiri dari konsultasi dan pelatihan, menghasilkan produk berupa meja dan kursi dari botol plastik bekas dan sampah plastik.

10 April 2025 in Jurnal Teknik Industri Terintegrasi
Verified
Journal Article
Open access
PDF file
MMM. Oka OKA Mahendra
M. Oka OKA Mahendra
TSTeguh Eko Saputro
Teguh Eko Saputro
APAl Fiillian Sah Putra
Al Fiillian Sah Putra
Construction projects are bound by predefined schedules and budgets established from the outset. This study aims to optimize time and cost through a 3-hour daily overtime intervention, focusing on evaluating schedule acceleration effectiveness and resource efficiency. The Time Cost Trade Off (TCTO) method was applied via crashing techniques, systematically calculating cost-time trade-offs. Analysis centered on critical paths identified using the Critical Path Method (CPM), with schedule compression achieved through additional work hours. The findings reveal that the project duration was reduced from 180 days to 145 days, achieving a 35-day reduction (19.4%). This outcome demonstrates that targeted overtime interventions on critical activities optimize time allocation without compromising cost control, while affirming the relevance of the TCTO-CPM integrated approach in construction project management. overtime wages.