S G Bharathi Dasan

Dr. S G Bharathi Dasan

orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 October 2020 in Journal of Electrical Engineering & Technology
Verified
Journal Article
Open access
PDF file
SVSYED VASIYULLAH
SYED VASIYULLAH
SDS G Bharathi Dasan
S G Bharathi Dasan
In restructured power system, Generation Companies (GENCOs) has an opportunity to sell power and reserve in power market to earn profit by market clearing process. Defining unit commitment problem in a competitive environment to maximize the profit of GENCOs while satisfying all the network constraints is called Profit Based Unit Commitment problem (PBUC). The main contribution of this paper is modeling and inclusion of Market Clearing Price (MCP) in PBUC problem. In Day market, MCP is determined by market operator which provides maximum social welfare for both GENCOs and Consumers.On other hand this paper proposes a novel combination of solution methodology: Improved Pre-prepared power demand (IPPD) table and Analytical Hierarchy method (AHP) for solving the optimal day ahead scheduling problem as an another contribution. In this method, the status of unit commitment is obtained by IPPD table and AHP provides an optimal solution to PBUC problem. Minimizing total operating cost of thermal units to provide maximum profit to GENCOs is called an optimal day ahead scheduling problem. Also it will be more realistic to redefine this problem to include multiple distributed resources and Electric vehicles with energy storage. Because of any uncertainties or fluctuation of renewable energy resources (RESs), Electric vehicles (EV) can be used as load, energy sources and energy storage. This would reduce cost, emission and to improve system power quality and reliability. So output power of solar (PS), wind output power (PW) and Electric Vehicles power (PEV) are modeled and included into day ahead scheduling problem.The proposed methodology is tested on a standard thermal unit system with or without RESs and EVs. Cost and emission reduction in a smart grid by maximum utilization of EVs and RESs are presented in this literature. It is indicated that the proposed method provides maximum profit to GENCOs when compared to other methodologies such as Memory Management Algorithm, Improved Particle Swarm Optimization (PSO), Muller method, Gravitational search algorithm etc.

7 October 2014 in International Transactions on Electrical Energy Systems
Verified
Journal Article
Closed access
PDF file
SDS G Bharathi Dasan
S G Bharathi Dasan
RKRaguru Pandu Kumudinidevi
Raguru Pandu Kumudinidevi
SRSharon Ravichandran
Sharon Ravichandran
This paper presents an optimum design procedure for the coordinated tuning of machine side converter (MSC) and grid side converter (GSC) controllers of permanent magnet synchronous generator (PMSG)-based wind energy conversion system (WECS). The MSC and GSC controller parameters are determined by simultaneously optimizing the performance indices. The performance indices considered are maximum peak overshoot (MPOSω) and settling time (Tssω) of the generator speed and the maximum peak overshoot (MPOSVdc), maximum peak undershoot (MPUSVdc) and settling time (TssVdc) of DC-link voltage. The coordinated controller design is carried out in two steps. The first step is to arrive at the analytical expression that relates the performance indices and the controller parameters. This is achieved using response surface methodology. In the second step, the determination of controller parameters is posed as a constrained multi-objective optimization problem. The constrained multi-objective optimization problem is solved using non-dominated sorted genetic algorithm II. The proposed methodology is tested on a sample system with PMSG-based WECS, and results are compared with conventional and genetic algorithm-based design techniques. Simulation results demonstrate the effectiveness of the proposed methodology. Copyright © 2014 John Wiley & Sons, Ltd.

23 January 2025
Verified
Book Chapter
Closed access
PDF file
SDS G Bharathi Dasan
S G Bharathi Dasan
SMShankar Murugan
Shankar Murugan
DGD. M. Girija
D. M. Girija
KAK. Akshaya
K. Akshaya
JDJ. B. Deebika
J. B. Deebika