Sirui Mao

Mr. Sirui Mao

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 October 2024 in Sensors
Verified
Journal Article
Open access
PDF file
SSSiya Sun
Siya Sun
SMSirui Mao
Sirui Mao
XXXusheng Xue
Xusheng Xue
CWChuanwei Wang
Chuanwei Wang
HMHong wei Ma
Hong wei Ma
HSHao Su
Hao Su
At present, China’s coal mine permanent tunneling support commonly uses mechanized drilling and anchoring equipment; there are low support efficiency, labor intensity, and other issues. In order to further improve the support efficiency and liberate productivity, this paper further researches the trajectory planning of the drilling and anchoring materials of the robotic arm for the drilling machine “grasping–carrying–loading–unloading” on the basis of the drilling and anchoring robotic system designed by the team in the previous stage. Firstly, the kinematic model of the robotic arm with material was established by improving the D-H parameter method. Then, the working space of the robotic arm with the material was analyzed using the Monte Carlo method. The singular bit-shaped region of the robotic arm was restricted, and obstacles were removed from the working space. The inverse kinematics was utilized to solve the feasible domain of the robotic arm with material. Secondly, in order to avoid blind searching, the guidance of the Bi-RRT algorithm was improved by adding the target guidance factor, and the two-way tree connection strategy for determining the feasible domain was combined with the Bi-RRT algorithm’s feasible domain judgment bi-directional tree connection strategy to improve the convergence speed of the Bi-RRT algorithm. Then, in order to adapt to the dynamic environment and avoid the global planning algorithm from falling into the local minima, on the basis of the above planning methods, an improved Bi-RRT trajectory planning algorithm incorporating the artificial potential field was proposed, which takes the planned paths as the guiding potential field of the artificial potential field to make full use of the global information and avoid falling into the local minimization. Finally, a simulation environment was built in a ROS environment to compare and analyze the planning effect of different algorithms. The simulation results showed that the improved Bi-RRT trajectory planning algorithm incorporating the artificial potential field improved the optimization speed by 69.8% and shortened the trajectory length by 46.6% compared with the traditional RRT algorithm.

17 March 2026 in Measurement Science and Technology
Verified
Journal Article
Closed access
PDF file
Shuai HaoShuai Hao
Shuai Hao
SMSirui Mao
Sirui Mao
XMXu Ma
Xu Ma
TQTianrui Qi
Tianrui Qi
SFShiao Fan
Shiao Fan
TLTianqi Li
Tianqi Li
To address the challenge of multi-scale fault targets that compromise detection accuracy in complex environments, this paper proposes MGBFNet, a Multi-Scale Fault Detection Network for Transmission Lines based on Gated Mechanism and Bidirectional Feature Fusion. First, to address the issue of low accuracy in multi-scale object detection under complex environmental interference, gated multi-order aggregation module (GMAM) is proposed, which enhances multi-scale feature perception through parallel multi-order convolutions and adaptive gated aggregation mechanisms. Secondly, to address the problem of target occlusion arising from shooting angle changes, a bidirectional information exchange and fusion module (BIEFM) is desiged. Through hierarchical bidirectional information exchange between dual-stream networks, complementary global structural features are dynamically extracted, thereby enhancing feature fusion performance. Thirdly, to alleviate the problem of low accuracy caused by unbalanced sample numbers, the Slide loss function is incorporated to dynamically balance the weights of simple and difficult samples. Finally, to rigorously evaluate the effectiveness of the proposed approach, a dataset encompassing fault samples from twelve distinct categories was constructed, and extensive comparative experiments were performed against ten well-established detection methods. According to the experimental results, the suggested method can detect multi-scale fault targets on power transmission lines with an accuracy of up to 95.4\% in complex environments, which is an increase of 4.6\% compared with YOLOv8 and 4.1\% compared with YOLOv11.

2 February 2026 in Sensors
Verified
Journal Article
Open access
PDF file
SSSiya Sun
Siya Sun
XHXiaotong Han
Xiaotong Han
HMHong wei Ma
Hong wei Ma
HYHaining Yuan
Haining Yuan
SMSirui Mao
Sirui Mao
HSHao Su
Hao Su
To address the limited environmental perception capability and the difficulty of achieving consistent and efficient representation of the workspace feasible domain caused by high dust concentration, uneven illumination, and enclosed spaces in underground coal mines, this paper proposes a digital spatial construction and representation method for underground environments by integrating RGB-D depth vision with ORB-SLAM3. First, a ChArUco calibration board with embedded ArUco markers is adopted to perform high-precision calibration of the RGB-D camera, improving the reliability of geometric parameters under weak-texture and non-uniform lighting conditions. On this basis, a “dense–sparse cooperative” OAK-DenseMapper Pro module is further developed; the module improves point-cloud generation using a mathematical projection model, and combines enhanced stereo matching with multi-stage depth filtering to achieve high-quality dense point-cloud reconstruction from RGB-D observations. The dense point cloud is then converted into a probabilistic octree occupancy map, where voxel-wise incremental updates are performed for observed space while unknown regions are retained, enabling a memory-efficient and scalable 3D feasible-space representation. Experiments are conducted in multiple representative coal-mine tunnel scenarios; compared with the original ORB-SLAM3, the number of points in dense mapping increases by approximately 38% on average; in trajectory evaluation on the TUM dataset, the root mean square error, mean error, and median error of the absolute pose error are reduced by 7.7%, 7.1%, and 10%, respectively; after converting the dense point cloud to an octree, the map memory footprint is only about 0.5% of the original point cloud, with a single conversion time of approximately 0.75 s. The experimental results demonstrate that, while ensuring accuracy, the proposed method achieves real-time, efficient, and consistent representation of the 3D feasible domain in complex underground environments, providing a reliable digital spatial foundation for path planning, safe obstacle avoidance, and autonomous operation.