Non-geostationary orbit (NGSO) constellations enabled by beam hopping (BH) technology are characterized by wide coverage and high spectrum efficiency. However, how to efficiently schedule multi-satellite beam resources to satisfy the heterogeneous and uneven terrestrial traffic demands remains a huge challenge for satellite operators. This paper proposes a satellite-terrestrial coordinated multi-satellite BH scheduling framework, where the complex multi-satellite BH problem is formulated into a long-term and a short-term subproblems. The long-term subproblem is cell-satellite association problem, which is solved by a low-complexity iterative algorithm executed in network operation control center (NOCC) to minimize the traffic load gap among satellites while considering the interference avoidance. The short-term subproblem is multi-satellite traffic-driven BH problem and we propose a multi-agent deep reinforcement learning (MADRL) architecture where each satellite can cooperatively make real-time BH decisions using the well-trained model by QMIX algorithm to adapt to time-varying and heterogeneous traffic. Simulation results demonstrate that the traffic load gap and network delay have been reduced by 70% and 50% respectively compared with non-load-balancing scheme. Besides, the proposed algorithm outperforms other benchmarks in terms of the network throughput under various traffic load cases and the average network delay is kept within 4 ms. Furthermore, the proposed QMIX-BH can be applied to real-time scheduling since the execution time is less than 1 ms.
Underground mining is known to cause the deformation and failure of the surrounding rocks and frequently associated with water-inrush through the mine floor. In this study, in-situ strain tests along with borehole imaging measurements were utilized to investigate the deformation and failure characteristics of the rock mass of the mine floor caused by mining. We directly measured the strain and borehole images of the rocks in the mine floor at different depths in five coal mines in the Yanzhou mining area, China. We observed from plotting the increments of strain that mining caused and then led to the deformation and failure of the rock mass of the mine floor. The zone in the floor that was affected by stress from mining was over 170 m in length and decreases with depth. We also found that the depth of failure in floor of the five different coal mines varied between 8.4 to 20 m.