Xu Zhang

Dr. Xu Zhang

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2017 in International Journal of Geomechanics
Verified
Journal Article
Closed access
XZXu Zhang
Xu Zhang
CZChunfa Zhao
Chunfa Zhao
WZWanming Zhai
Wanming Zhai
Considering the real irregular shapes of ballast particles and complete track skeleton, a two-dimensional discrete element model is built to investigate the dynamic behavior of high-speed railway (HSR) ballasted track. Taking the moving wheel loads obtained from railway vehicle-track coupled dynamics simulation as the excitation inputs, the dynamic behavior of ballast particles in terms of contact force, stress, and vibration response are simulated using the discrete element model. Numerical results show that the ballast particles within the depth of 200 mm under sleepers would be most likely to carry a higher stress level when a vehicle passes by. Vibration amplitudes of ballast particles increase with the increase of vehicle speed, and the acceleration amplitudes rise sharply when the vehicle speed is higher than 200 km/h. Spectrum analyses indicate that the dominant frequencies of particle displacement and velocity are lower than 100 Hz, whereas the acceleration responses contain not only low-f...

1 May 2019 in Soil Dynamics and Earthquake Engineering
Verified
Journal Article
Closed access
XZXu Zhang
Xu Zhang
CZChunfa Zhao
Chunfa Zhao
WZWanming Zhai
Wanming Zhai

1 October 2019 in Construction and Building Materials
Verified
Journal Article
Closed access
GJGuoqing Jing
Guoqing Jing
XZXu Zhang
Xu Zhang
WJWenli Jia
Wenli Jia

11 December 2018 in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
Verified
Journal Article
Closed access
XZXu Zhang
Xu Zhang
CZChunfa Zhao
Chunfa Zhao
WZWanming Zhai
Wanming Zhai
CSCan Shi
Can Shi
YFYang Feng
Yang Feng
This paper presents a full-scale laboratory test for investigating the track settlement and ballast degradation of the ballasted track–subgrade system on the high-speed railways. The test was carried out on a full-scale test platform with a ballasted track–subgrade system constructed exactly according to the construction standards of high-speed railways in China. In this test, four million cycles of cyclic loads simulating repeated high-speed train loads with an axle load of 140 kN were applied to the ballasted track–subgrade system through a specialized loading system. The vertical displacement and settlement of the rail, the sleepers and the subgrade at various sections and depths were recorded during the test. The test results show that the settlement of the high-speed railway ballasted track is very less. A logarithmic model was proposed for predicting the settlement of the high-speed railway ballasted track by fitting the measured data. Moreover, some painted ballast samples were embedded into the tested track to investigate the ballast degradation. After the test, it was found that more than 80% of the painted ballast grains remained intact and less than 20% were degraded. Four different ballast degradation phenomena were observed: corner or edge breakage, surface scratch, surface crack and the production of fine particles. The test results indicate that the high-speed railway ballasted tracks in China are very stable and the settlement is less under long-term cyclic loads, which could significantly benefit the track geometry and the railway maintenance work.

1 July 2020 in Journal of Building Engineering
Verified
Journal Article
Closed access
CZChao Zou
Chao Zou
YWYimin Wang
Yimin Wang
XZXu Zhang
Xu Zhang
ZTZiyu Tao
Ziyu Tao

4 August 2023 in Construction and Building Materials
Verified
Journal Article
Closed access
CSCan Shi
Can Shi
YZYu Zhou
Yu Zhou
LXLei Xu
Lei Xu
XZXu Zhang
Xu Zhang
YGYunlong Guo
Yunlong Guo