Bohao Mei

Dr. Bohao Mei


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
QZQinghua Zhang
Qinghua Zhang
BMBohao Mei
Bohao Mei
HYHui Yang
Hui Yang
XHXin Hu
Xin Hu
WAWei An
Wei An
ZWZhihao Wang
Zhihao Wang
With the expansion of high-rise building construction in China, tower cranes have become indispensable key equipment in the construction industry. To ensure the safety and structural reliability of tower cranes under complex working conditions, this paper takes a typical 40 m-high flat-arm tower crane as the research object. For the first time, the orthogonal test method was used to monitor the stress of key components (the root of the tower body and the root of the boom). The stress distribution characteristics of the tower crane structure under different working conditions were systematically analyzed. Then, based on the power spectral density analysis method, the natural frequency of the tower crane structure was identified. The influence of key structural parameters, such as lifting position, rope length, and lifting weight, on the stress of the tower crane was quantitatively studied through orthogonal experiments, revealing the multi-parameter coupling effect. The results show that the stress at the measuring point at the root of the tower body is significantly higher than that at the root of the boom. This indicates that the root of the tower body is the primary stress-bearing part of the tower crane structure, highlighting the need to focus on its fatigue performance and safety assessment. Based on the power spectral density analysis of the root stress of the tower crane, the natural frequencies of the tower crane structure were accurately identified. The first-order frequency was 0.10 Hz, and the second-order frequency was 0.20 Hz, providing data support for the study of the tower crane’s dynamic characteristics. The orthogonal test analysis shows that the influences of lifting position, rope length, and lifting weight on the stress of the tower crane are consistent, with no significant differences. The effects of lifting position and rope length on stress are dominant, while the influence of lifting weight is relatively small. These research findings provide an important basis for the lightweight design and safety assessment of tower cranes.

11 February 2026 in Buildings
Verified
Journal Article
Open access
PDF file
QZQinghua Zhang
Qinghua Zhang
BMBohao Mei
Bohao Mei
KWKaiqiang Wang
Kaiqiang Wang
XHXin Hu
Xin Hu
HYHui Yang
Hui Yang
ZWZhihao Wang
Zhihao Wang
This study systematically investigates the effects of rope length, lifting position, and load on the dynamic behavior and wind-induced fatigue life of flat-jib tower cranes. Firstly, natural frequencies of a representative crane (40 m tower, 66 m jib) were accurately identified via on-site stress measurements. Subsequently, a finite element model was developed to analyze free vibration characteristics under various operational conditions. Fluctuating along-wind loads were simulated using harmonic synthesis, and transient dynamic analysis provided the wind-induced response. Finally, fatigue life of critical components was assessed through rain-flow counting, S–N curves per Chinese and European standards, and Miner’s linear damage rule. The results indicate that the first-order natural frequency in the along-wind direction decreases by approximately 12.5% and 14.2% with increasing lifted load and rope length, respectively, while the frequency at the jib tip is reduced by up to 37% compared to that at the jib root. Structural responses are more pronounced in the along-wind direction, predominantly exciting the first-order mode. Under operational conditions, stress in the jib’s main chord increases by approximately 30% to 50%, whereas stress fluctuations in other jib sections remain minimal. The fatigue life of tower crane components decreases by 13% to 21% relative to the unloaded state, with rope length exerting a greater influence than lifting load magnitude.