Sergio Scheer

Prof. Dr. Sergio Scheer

orcid

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 June 2020 in Built Environment Project and Asset Management
Verified
Journal Article
Closed access
JCJulianna Crippa
Julianna Crippa
AAAline M.F. Araujo
Aline M.F. Araujo
DBDiogo Bem
Diogo Bem
CUCássia M.L. Ugaya
Cássia M.L. Ugaya
SSSergio Scheer
Sergio Scheer
Purpose: This paper searches for integration methods proposed by different authors that assess the life cycle of a building using models of building information modeling (BIM) and it also compares and discusses them.Design/methodology/approach: Systematic literature review (SLR) is selected as the main research method of the present paper, aiming to collect and critically analyze multiple research studies. This paper is not only limited to studies where the whole life cycle has been assessed but also includes other papers which only integrated BIM to analyze carbon footprint, embodied carbon dioxide (CO2) or energy consumption.Findings: Taking into account the countries that have published articles about the subject, it is possible to deduce that it has been studied in all of the continents, except Africa. In comparison with other continents, Asia and Europe have developed more studies. Furthermore, 76% of the 34 selected articles were published in journals and only 24% in conferences proceedings, and the number of papers that relates life cycle assessment (LCA) methods using BIM has grown from 2013 to 2015, proving that the current theme is relevant. Several aspects of this literature review show the need to develop automated processes for LCA of buildings during the project's development phase. There is already a tendency to compare LCA results for buildings applied to BIM models, contributing to decision-making related to alternate projects, selection of materials, suppliers and components from an environmental perspective.Originality/value: In the current global scenario, it is the notorious negative impact on the environment over the years caused by the architecture, engineering and construction industry (AEC). The integration of BIM–LCA can reduce time and improve the application of environmental analysis. Moreover, the proper application of a LCA method to evaluate the environmental impacts of the project can be hindered due to lack of information in the database about the materials or due to failures in the interoperability between BIM software and the LCA tool.

1 January 2022 in Gestão & Produção
Verified
Journal Article
Open access
CCCaroline Wilsek Caldart
Caroline Wilsek Caldart
SSSergio Scheer
Sergio Scheer
Adequate construction site planning provides productivity and safety gains and reduces material transportation costs. However, as they take a dynamic structure, the construction site layout planning is quite often complex and inefficient. 4D BIM modeling helps to visualize the spatial layout of objects on the construction site throughout the project establishing their positioning during a specific time, thus providing better results for the physical use of space. By using the Design Science Research method, this article aims to establish a process using 4D BIM modeling to implement the planning and management of construction sites taking into account their key characteristic, dynamism.

17 June 2014
Verified
Conference Paper
Closed access
SSSergio Scheer
Sergio Scheer
JMJr. R. Mendes
Jr. R. Mendes
TCT. F. Campestrini
T. F. Campestrini
MGM. C. Garrido
M. C. Garrido
This paper presents a practical application for the integration of Building Information Modeling (BIM) with scheduling and cost planning. It also describes the steps undertaken to plan and re-plan a project at each new decision taken by the multidisciplinary team. The study was conducted during the development of a low income housing enterprise near the city of Curitiba in Brazil. The undertaken application demonstrates how to extract information from the BIM model for use in production planning and control on site construction. Throughout the work breakdown structure and the unit costs for bill of materials, the model can be integrated with planning and helps the execution phase as well. With 4D/5D simulation, the information and decision-making of the design phase is taken to the construction site. The results show some decisions and uses of the integrated model in the design phase and in production planning and control on the construction site. Some difficulties experienced by the development team are also reported. The main conclusions of this study confirm the advantages and disadvantages of using 4D/5D BIM modeling found in the literature, such as supporting lean construction principles on production.

1 December 2017 in Ambiente Construído
Verified
Journal Article
Open access
PDF file
FMFernanda Almeida Machado
Fernanda Almeida Machado
RRRegina Coeli Ruschel
Regina Coeli Ruschel
SSSergio Scheer
Sergio Scheer
A difusão acadêmica da Modelagem da Informação da Construção (BIM) no Brasil configurou-se em um relevante vetor de crescimento na última década. Entretanto, embora seu acervo indique robustez, constata-se o escasso monitoramento da produção científica nacional. Devido à falta de apropriação de indicadores de desenvolvimento e aos entraves na identificação de lacunas de conhecimento dos estudos já realizados, observa-se ausência de diretrizes que condicionem novas investigações. Nesse âmbito, o presente trabalho tem como objetivo analisar a produção científica brasileira sobre BIM no país. Trata-se de uma pesquisa exploratória de caráter bibliográfico que apresenta o levantamento da produção científica brasileira em um intervalo temporal definido entre 2000 e 2015. Por meio do uso de indicadores bibliométricos e cientométricos, as contribuições geradas destacam (i) a evolução temporal da produção bibliográfica e de formação de recursos humanos; (ii) os níveis de produção bibliográfica por pesquisador e produção de formação de pesquisadores por região e instituição; (iii) as palavras-chave mais utilizadas; e (iv) os métodos científicos empregados em dissertações e teses. Analisa-se, dessa forma, o perfil evolutivo da produção científica no Brasil.

11 July 2022 in PARC: Pesquisa em Arquitetura e Construção
Verified
Journal Article
Open access
PDF file
EBElis Mayumi Yamamoto Borrelli
Elis Mayumi Yamamoto Borrelli
SSSergio Scheer
Sergio Scheer
Os gerentes de instalações gastam muito tempo para encontrar as informações necessárias para apoiar suas atividades de manutenção e operação. Para melhorar o desempenho na identificação das informações a Modelagem da Informação da Construção (Building Information Modeling - BIM) pode ser utilizada. A presente pesquisa teve como objetivo explorar uma estrutura de requisitos para aplicação de um projeto desenvolvido em BIM de modo a gerar modelos adequados ao uso no gerenciamento da manutenção e operação de edifícios. A estratégia de pesquisa foi a de um estudo de caso, utilizando um projeto piloto desenvolvido em BIM, em LOD 300, que foi atualizado para a utilização em atividades de manutenção e operação. Para a transferência dos dados utilizou-se ferramentas como o Revit e o YouBIM e o esquema de dados COBie. Também foi exposto como o setor de manutenção e operação opera atualmente (as-is) e, futuramente, como poderá melhorar (to-be) com a utilização do BIM aliado a um software de Facility Management (FM) para auxiliar no gerenciamento das atividades de manutenção e operação das edificações. Além disso, foram expostos os desafios da importação de dados, a integração da documentação de FM com o BIM, o controle de qualidade de dados do BIM e os elementos que foram atualizados para o LOD 500. Como resultados do estudo de caso, foi elaborado um quadro com os requisitos utilizados nesta pesquisa para a aplicação do BIM em FM para manutenção e operação e, como contribuição, foi apresentada uma sugestão de fluxo em BIM para FM utilizando a notação Buissiness Process Modelling Notation (BPMN).