Yuqi Ao

Dr. Yuqi Ao


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 July 2024 in Energies
Verified
Journal Article
Open access
PDF file
LSLei Su
Lei Su
WWWenxiang Wu
Wenxiang Wu
WFWangli Feng
Wangli Feng
JQJunda Qin
Junda Qin
YAYuqi Ao
Yuqi Ao
With the development of the power distribution Internet of Things (IoT), the escalating power demand of data centers (DCs) poses a formidable challenge to the operation of distribution networks (DNs). To address this, the present study considers the operational flexibility of DCs and its impact on DNs and constructs a collaborative planning framework of DCs, renewable energy sources (RESs), and DNs. This framework employs the interval optimization method to mitigate uncertainties associated with RES output, wholesale market prices, carbon emission factors, power demand, and workloads, and the collaborative planning model is transformed into an interval optimization problem (IOP). On this basis, a novel hybrid solution method is developed to solve the IOP, where an interval order relation and interval possibility method are employed to transform the IOP into a deterministic optimization problem, and an improved integrated particle swarm optimization algorithm and gravitational search algorithm (IIPSOA-GSA) is presented to solve it. Finally, the proposed planning framework and solution algorithm are directly integrated into an actual integrated system with a distribution network and DC to verify the effectiveness of the proposed method.

11 September 2026 in Energies
Verified
Journal Article
Open access
PDF file
CYChang Ye
Chang Ye
XXXun Xu
Xun Xu
LXLiangli Xiong
Liangli Xiong
MXMenghan Xiao
Menghan Xiao
KJKezheng Jiang
Kezheng Jiang
LZLu Zhang
Lu Zhang
High photovoltaic penetration makes active distribution networks sensitive to voltage deviations, reverse power flow, and feeder operating stress. Energy storage converters can provide two complementary services: active power energy shifting and local, within-step reactive power support for voltage regulation. This paper develops a converter-aware multi-objective siting and sizing model in which installation buses, energy capacities, and PCS ratings are optimized jointly. The model explicitly represents the P-Q capability circle, voltage-droop reactive power command, reactive headroom, SOC limits, radial power flow, voltage deviation, and network loss; annualized cost and throughput-based degradation are retained as bounded planning terms rather than the sole design target. An adaptive multi-objective differential evolution (AMODE) algorithm solves the mixed discrete–continuous nonlinear problem using Latin hypercube initialization, adaptive mutation and crossover, hybrid mutation, an external archive, feasibility repair, and TOPSIS selection. IEEE33 and IEEE69 case studies are evaluated over thirty independent runs. In IEEE33, the selected plan raises the minimum voltage from 0.8866 to 0.9579 p.u. and reduces daily losses by 11.70%. The ablation study shows that removing PCS reactive support reduces the minimum voltage to 0.9190 p.u., demonstrating the technical role of converter-based Q support. The larger IEEE69 experiments further assess Pareto-front quality, feasibility, and statistical robustness. The hourly quasi-static formulation represents local converter action within each planning interval; it does not evaluate sub-second control or electromagnetic transients.

22 August 2026 in Energies
Verified
Journal Article
Open access
PDF file
JLJiacheng Li
Jiacheng Li
CYChang Ye
Chang Ye
MXMenghan Xiao
Menghan Xiao
XXXun Xu
Xun Xu
YAYuqi Ao
Yuqi Ao
YGYuwei Gui
Yuwei Gui
Renewable power plants connected to low-system-strength grids are increasingly dominated by inverter-based resources (IBRs). Their point of common coupling (PCC) voltage is therefore shaped not only by reactive-power support but also by active-power ramps, network impedance, short-circuit capacity, and converter limits. Conventional Q-V droop control, fixed power-factor control, Volt/VAR control, and fixed active-power/reactive-power (P/Q) decoupling schemes often absorb active-power excursions into the voltage error, which can drive excessive reactive-power injection during fault clearing, post-fault power recovery, and phase-angle disturbances. Here, an active-power–voltage-coupling-aware reactive-power compensation (APVQ-RC) method is proposed for plant-level voltage control. The method estimates local P-V and Q-V voltage sensitivities online, reconstructs an effective voltage error, and produces a capacity-constrained reactive-power reference through smooth coupling activation. The reduced-order evaluation includes estimator conditioning, excitation screening, sensitivity-estimation error and empirical 95% estimator-error intervals, sensitivity to the smoothing factor and window length, measurement noise, converter capability saturation, and computational timing. Under P-V-coupled transients, APVQ-RC reduces voltage overshoot and reactive-power compensation energy while retaining Q-V-like support during voltage-sag-dominated events. Compared with the best scanned fixed P/Q baseline, it reduces overshoot, reactive-power compensation energy, and reactive-power peak by 42.03%, 60.35%, and 8.90%, respectively; the representative single-step calculation time is 0.0188 ms within a 1 ms control cycle. These results indicate millisecond-scale plant-level feasibility within the reduced model, while electromagnetic-transient, hardware-in-the-loop, and field validation remain necessary before deployment.

18 October 2026 in Energies
Verified
Journal Article
Open access
PDF file
MXMenghan Xiao
Menghan Xiao
XXXun Xu
Xun Xu
CYChang Ye
Chang Ye
JLJiacheng Li
Jiacheng Li
QHQixiang Huang
Qixiang Huang
YAYuqi Ao
Yuqi Ao
Forecast-driven dispatch studies for renewable-storage microgrids can be weakened by feature leakage, non-receding dispatch windows, and inconsistent planned/realized evaluation scopes. This article presents a reproducible workflow-oriented low-code audit for an islanded photovoltaic (PV)-battery benchmark with secondary wind generation using public NASA Prediction Of Worldwide Energy Resources (POWER) weather and New York Independent System Operator (NYISO) load proxy data. The main direct multi-horizon forecast uses only calendar, lag, and rolling features; contemporaneous meteorological variables are reserved for a weather-informed diagnostic case. A mixed-integer linear programming (MILP) dispatch implemented with PuLP and COIN-OR Branch-and-Cut (CBC) enforces binary charge/discharge exclusivity, terminal battery state-of-charge (SOC) control, and true rolling-horizon execution in which each 24 h solve implements only the first action. All dispatch comparisons are filtered to the same 1694 complete forecast origins. On this common horizon, actual load totals 817.204 MWh and renewable availability totals 730.291 MWh. Relative to a rule-based baseline, the MILP reduces realized load shedding from 9.201 to 6.474 MWh and the normalized weighted objective from 10.769 to 8.203 million scenario-cost units. Weight, battery-capacity, renewable-penetration, and throughput-penalty analyses, together with bootstrap uncertainty intervals, show where this conclusion is robust and where it is benchmark-dependent. The contribution is an auditable evidence chain connecting public data, leakage-controlled forecasts, rolling-horizon dispatch, realized recourse accounting, generated figures/tables, and supplementary quality records; it is not a field validation or proprietary microgrid deployment study.

30 October 2026 in Energies
Verified
Journal Article
Open access
PDF file
MXMenghan Xiao
Menghan Xiao
XXXun Xu
Xun Xu
LZLu Zhang
Lu Zhang
KJKezheng Jiang
Kezheng Jiang
YAYuqi Ao
Yuqi Ao
JLJiacheng Li
Jiacheng Li
Efficient operation of LCL-filtered grid-connected photovoltaic inverters under uncertain grid conditions requires coordinated treatment of passive-filter and current-controller interactions. This study addresses the interaction mechanism between passive LCL network parameters and active controller parameters through a systematic simultaneous passive–active co-design framework for a 10 kW inverter. A controlled five-strategy M1–M5 comparison separates conventional, control-only, passive-network-only, sequential, and simultaneous designs under a common plant, delay, modulation, switching, FFT, and uncertainty-validation protocol. Multi-objective search is supported by fast physical indicators, while leakage-free Gaussian process regression is used only as a candidate-screening accelerator before direct switching verification. The selected M5 design achieves a switching-model current total harmonic distortion of 0.8004%, passive damping loss of 8.236 W, and nominal phase and gain margins of 59.13° and 8.13 dB, respectively. Across 1000 shared Monte Carlo samples, its strict acceptance ratio is 98.3%, with zero true discrete-pole instability; rejected samples are conservative all-crossover margin anomalies. These simulation-based results indicate that M5 provides a balanced engineering compromise among harmonic performance, damping loss, dynamic response, and robustness rather than a design that dominates every individual metric. Gaussian process regression reduces screening cost but neither defines the objective nor replaces high-fidelity validation. Hardware-in-the-loop and experimental validation remain future work.

13 November 2026 in Energies
Verified
Journal Article
Open access
PDF file
KJKezheng Jiang
Kezheng Jiang
YAYuqi Ao
Yuqi Ao
CYChang Ye
Chang Ye
XXXun Xu
Xun Xu
MXMenghan Xiao
Menghan Xiao
In islanded microgrids, a sudden drop in photovoltaic (PV) power causes severe frequency dips, whereas grid-forming energy storage relying on droop control alone exhibits a steady-state deviation that cannot be eliminated; increasing the damping coefficient converges only slowly and is constrained by the droop regulation ratio and the frequency deadband. To address this, this paper proposes a two-timescale frequency control method based on meteorological warnings. On the slow timescale, meteorological warnings are used to apply active-power feedforward against the PV drop caused by cloud passage, compressing the disturbance that droop must compensate from the entire power deficit to the prediction residual; on the fast timescale, virtual inertia and damping are pre-scheduled according to the bound of the prediction residual, raised before the disturbance and released afterwards. An input-to-state stability (ISS) theorem is established for the closed-loop system, proving that the frequency deviation is input-to-state stable with respect to the bounded prediction residual, from which the inertia/damping scheduling law and the feasible residual region are derived. Using a random forest predictor trained on three years of hourly measured meteorological data from a region in Hubei, together with a four-method benchmark and end-to-end ablation experiments, the results show that under an 85% PV drop the proposed method restores the steady-state frequency from 48.33 Hz to 50.00 Hz and reduces the maximum rate of change of frequency (RoCoF) in the fast transient from 0.81 Hz/s to 0.17 Hz/s with feedforward alone and to 0.06 Hz/s with the complete two-timescale controller; with a real event-level prediction error of 0.064, the steady-state compliance rate (not lower than 49.8 Hz) reaches 91.7% using the empirical event-level error distribution (94.4% under the Gaussian approximation), far above that of conventional droop control.