Jing Huang

Dr. Jing Huang


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 April 2025 in Sensors
Verified
Journal Article
Open access
PDF file
JHJiaqi Hu
Jiaqi Hu
HXHan Xiao
Han Xiao
YZYe Zhihao
Ye Zhihao
NLningzhao luo
ningzhao luo
JHJing Huang
Jing Huang
This paper focuses on the application of digital twins in the field of electric motor fault diagnosis. Firstly, it explains the origin, concept, key technology and application areas of digital twins, compares and analyzes the advantages and disadvantages of digital twin technology and traditional methods in the application of electric motor fault diagnosis, discusses in depth the key technology of digital twins in electric motor fault diagnosis, including data acquisition and processing, digital modeling, data analysis and mining, visualization technology, etc., and enumerates digital twin application examples in the fields of induction motors, permanent magnet synchronous motors, wind turbines and other motor fields. A concept of multi-phase synchronous generator fault diagnosis based on digital twins is given, and challenges and future development directions are discussed.

7 May 2026 in Energies
Verified
Journal Article
Open access
PDF file
YPYonglin Peng
Yonglin Peng
JHJing Huang
Jing Huang
BPBingchen Pan
Bingchen Pan
HLHaiJun Liu
HaiJun Liu
HXHan Xiao
Han Xiao
To address non-complete data issues such as missing, distorted, redundant and chaotic data in distribution network condition monitoring data easily caused by ship faults (e.g., sensor failure, cable short circuit, etc.), an improved optimization algorithm (IPS-SH5N1) considering the demand for incomplete information reconstruction in the distribution network of ship integrated power systems is proposed based on the SH5N1 meta-heuristic optimization algorithm. This algorithm is used to optimize the weights and thresholds of a BPNN, achieving accurate completion of non-complete information in the distribution network. The IPS-SH5N1-BPNN is applied to conduct information reconstruction verification on 2000 groups of incomplete data samples of ship integrated power systems. The results show that the information reconstruction accuracy (MSE) of this method is improved by more than 90% compared with the BPNN; the model training convergence time and global optimization time consumption are significantly shortened, and the average online single information reconstruction time is reduced to 4.45 ms. This method has core advantages of high precision, fast convergence, strong robustness and excellent real-time performance, which can provide reliable technical support for the intelligent operation and maintenance of ship integrated power systems.