Research on modeling of cascaded hybrid modular inverters has concentrated on conventional H-bridge topologies. In addition, research on hybrid H-bridge that gives a five-level output voltage is well documented, but a detailed analysis on how this model can be cascaded has not been researched on. This paper presents a detailed modeling analysis of a cascaded hybrid modular inverter topology. First a PWM control law is derived and used in developing a novel switching model. Derived state space equations are used in a developing generalized N-cascaded hybrid model. Simplified average models both in abc to dqo are proposed and described. Finally, small signal model computed in dq synchronous frame is developed. Feedback controller design is presented with main focus on grid voltage regulation and overall system capacitor voltage balance. A modular balance circuit is proposed for individual cell capacitor voltage. Both the MATLAB simulation and laboratory results show good performance of the proposed PWM control scheme and the accuracy of the hybrid model.
Distributed generators (DGs) offer significant advantages to electric power systems, including improved system losses, stability, and reduced losses. However, realizing these benefits necessitates optimal DG site selection and sizing. This study proposes a traditional multiobjective particle swarm optimization (PSO) approach to determine the optimal location and size of renewable energy-based DGs (wind and solar) on the Namibian distribution system. The aim is to enhance voltage profiles and minimize power losses and total DG cost. Probabilistic models are employed to account for the random nature of wind speeds and solar irradiances. This is used in an algorithm which eventually optimizes the siting and sizing of DGs using the nearest main substation as reference. The proposed method is tested on the Vhungu-Vhungu 11 kV distribution network in Namibia. Four cases were considered: base case with no DG, solar power, wind power, and a hybrid of both wind and solar. Optimal values for each case are determined and analyzed: 0.69.93 kW at 26 km for solar PV-based DG and 100 kW at 42 km for wind-based DG. These findings will serve as a valuable blueprint for future DG connections on the Namibian distribution network, providing guidance for optimizing system performance.
The rapid expansion of variable renewable energy (VRE) presents both opportunities and challenges for sustainable energy systems. Green hydrogen is emerging as a key solution for large-scale storage and decarbonization of hard-to-electrify sectors. However, direct coupling of electrolyzers to VRE introduces operational volatility, accelerated degradation, and complex dispatch challenges that conventional rule-based and optimization-based methods cannot fully address. This paper proposes a Guided Safe Reinforcement Learning framework for adaptive energy management in green hydrogen systems. The method integrates Soft Actor-Critic (SAC) with a deterministic two-branch safety shield that ensures feasibility at execution time by construction, regardless of the action proposed by the policy, guaranteeing that battery state-of-charge limits and electrolyzer operating mode constraints are satisfied at every timestep. The framework further incorporates an intervention-aware corrective reward signal which converts each shield event into a structured learning signal and a Self-Guided Memory (SGM) mechanism that replays shield-corrected feasible transitions to bias the policy toward constraint-satisfying regions, causing shield intervention frequency to self-reduce as the policy improves. The framework is validated on a HOMER-sized green hydrogen system using year-long renewable profiles of Purros area in Namibia. Under identical safety enforcement and across four independent random seeds, the proposed guided agent achieves a 3.5% increase in hydrogen production (p = 0.003) and a 29.2% reduction in electrolyzer cycling cost (p = 0.007) relative to a shielded SAC baseline, with additional reductions in renewable curtailment (12.9%) and battery degradation cost (12.1%). Structural analysis further shows reduced ramp volatility, with mean electrolyzer ramp magnitude decreasing from 1.87 MW to 1.62 MW (14% reduction) and lower ramp dispersion. The guided agent also reduces the safety-shield intervention rate from 17.7% to 10.9%, indicating improved safety autonomy.
Namibia’s vast renewable energy potential positions it as a strategic location for green hydrogen production, a key vector in advancing global decarbonization objectives. Nevertheless, identifying optimal production sites remains a complex and multidimensional challenge. This study presents a comprehensive techno-economic and spatial assessment aimed at determining the most suitable areas for large-scale green hydrogen production in Luderitz, Namibia. The analysis employs the Analytical Hierarchy Process integrated with Geographic Information System techniques to evaluate and spatially prioritize potential sites. Critical criteria, including solar irradiance, wind velocity, land use, and proximity to essential infrastructure, were systematically weighted and overlayed to generate suitability classifications. The results indicate that approximately 20% of the study area exhibits high suitability, 68% moderate suitability, 8% marginal suitability, and 4% is unsuitable for the development of integrated wind and solar energy. These findings provide a robust scientific basis for guiding policy formulation, investment planning, and the spatial optimization of Namibia’s emerging green hydrogen industry.