It is becoming more difficult to develop efficiently bauxite reserve base due to the fact that mining has to be done at great depths, which are characterized by complex geological, geotechnical and geodynamic conditions. The article presents technological and economic recommendations on introduction of innovative solutions, including R&D, experimental designing and engineering development contributing to the increase in safety and economic efficiency of deep-level rockburst-hazardous mining. The main line toward a decrease in deficit of bauxite reserves in Russian is connected with the increase in efficient subsoil management by means of loss reduction in bauxite production at Sevuralboksiruda which develops rockburst-hazardous deposits at great depths. It is suggested to take into account aluminium price behavior, which has considerable influence on integrated economic effect, jointly with costs of activities aimed to prevent rockbursting (borehole stress relief, mined-out area size reduction by making temporal safety pillars, etc.). The feasibility study of variants for mining bauxite reserves in blocks of different geodynamic hazard allows concluding that under unaltered price or price decline tendency, it is rather to undertake local prevention of rock bursts, for example, borehole stress relief method. At the same time, bauxite cost and price modeling shows that the variant of mining with safety pillars is more efficient given the trend of price advance by 20–30% per year.
The paper analyses geodynamic processes in the development of the Talnakh and Oktyabrsk deposits, which have complex geological structure. It demonstrates the results of the forecast estimation of seismic energy released on the contact surface of the fault plane of type I and II tectonic dislocations when stoping approaches. The article discusses the geodynamic processes occurring during the mining of the Talnakh and Oktyabrsky deposits of complex geological structure. The results of predictive assessments of seismic energy released at the contact surface displacement of a tectonic disturbance type I and II at the approach of remediation. For practical use of the obtained graph of the dependence of critical distance from the front of the treatment works to a tectonic disturbance on the magnitude of the angle of internal friction.
This article considers the issues associated with the deep mining of bauxite ores. A need for effective development of Russian aluminum mineral resource base requires companies to reduce the ore losses emerging while moving to the deeper mining, which is characterized by sophisticated geological, technical and geodynamic mining conditions. In this article we have revealed the changing patterns of the inter-chamber pillars’ stress state and stability taking into account the influence of various mining and geological factors. Based on the mine data and the results of numerical experiments performed with the use of PRESS 3D URAL software, this research has revealed that at the depth of more than 700-800 m inter-chamber pillars enter the supercritical mode of deformation and have minimal bearing capacity. Failure to take into account the supercritical mode of deformation leads to the significant losses of ore in pillars reaching 30-50%. At the same time, the ore losses can be reduced to 15-25% by considering the residual strength and supercritical deformation of the pillars while designing their parameters. The economic result would be achieved by improving the design process of mining operations, providing increased safety of mining operations along with losses reduction leading to to increase in production volumes.