Shiao Wang

Dr. Shiao Wang


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 April 2026 in Processes
Verified
Journal Article
Open access
PDF file
CLChengxi Li
Chengxi Li
KWKai Wen
Kai Wen
FQFeilian Qin
Feilian Qin
ZWZhiwei Wei
Zhiwei Wei
SWShiao Wang
Shiao Wang
LLLing Lu
Ling Lu
With the advancement of the “dual carbon” goals, a high proportion of renewable energy sources are being widely integrated into the power grid, resulting in a power system characterized by numerous uncertainties, rapid changes in supply and demand, and strong multi-dimensional randomness. These characteristics pose new challenges to the safe and stable operation of the power grid. However, traditional power system reliability assessment methods are constrained by computational complexity, making it difficult to meet the demands for rapid assessment. To address this issue, this paper designs a data-assisted intelligent model to achieve rapid and accurate reliability assessment of power systems under the context of high-penetration renewable energy integration. Firstly, based on the coupling relationship between the unavailability rate of transmission lines and their operating conditions as well as aging effects, this paper establishes a model for the unavailability rate of transmission lines and proposes a method for selecting key components in the power grid. Subsequently, an analytical model for power grid reliability indicators concerning the reliability parameters of key components is constructed. By utilizing this analytical model to generate a large number of data samples, a Physics-Informed Neural Network (PINN) model is constructed and trained to enable rapid calculation of reliability indicators. Finally, the effectiveness and feasibility of the proposed method are validated through the IEEE standard test system. After analysis, the single-evaluation time of the proposed method is approximately 10 ms, representing a computational efficiency improvement of up to 63.2% compared to existing artificial intelligence models such as MGAT, TCN-BiGRU, etc.

3 April 2026 in Processes
Verified
Journal Article
Open access
PDF file
JOJiajun Ou
Jiajun Ou
HLHao Lu
Hao Lu
JLJingyi Li
Jingyi Li
DCDi Cai
Di Cai
Nan YangNan Yang
Nan Yang
SWShiao Wang
Shiao Wang
In the scenario where renewable energy sources (RESs) are connected to the power system (PS) through a flexible high-voltage direct current (HVDC) transmission system, their output becomes highly intermittent and volatile due to meteorological factors like wind direction and speed. This variability poses significant challenges to the real-time power balance and control of the PS. To address the uncertainties in system operation and the challenges of RES consumption, this paper proposes an artificial intelligence (AI) algorithm-driven collaborative optimization strategy for virtual power plants (VPPs) considering RESs transmitted by flexible HVDC. Firstly, a self-attention mechanism and multiple gated structures are integrated into a long short-term memory (LSTM) deep learning model. This enhancement improves the model’s ability to capture multi-timescale characteristics of RESs, increasing forecasting accuracy and robustness. Based on these forecasts, a total cost optimization model for VPP operation is developed, which includes high penalty costs for wind and solar curtailment. By embedding economic constraints that prioritize RESs usage, the model can reduce waste caused by traditional cost-driven scheduling. Additionally, to solve the high-dimensional nonlinear optimization problem in VPP scheduling, an improved population-based incremental learning (PBIL) algorithm is introduced. It incorporates an elite retention strategy and an adaptive mutation operator to boost global search efficiency and convergence speed. Simulations based on an VPP incorporating typical offshore wind and solar RESs transmitted via flexible HVDC demonstrate that the improved LSTM reduces MAPE by 7.14% for wind and 4.27% for PV compared to classical LSTM, and the proposed method achieves the lowest curtailment rates (wind 10.74%, PV 10.23%) and total cost (43,752 RMB), outperforming GA, PSO, and GW by 10–18% in cost reduction. Simulation results show that the proposed strategy enhances RESs consumption while maintaining system economy under flexible HVDC transmission. This work offers theoretical and practical insights for optimizing PS with high RES penetration and supports the low-carbon transition of new-type PS.

5 August 2026 in Processes
Verified
Journal Article
Open access
PDF file
KLKequan Lin
Kequan Lin
XYXiaoli Yi
Xiaoli Yi
HDHaodong Du
Haodong Du
LZLei Zhuang
Lei Zhuang
CLCong Lin
Cong Lin
JZJie Zhao
Jie Zhao
To address the dynamic communication topology switching, asynchronous perception information, and uncertainty caused by vehicle mobility in the cooperative control of a vehicle-charger pile-grid under industrial Internet environments, this paper proposes a cooperative optimal control method based on decentralized holistic sensing graph-based estimation. First of all, this method constructs a time-varying weighted directed graph by using decentralized holistic sensing data obtained from the industrial Internet to characterize the dynamic evolution of communication topologies in real time. Secondly, a distributed graph estimator relying solely on local perception information is designed, enabling each agent to predict online its neighbor set and link reliability over a short future horizon based on its own position, the motion trends of nearby objects, and historical link states. On this basis, the graph-based estimation results are embedded as a feedforward compensation term into the consensus control law, forming a predictive graph consensus control algorithm that enables the system to proactively adjust control inputs before topology switching occurs, achieving a paradigm shift from “passive response” to “active pre-compensation.” Meanwhile, an Age of Information (AoI)-aware event-triggered mechanism is introduced, where broadcasting is triggered when the state error exceeds a threshold or the AoI approaches its upper bound, significantly reducing communication load while ensuring control accuracy. Finally, simulations are conducted on a modified IEEE 33-bus distribution system comprising 61 agents (20 electric vehicles, eight charging stations, and 33 grid nodes). The results show that, compared to the event-triggered consensus method without prediction, the proposed method reduces the steady-state error by 40.1%, shortens the convergence time by 40.5%, and decreases the number of broadcasts by 36.5%. In a large-scale system with 169 agents, the proposed method still maintains the highest accuracy, the fastest convergence speed, and the lowest communication overhead, while meeting real-time computational requirements. This method can fully exploit the spatiotemporal redundancy of decentralized holistic sensing, offering a new solution for efficient, robust, and low-cost cooperative control of “vehicle–charger–grid” under industrial Internet environments.

1 September 2026 in Electronics
Verified
Journal Article
Open access
PDF file
XSXinyong Su
Xinyong Su
JDJiaming Dai
Jiaming Dai
BWBaodong Wang
Baodong Wang
XWXiaowei Wang
Xiaowei Wang
SWShiao Wang
Shiao Wang
JZJie Zhao
Jie Zhao
In intelligent substation renovation and expansion projects, commissioning scheme preparation still depends heavily on engineering experience, which can lead to over-extended test boundaries and missed changes to virtual circuits. This paper proposes an automatic scheme generation method based on a Substation Configuration Description (SCD) difference graph and hierarchical cyclic redundancy check (CRC) boundary inference. A unified IEC 61850 intermediate model represents device, communication, and virtual link changes; IED CRC, sub-CRC, and minimum sub-CRC then refine the test boundary from devices to links and communication directions. Scenario templates, quantitative task costs, rule inference, and permission constraints are subsequently used to generate commissioning objects, tests, procedures, and safety measures. The method is evaluated on three synthetic renovation scenarios using a pre-frozen edit manifest oracle. In Case A, the representative scheme covers all four oracle devices, all three oracle link groups, and all 12 required step categories, with step completeness and step precision both equal to 1.0 and zero permission violations. Across the three cases, the method maintains complete device coverage while reducing redundant device-level tests.

14 August 2026 in Electronics
Verified
Journal Article
Open access
PDF file
RBRuyu Bi
Ruyu Bi
JYJingyi Yang
Jingyi Yang
JLJun Liu
Jun Liu
YXYu Xiong
Yu Xiong
YXYing Xu
Ying Xu
JZJie Zhao
Jie Zhao
In response to the increasingly complex secondary system of intelligent substations and the limitations of traditional evaluation methods such as data silos and single indicators, it is urgent to build a real-time high-precision status evaluation system. This article proposes a state evaluation method for the secondary system of intelligent substations based on digital twins and the combination weighting method. Firstly, a four-layer digital twin architecture consisting of physical entities, data interaction, virtual twins, and service applications is constructed to achieve precise mapping and real-time interaction of multi-source heterogeneous data in the secondary system. A comprehensive evaluation index system covering the operation status and information quality of key equipment in the secondary system of intelligent substations is built from multiple dimensions such as health status, information transmission, and environmental conditions. Next, a combined weighting evaluation model is established that integrates the subjective weights of the Analytic Hierarchy Process and the objective weights of the coefficient of variation method, and the principle of minimizing the sum of squares of subjective and objective deviations is introduced to achieve adaptive optimization of weight configuration. Finally, simulation analysis is conducted on the digital twin platform of the 220 kV intelligent substation, and the effectiveness and robustness of the proposed model are verified through multi-state evaluation, typical fault case verification, and ablation and sensitivity analysis. The results show that compared with the mainstream AHP entropy weight method, this method has a maximum deviation of 15.3% in evaluation indicators, a state evaluation score of 97.3164, a full process calculation time of about 2.6138 s, and communication delay that meets the requirements of the IEC 61850 standard. It can effectively improve the real-time accuracy of secondary system state perception and provide technical support for on-site operation and maintenance of intelligent substations.

18 May 2026 in Processes
Verified
Journal Article
Open access
PDF file
ZFZhichao Fu
Zhichao Fu
HYHuilei Yang
Huilei Yang
JHJingjing Huang
Jingjing Huang
ZXZihan Xie
Zihan Xie
SHShihua He
Shihua He
JZJie Zhao
Jie Zhao
To address the insufficient frequency-support capability, the difficulty of multi-terminal power coordination, and the constraints on DC-voltage fluctuations in flexible DC transmission systems under weak-grid interconnection, this paper conducts a simulation-based control strategy study. First, based on the coupling relationship between AC frequency and DC voltage, an inertia-enhanced grid-forming/VSG control method is proposed, enabling converter stations to use DC-link capacitor energy to provide transient frequency support during the initial stage of a disturbance. Second, for multi-terminal flexible DC systems, an adaptive U-P-f dual-droop distributed control strategy is designed to coordinate unbalanced power sharing among multiple converter stations and to limit the DC-voltage deviation generated during frequency support. In this paper, a hybrid half-bridge/full-bridge MMC is adopted as a fixed-converter simulation platform, rather than being treated as an object of systematic topology optimization. Finally, a four-terminal MMC-HVDC simulation model is established in MATLAB/Simulink, and the proposed control strategy is evaluated under weak-grid step-load disturbances, different short-circuit-ratio conditions, and continuous pseudo-random load disturbance scenarios. Simulation results show that, under the tested operating conditions, the proposed method can reduce the maximum frequency deviation, suppress DC-voltage fluctuations, and improve the power-sharing process among multi-terminal converter stations compared with conventional VSG control and fixed-droop control.