In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.
Among different engineering projects, there are ones intended to improve the energy-saving properties of buildings. Both new and much older buildings undergoing refurbishment can be involved. Broadly understood energy-saving projects increasingly often entail renewable energy installations. Every implementation of such an investment project needs to be preceded by an assessment of its economic efficiency. Although the literature provides examples of methods which can serve this purpose, a coherent methodological approach seems lacking. In this article, the author proposes methodology based on several simple and compound methods combined into a schematic assessment procedure. The methodology is presented as applied in a case of typical photovoltaic roof installation to generate electricity for a single-family house. The assessment procedure consists of a few steps leading from a preliminary to a more detailed appraisal. The first stage is an analysis of the projected cash flows, which in this case demonstrated that the payback would appear after 9 years. Next, a more precise evaluation showed that the payback period in this investment could be expected after 7.8 years. The following stages of calculations take into account the time value of money, having included a discount rate (discount rate 5%, the planned investment would be profitable). The next step, where the aim was to compute the internal rate of return, showed at what threshold value of the discount rate the investment would continue to yield profit (The IRR = 11.43%). It is extremely valuable information as it reveals the safety margin for the investment. The methodology discussed in this paper, which consists of a complex approach to an assessment of investments, especially in renewable energy sources, can yield much better outcomes than evaluations based on single methods, applied separately.
1 September 2017 in Journal of Ecological Engineering
Building investment projects, both during the construction work and afterwards, when a raised structure is used, have some impact on the natural environment. Depending on the character, size and location of a planned structure, such influences will vary. At the stage of planning a new...
Planning a construction project, the investor frequently faces the choice of the option of the planned investment. Assessment of options is difficult due to the complex nature of construction projects. Various methods of multi-criteria evaluation are successfully applied in the assessment and analysis of options. For those methods to work, a handful of information must be prepared beforehand. Among others, it is necessary to establish the assessment criteria and determine their weight for specific cases. This stage is implemented in cooperation with experts. The results of evaluations, obtained on the basis of the experts’ opinions, must be processed and prepared. The paper will discuss one possible option for assessing the experts’ opinion.
In 2014, the European Union Directive 2014/24/EU was issued, which has provisions including information about the use of electronic technology for modelling buildings, referred to as BIM. According to various sources in the literature, with the help of BIM technology building designs can be prepared more quickly, while avoiding errors; it is also possible to generate and control any amendments in a building blueprint, promptly estimate costs of the building works planned, and implement a variety of activities connected with the maintenance of a new building once it is erected. In some EU states, initiatives have been launched leading to the introduction of BIM technology in public procurement, and the technology itself is now gaining popularity. However, the adaptation of this new technology is not always met with enthusiasm, and its implementation is hindered by many obstacles. The aim of this article is to conduct a broader analysis of the possibilities of BIM development in the construction industry based on data obtained from companies operating in the construction industry. The research used analysis of source materials, surveys, and targeted interviews. The study has demonstrated several barriers, of which the most important ones proved to be of financial nature, formal and legal considerations, and mentality, namely the unwillingness to learn, adopt novel solutions, and switch to a new way of working. The research was supported by a SWOT analysis.
1 October 2019 in Journal of Ecological Engineering
The building objects show a wide variety. Among them, we can distinguish buildings and various building constructions. In addition to the fact that they are of various sizes, they perform different functions and their purpose and use generates various problems, they can be made using various...