Naser Motahari.F

Naser Motahari.F


Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2020 in Journal of Cleaner Production
Verified
Journal Article
Closed access
FDFatemeh Dadmand
Fatemeh Dadmand
ZNZahra Naji-Azimi
Zahra Naji-Azimi
NMNaser Motahari.F
Naser Motahari.F
KDKamran Davary
Kamran Davary

1 March 2020 in Journal of Management in Engineering
Verified
Journal Article
Closed access
ABAmir Bahadorestani
Amir Bahadorestani
JKJan Terje Karlsen
Jan Terje Karlsen
NMNaser Motahari.F
Naser Motahari.F
Stakeholder satisfaction in megaprojects has always been a critical concern in research and practice because of the dynamism, complexity, and uncertainty of the various relationships between the project and the stakeholder community. The most successful outcome for a megaproject would be achieved when it creates values fairly for stakeholder community to satisfy them. Therefore, because of the resource constraints, megaprojects should create value for stakeholders proportional to the value that they put into it. This article proposes a framework for priority setting in stakeholder engagement based on the balance of mutual value creation between the megaproject and stakeholder community. In this way, we developed an innovative and systematic approach by drawing on stakeholder theory, value creation theory, expectation disconfirmation theory, and fuzzy set theory while adopting from data envelopment analysis (DEA) concepts. This study contributes to the theory and practice of engineering management by examining stakeholder engagement to satisfy stakeholders fairly in megaprojects. Particularly, this study categorizes stakeholders based on the proportion of their salience to expectations to three main types: Modest, Fair, and Demanding. This typology will provide a road map for managers to prioritize the responses to stakeholders’ expectations. Finally, we applied the proposed approach for a real case of a megaconstruction project (MCP).

26 April 2020 in Journal of Transportation Safety & Security
Verified
Journal Article
Closed access
FRFariba Mahdi Rezaie
Fariba Mahdi Rezaie
ASAmir Mohammad Fakoor Saghih
Amir Mohammad Fakoor Saghih
NMNaser Motahari.F
Naser Motahari.F
Nowadays, various factors such as the welfare of citizens as well as traffic and air pollution reduction demonstrate the necessity of the creation and development of urban rail transport systems. Despite the utilization of new technologies in transportation systems and their automation, humans continue to play an important role in different parts of design, operation, monitoring, and repair. All activities performed in these sectors are affected by special working conditions or workplaces. Therefore, in order to decrease human error and improve safety, it is essential to identify and evaluate operating conditions affecting the condition performance commons (CPCs) and determine the general action failure probability using a suitable method. One way to do so is by using the cognitive reliability and error analysis method (CREAM). So far, in studies based on CREAM, the effects of these factors have been assumed to be equal when evaluating the effects of CPCs. However, in real terms, the effect of these factors can vary regarding the workplace and employees. In the present study, the fuzzy analytic network process (FANP) has been employed to determine the weight of efficient parameters in order to investigate and evaluate the working conditions affecting employee performance as a theoretical contribution. Urban rail transport systems such as the subway, tram, and urban railway have multiple entities, all contributing to a safe and efficient transportation system. These systems are composed of multiple human actors (driver, traffic control, and communication and licensing operator) and signaling systems working in a synchronized procedure. Because of the importance of human resources in these systems, the application of this method has been shown in the Mashhad urban railway in Iran as a practical contribution. According to the results of the basic CREAM, six factors of CPCs reduce performance reliability, most notably the adequacy of the organization; adequacy of the man-machine-interface (MMI) and operational support;” and “adequacy of training and preparation,” which have more effects on performance reliability compared to other factors. Based on the results obtained from the extended CREAM, the highest amount of detected error belonged to execution failure (%85), observation failure (%11), and planning failure (%4).

1 January 2023 in Journal of Industrial and Management Optimization
Verified
Journal Article
Closed access
PDF file
AMAzam Modares
Azam Modares
NMNaser Motahari.F
Naser Motahari.F
VEVahideh Bafandegan Emroozi
Vahideh Bafandegan Emroozi
One of the most common and successful approaches for the integrated supply chain management (SCM) is the vendor-managed inventory (VMI). In VMI, a vendor takes control of the inventory decisions for retailers. To establish a long-run relationship between the vendor and the retailer, it is necessary to consider two impactful factors: the vendors and retailers' reliability, and the optimal selection of retailers. For this purpose, the redundancy allocation problem (RAP), as an effective technique for increasing the reliability of vendors, is used in this paper. Also, the reliability of retailers as well as the reliability of the relationship between retailers and vendors are considered. In the retailer selection, process decisions on impactful criteria are simultaneously considered. For the retailers' selection, one analysis hierarchical process (AHP) is performed for each vendor, and the weights of retailers are obtained. Then, the obtained weights are plugged into the model as the inputs of the designed model. Since the developed model is a non-differentiable, non-convex, and mixed-integer function, genetic algorithm (GA) and particle swarm optimization (PSO) are leveraged to solve the formulated model. Finally, the efficiency of the presented method is verified through a case study with data collected from the electronic supply chain.

1 September 2019 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
ABAmir Bahadorestani
Amir Bahadorestani
JKJan Terje Karlsen
Jan Terje Karlsen
NMNaser Motahari.F
Naser Motahari.F
This article presents a comprehensive project stakeholder typology model (PSTM) based on stakeholder salience attributes (SSAs). Stakeholders are considered as one of the major pillars of construction projects and management of stakeholders is essential to effective project management in the construction industry. A literature review of stakeholder typology and management models was conducted to identify all the different SSAs that are being applied. This analysis revealed important variation in the attributes, models, and frameworks. A questionnaire survey and semistructured interviews were conducted to fulfil the research purpose. Based on a Venn-diagram analysis of data, we suggest a clear and nonoverlapping SSAs framework to be used in construction projects. We also propose a project stakeholder typology model based on SSAs. The results indicated that PSTM divides stakeholders into 15 different types based on four attributes, namely Potency, Legitimacy, Urgency, and Proximity. It is expected that the results of this study can be used by practicing professionals such as project managers when identifying, categorizing, and managing stakeholders in construction projects.

6 July 2023 in Process Integration and Optimization for Sustainability
Verified
Journal Article
Closed access
PDF file
AMAzam Modares
Azam Modares
NMNaser Motahari.F
Naser Motahari.F
FDFarzad Dehghanian
Farzad Dehghanian