Large-scale wind power farms in China are suffering from large amounts of curtailed wind power in the conventional dispatching mode. Energy-intensive loads have great potential in providing service regulation to help consume the curtailed wind power. However, constrained by technical limitations, the regulating power of energy-intensive loads cannot fully follow the fluctuating wind power. This would result in insufficient utilization of the regulation capability of energy-intensive loads, which limits the promotion in consumption of curtailed wind power brought by load-source coordination. With this concern, a brand new method for further consuming the curtailed wind power, which involves using coal-fueled units to provide ancillary regulation for the coordination of energy-intensive loads and wind power is presented, and a corresponding bi-level coordinative model is also established. The first level of optimization is intended to maximize the consumption of curtailed wind power with minimum ancillary regulation energy. The second level of optimization is to allocate the ancillary regulating power with minimum regulation cost. Wind power consumption was increased by 3,369.25 MWh and utilization rate of energy-intensive loads was promoted to 100% in the case analysis, which verifies the effectiveness of the proposed method.
With the increasing scale of new energy grid integration, the risk of low-frequency oscillation in the power system has increased, which seriously affect system safety and stability. It is urgent to identify the risk of low-frequency oscillations through steady-state operating features. This article first analyzes the features that affect low-frequency oscillations and constructs a low-frequency oscillation dataset using transient simulations. Secondly, feature selection was performed using the random forest algorithm, and a low-frequency oscillation risk identification model for GA-CNN was proposed. Thirdly, by combining Pearson correlation coefficient and RF algorithm to eliminate redundant features and screen important features, a low-frequency oscillation frequency recognition model based on GBRT was proposed, and hyperparameter optimization was performed using grid search. Finally, the effectiveness of the proposed method was verified by ablation experiments and comparative experiments using low-frequency oscillation datasets under different operating conditions.
For large-scale new energy integrated UHVDC sending-end grids, when a bipolar blocking fault occurs in the UHVDC system under high-generation conditions, it triggers severe transient overvoltage in the sending-end AC grid. This may lead to cascading tripping of units at renewable collection stations and power plants, resulting in transient voltage instability, posing significant challenges to the secure operation and renewable energy accommodation of the sending-end power system. This paper studies transient voltage stability control methods for new energy integrated UHVDC sending-end grids, aiming to eliminate the risk of power grid transient voltage instability triggered by transient overvoltage at renewable energy collection stations. Firstly, the evolution process of transient voltage instability in the new energy sending-end grid after a UHVDC bipolar blocking fault was analyzed. Based on this, the mechanisms of excess reactive power, transient voltage propagation, and voltage instability evolution were studied. Secondly, a coordinated transient voltage control framework combining steady-state prevention and transient self-response was established, with thresholds set for coordinated control of steady-state voltage prevention and transient self-response. A coordinated transient voltage stability control strategy for new energy DC sending-end AC grids was proposed, integrating steady-state prevention and transient self-response. Simulation results show that the proposed strategy effectively eliminates transient voltage instability risks in the sending-end grid and significantly enhances the level of renewable energy transmission and accommodation.
In the new-type power system, the traditional generation planning paradigm has shifted to a new paradigm of source–storage collaborative planning. However, source–storage coordinated planning is facing deep-seated structural challenges of unbalanced multi-objective coordination and insufficient adaptability to market mechanisms. This paper first designs a source–storage coordinated planning framework with a two-layer structure of planning decision-making and operation verification, which takes into account multiple low-carbon, economic, and security planning objectives, and considers the dual market driving of energy storage participating in active-power and reactive-power regulations. Secondly, a two-layer optimal planning model is constructed: the upper-layer aims at minimizing the investment cost of new source–storage and minimizing annual carbon emissions, while the lower-layer aims at minimizing the comprehensive operation cost and maximizing the revenue of the energy storage market. The feature of this model is that it can simultaneously consider the coupling effect of the active-power market and the reactive-power market. Thirdly, a two-layer closed-loop iterative solution method based on Non-dominated Sorting Genetic Algorithm II is adopted to generate the source–storage coordinated planning scheme. Finally, simulation calculations are performed on the modified New England 39-bus system. The results show that, when considering the market driving of energy storage in both active-power and reactive-power regulations, the installed capacity of new energy reaches 465 MW, which is 55% higher than that in the no-market scenario, while the renewable energy curtailment rate is only 1.7%. The correctness and effectiveness of the proposed two-layer source–storage coordinated planning method in this paper are verified.
Under the research background that large scale new energy base located in the Hexi corridor area, in view of typical high-energy loads in Gansu province, such as silicon carbide, aluminum electrolytic, focus on key electrical equipment in production processes, adjustable features of high-energy loads as well as affecting factors are analyzed. Meanwhile, companies' constraint conditions to participate in demand response were also under consideration. Every effort is want to demonstrate an argument whether high-energy loads participating in respond to meet power grid demand with large scale new energy base can be carried out or not. By means of analyzing structure of power grid and output characteristics of new energy base located in Hexi area, as well adjustable capacity of conventional power generators, regulation strategy of high-energy loads on multi time scale is studied, and give some advice on engineering practice in the conclusion.