Muhammad Nashir Ardiansyah

Dr. Muhammad Nashir Ardiansyah

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 June 2021 in Jurnal Rekayasa Sistem & Industri (JRSI)
Verified
Journal Article
Open access
MAMuhammad Nashir Ardiansyah
Muhammad Nashir Ardiansyah
PMPrafajar Sukssesanno Muttaqin
Prafajar Sukssesanno Muttaqin
Murman Dwi PrasetioMurman Dwi Prasetio
Murman Dwi Prasetio
NNNia Novitasari
Nia Novitasari
Aktivitas pemeriksaan persediaan atau Stock-taking merupakan aktivitas pemeriksaan barang manual oleh petugas gudang yang dilakukan secara rutin pada aktivitas pergudangan. Aktivitas ini berfungsi untuk menentukan akurasi persediaan dan mengetahui kondisi persediaan sehingga dapat mengurangi resiko kehilangan, kerusakan, dan keausan persediaan. Aktivitas pemeriksaan persediaan termasuk aktivitas yang memerlukan biaya dan waktu yang besar. Selain itu, aktivitas ini juga tak luput dari kesalahan manusia karena aktivitas pengecekan merupakan aktivitas yang membutuhkan ketelitian tinggi. Penelitian ini bertujuan untuk melakukan identifikasi objek atau produk yang bertujuan untuk menggantikan pemeriksaan manual manusia sehingga proses pemeriksaan jenis dan jumlah barang dapat dilakukan secara otomatis dan presisi. Pengolahan citra digital berbentuk Object Recognition digunakan pada penelitian ini untuk menentukan jenis objek dan jumlah objek. Hasil penelitian menunjukan tingkat deteksi produk tunggal mencapai 90% yang dipengaruhi oleh sudut pengambilan gambar dan tingkat deteksi jumlah objek tunggal mencapai > 81% dengan tingkat pencahayaan yang normal dan sudut pengambilan gambar yang ideal. Diharapkan dengan adanya sistem ini, biaya untuk aktivitas pemeriksaan persediaan dan aktivitas pergudangan secara umum dapat ditekan sehingga efisiensi dan efektivitas dapat dicapai.

8 October 2024 in Technologia: Jurnal Ilmiah
Verified
Journal Article
Open access
PDF file
MKMuhammad Fikri Khaidar
Muhammad Fikri Khaidar
MAMuhammad Nashir Ardiansyah
Muhammad Nashir Ardiansyah
IPIntan Permatasari
Intan Permatasari
PT Telkom Indonesia adalah perusahaan di bidang Teknologi Informasi dan Komunikasi (TIK) serta jaringan telekomunikasi yang menghadapi kesulitan dalam monitoring dan controlling proyek secara simultan. Masalah utama yang ditemukan termasuk manajemen perubahan yang lambat karena sistem aktual pada proses monitoring dan controlling yang masih dilakukan secara semi-manual, informasi yang tidak real-time, serta ketiadaan alat pengambilan keputusan berbasis data. Penelitian ini bertujuan untuk mengembangkan Project Management Information System (PMIS) guna mengatasi masalah tersebut. PMIS dirancang untuk mengintegrasikan karyawan dan atasan dalam memantau proyek secara real-time. Fitur utama yang ditawarkan mencakup visualisasi perkembangan proyek berbasis data, pelaporan rutin, dan ringkasan proyek yang mudah dipahami. Sistem ini dikembangkan menggunakan metode waterfall, dilengkapi dengan fitur pengolahan data perkembangan proyek menggunakan metode Earned Value Management (EVM) untuk mengukur kinerja proyek. Pengembangan dilakukan melalui analisis kebutuhan pengguna dan kolaborasi dengan pemangku kepentingan untuk memastikan kesesuaian sistem dengan kebutuhan perusahaan. Hasilnya menunjukkan bahwa sistem mampu memberikan informasi secara real-time, memfasilitasi pelaporan terintegrasi, serta memvisualisasikan perkembangan proyek secara komprehensif. PMIS diharapkan dapat meningkatkan optimasi proses monitoring dan controlling proyek di PT Telkom.

26 August 2024 in Journal of Industrial Engineering and Management
Verified
Journal Article
Open access
PDF file
GMGenta Yusuf Madhani
Genta Yusuf Madhani
ISIphov Kumala Sriwana
Iphov Kumala Sriwana
MAMuhammad Nashir Ardiansyah
Muhammad Nashir Ardiansyah
Purpose: The research purpose is to enhance picking performance by developing a hybrid algorithm that classifies SKU, determines slot, and routes the process for Delivery Order (DO).Design/methodology/approach: FSN classification is used for categorizing the products into three groups: fast-moving, slow-moving, and not-moving based on the consumption rate and average stay of each SKU. The result of classification is continued with ZABLS Slotting for product placement on warehouse shelves based on the quickest to the longest picking time on each slot. Slotting results are used for VRP addresses with Ant Colony Optimization and Tabu Search hybridization algorithms.Due to the high process and cost to move the goods storage location because of the use of FSN and ZABLS method, hybridization algorithms are compared to pre-slotting and post-slotting conditions. Method verification uses 30 random sampling DO, and based on existing storage locations, it took 757.14 seconds average picking time.Findings: On pre-slotting condition, it reduced 17.74% to 626.34 seconds, and on post-slotting condition it reduced 25.75% to 557.64 seconds.The reduced picking time gives PT. XYZ better performance on fulfilling delivery orders in a day; theoretically, based on standard time, PT. XYZ can fulfill 40 orders in a day, and based on current performance, PT. XYZ can only fulfill 31 DO in a day. The uses of ACO-TS hybridization algorithms on pre-slotting condition PT. XYZ can fulfill 45 DO in a day and on post-slotting condition PT. XYZ can fulfill 51 DO in a day, increasing 27.5% from current performance.Originality/value: The novelty of this research is the use of hybridization algorithms of Ant Colony Optimization and Tabu Search (ACO-TS) to design sequential model of FSN-ZABLS to VRP to minimize picking time on each Delivery Order (DO).

1 January 2023 in AIP Conference Proceedings
Verified
Conference Paper
Open access
PDF file
NFNisri Husna Faadhilah
Nisri Husna Faadhilah
MAMuhammad Nashir Ardiansyah
Muhammad Nashir Ardiansyah
HPHardian Kokoh Pambudi
Hardian Kokoh Pambudi
XYZ is a distribution company engaged in food distribution, especially in the rice sector, located in Cimahi City, West Java. The activity carried out by XYZ co

31 October 2023 in Journal of Production, Enterprise, and Industrial Applications
Verified
Journal Article
Closed access
NRNaufal Agin Ramadhan
Naufal Agin Ramadhan
MAMuhammad Nashir Ardiansyah
Muhammad Nashir Ardiansyah
HPHardian Kokoh Pambudi
Hardian Kokoh Pambudi
CV. XYZ adalah produsen produk olahan kedelai tahu yang berlokasi di Kota Depok, Jawa Barat dan memiliki konsumen yang tersebar di daerah kota Depok dan Jakarta Selatan. Terdapat tiga jenis rmada transportasi yang dimiliki oleh CV. XYZ, masing-masing memiliki karakteristik yang berbedabeda. Setiap pelanggan memiliki rentang waktu penerimaan barang masing-masing. Bila kendaraan datang di luar rentang waktu yang telah ditentukan, penerimaan barang tidak dapat dilakukan dan produk dikembalikan lagi ke pabrik. CV. XYZ mengalami keterlambatan dalam proses pengirimannya yang diakibatkan oleh penentuan rute yang tidak dilakukan secara teratur yang menyebabkan variasi waktu tempuh dan jam kedatangan yang acak. Permasalahan CV. XYZ dapat diselesaikan menggunakan pendekatan Vehicle Routing Problem (VRP) dengan karakteristik Heterogeneous Fleet dan Time Windows dan Mixed Integer Linear Programming. Penyelesaian model VRP dibantu dengan bahasa pemrograman python dan perangkat lunak solver Gurobi, dengan algoritma Branch & Bound dan Cutting Plane. Hasil penyelesaian model VRP memiliki tingkat keterlambatan sebesar 0% dan berhasil menekan biaya transportasi sebesar 11%.

31 October 2023 in Journal of Production, Enterprise, and Industrial Applications
Verified
Journal Article
Closed access
JHJeehan Hafizha Herfi
Jeehan Hafizha Herfi
MAMuhammad Nashir Ardiansyah
Muhammad Nashir Ardiansyah
FYFemi Yulianti
Femi Yulianti
Dinas Kesehatan Provinsi merupakan unsur pelaksana otonomi daerah di bidang kesehatan yang berkedudukan di bawah dan bertanggung jawab kepada Gubernur. Dinas kesehatan bertugas melakukan distribusi obat kepada dinas kesehatan yang berada di kota/kabupaten. Pada saat ini manajemen persediaan obat di Dinas Kesehatan Provinsi XYZ masih belum memiliki kebijakan persediaan yang baik seperti tidak adanya waktu pemesanan obat yang tepat dan belum adanya standar perhitungan jumlah obat yang harus dipesan. Hal ini menyebabkan terjadinya penumpukan obat yang berada di Gudang Farmasi. Prioritas obat yang memiliki persentase persediaan tertinggi adalah Obat Gizi dan Anak. Penumpukan ini terjadi karena terdapat gap anatara jumlah persediaan dan permintaa selama tahun 2021. Gap tersebut bisa menyebabkan terjadinya overstock. Oleh karena itu, solusi yang digunakan untuk menyelesaikan permasalahan tersebut adalah perancangan kebijakan persediaan obat gizi dan anak untuk meminimasi overstock. menggunakan periodic review (R,s,S) dan periodic review (R,S). Pada kebijakan ini terdapat paramater yang ditentukan seperti review interval (R), reorder point (s) dan maksimum persediaan (S). Dengan menggunakan metode ini, didapatkan hasil jumlah overstock dapat diminimasi dengan penurunan persediaan usulan sebesar 60% dibandingkan dengan kondisi persediaan aktual.