Sustainability is nowadays accepted by all stakeholders as a guiding principle for both public policy making and corporate strategies. However, the biggest challenge for most organizations remains in the real and substantial implementation of the sustainability concept. The core of the implementation challenge is the question, how sustainability performance can be measured, especially for products and processes. This paper explores the current status of Life Cycle Sustainability Assessment (LCSA) for products and processes. For the environmental dimension well established tools like Life Cycle Assessment are available. For the economic and social dimension, there is still need for consistent and robust indicators and methods. In addition to measuring the individual sustainability dimensions, another challenge is a comprehensive, yet understandable presentation of the results. The “Life Cycle Sustainability Dashboard” and the “Life Cycle Sustainability Triangle” are presented as examples for communication tools for both experts and non expert stakeholders.
Sustainability is on the international agenda, and is a driver for industry in international competition. Sustainability encompasses the three pillars: environment, society and economy. To prevent shifting of burden, the whole life cycle needs to be taken into account. For the environmental dimension of sustainability, life cycle assessment (LCA) has been practiced for a while and is a standardized method. A life cycle approach for the social and economic pillars of sustainability needs to be further developed. This paper investigates the application of life cycle costing (LCC) as part of a wider sustainability assessment where also social life cycle assessment (SLCA) and LCA are combined. LCA-type LCC is applied on a case study of remanufactured alternators. Remanufacturing of automobile parts is a fast growing important business with large potential for cost and resource savings. Three design alternatives for the alternator and three locations for the remanufacturing plant are evaluated. The remanufacturer perspective and the user perspective are investigated. The results for the LCA-type LCC show that the largest cost for the remanufacturer is the new parts replacing old warn parts. However, the user cost, and therein especially, cost for fuel used for the alternator’s power production dominates and should be the focus for further improvement. In conducting the case study, it was revealed that the connection between the LCA-type LCC results and the economic dimension of sustainability needs to be further investigated and defined. For this purpose, areas of protection for life cycle sustainability assessment and LCA-type LCC in particular need further development.
Recently increasing attention has been paid to complementing environmental Life Cycle Assessment (LCA) with social aspects. The paper discusses the selection of social impacts and indicators from existing frameworks like Social Life Cycle Assessment (SLCA) and Social Impact Assessment (SIA). Two ongoing case studies, addressing sustainability assessment within decision support, were considered: (1) Integrated Water Resources Management (IWRM) in Indonesia; and (2) Integrated Packaging Waste Management in Spain and Portugal (FENIX). The focus was put on social impacts occurring due to decisions within these systems, such as choice of technologies, practices or suppliers. Thus, decision makers—here understood as intended users of the studies’ results—are not consumers that buy (or do not buy) a product, such as in recent SLCA case-studies, but mainly institutions that decide about the design of the water or packaging waste management system. Therefore, in the FENIX project, a list of social impacts identified from literature was sent to the intended users to be ranked according to their priorities. Finally, the paper discusses to what extent the entire life cycle is reflected in SLCA impact categories and indicators, and explains how both life-cycle and on-site-related social impacts were chosen to be assessed. However, not all indicators in the two projects will assess all stages of the life cycle, because of their varying relevance in the different stages, data availability and practical interest of decision makers.