Out‐of‐hospital cardiac arrest (OHCA) is a critical public health issue, with survival rates varying widely due to multiple well‐established factors, including emergency medical service (EMS) system structure, bystander response, initial cardiac rhythm, and patient‐level characteristics. This study evaluates the Utstein‐Based Return of Spontaneous Circulation (UB‐ROSC) score’s performance in predicting sustained Return of Spontaneous Circulation (ROSC > 2 h) in a midsized Asian city where EMS delivery is standardized and geographic variation in access is minimal. A total of 209 OHCA cases from Chiayi City in 2024 were analyzed, using Utstein‐aligned data to compute UB‐ROSC scores. Predictive performance was assessed via receiver operating characteristic (ROC) curves, calibration intercept and slope, the Hosmer–Lemeshow goodness‐of‐fit test, and bootstrap internal validation, focusing on sustained return of spontaneous circulation (ROSC) (> 2 h). After excluding pediatric and traumatic cases, 209 cases were analyzed. The cohort was 60.3% male, with 47.8% witnessed arrests and 67.0% receiving bystander CPR. The UB‐ROSC score demonstrated fair discrimination, with an area under the ROC curve (AUC) of 0.78 (95% confidence interval [CI]: 0.70–0.85), stable on bootstrap and cross‐validation. The calibration slope was 0.90 (95% CI: 0.62–1.18) but the calibration intercept was +0.71 (95% CI: 0.36–1.05), and the Hosmer–Lemeshow test was significant ( χ2 = 28.6, p < 0.001), indicating systematic underprediction of observed survival. Risk stratification yielded a low‐risk group ( n = 109) with a 15.6% ROSC rate, a medium‐risk group ( n = 94) with a 48.9% rate, and a high‐risk group ( n = 6) with an 83.3% rate. The Chiayi cohort showed a slightly higher observed ROSC rate in the low‐risk group, whereas the medium‐ and high‐risk groups fell within the predicted ranges although estimates in the high‐risk group were imprecise because of the small sample size. Local recalibration may be needed before applying absolute probability estimates in clinical settings.
This study examined how mechanical, electrical, and plumbing (MEP) practitioners understand and apply quality and safety management in construction projects in Taiwan. It focused on the gap between what practitioners know about best practices and what they can carry out on site, defined here as the “Cognitive–Execution Gap.” A mixed-methods design was used, combining a questionnaire survey of 130 MEP practitioners with semi-structured interviews with six senior experts. Practitioners with MEP-related academic backgrounds scored significantly higher in professional knowledge and practice than those from unrelated fields, with mean differences of 0.87 and 0.78 points on a 5-point scale, respectively (both p < 0.001). In contrast, awareness of management optimization strategies was high and similar across all demographic groups. Interview findings suggest that schedule pressure, the lower organizational status of MEP compared with civil engineering, and persistent talent shortages prevent practitioners from applying the practices that they recognize as necessary. The results provide evidence consistent with a Cognitive–Execution Gap and suggest that bridging it requires organization-level reforms, including prospectively evaluated BIM-based coordination, clearer standard operating procedures and performance indicators, and structured mentorship programs to strengthen professional capacity in MEP engineering.
This study examined how Mechanical, Electrical, and Plumbing (MEP) practitioners understand and apply quality and safety management in construction projects in Taiwan. It focused on the gap between what practitioners know about best practices and what they can carry out on site, defined here as the “Cognitive-Execution Gap.” A mixed-methods design combined a questionnaire survey of 130 MEP practitioners with semi-structured interviews with six senior experts. Practitioners with MEP-related academic backgrounds scored significantly higher in professional knowledge and practice than those from un-related fields, with mean differences of roughly 30% in key indicators. In contrast, awareness of management optimization strategies was high and similar across all de-mographic groups. Interview findings suggested that schedule pressure, the lower or-ganizational status of MEP compared with civil engineering, and persistent talent shortages prevent practitioners from applying the practices they recognize as necessary. The results support the existence of a Cognitive–Execution Gap and suggest that bridging it requires organization‑level reforms, including contractually enforced BIM‑based co-ordination, clearer standard operating procedures and performance indicators, and structured mentorship programs to strengthen professional capacity in MEP engineering.