Wang Shengyuan

Mr. Wang Shengyuan


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 April 2026 in Sustainability
Verified
Journal Article
Open access
PDF file
SWShuzheng Wang
Shuzheng Wang
WSWang Shengyuan
Wang Shengyuan
ZHI WUZHI WU
ZHI WU
HWHaode Wu
Haode Wu
GZGuyue Zhu
Guyue Zhu
The transition toward sustainable and low-carbon power systems increasingly depends on the efficient accommodation of high shares of renewable energy while maintaining secure and reliable grid operation. In interconnected power systems, this challenge is intensified by strong cross-regional coupling, tie-line flow violation risks, and the high computational burden of fully coupled probabilistic assessments. To support the sustainable operation of renewable-rich interconnected systems, this paper proposes a probabilistic production simulation method that incorporates risk-aware tie-line exchange optimization. Sequential random sample paths are constructed by considering load fluctuations, renewable energy output uncertainty, and random outages of conventional units. Using cross-regional exchange power as coupling variables, a conditional value-at-risk (CVaR)-based pre-scheduling model is established to control tie-line and interface flow tail risks. Given the scheduled exchange power, cross-regional exchanges are transformed into regional boundary power injections, enabling decoupled sequential probabilistic production simulation for each region. The exchange schedule is then iteratively updated through marginal-value feedback. A four-region interconnected system is used for case-study validation. Results show that the proposed method improves renewable energy accommodation, reduces renewable curtailment, suppresses tie-line flow violation risk, and maintains high reliability assessment accuracy. Compared with the region-decoupled benchmark with fixed exchange power, the proposed method increases the renewable energy accommodation rate from 93.82% to 95.41% and reduces renewable curtailment from 312,162 MWh to 231,284 MWh, while also lowering expected energy not served and loss of load expectation. In addition, under the reported case-study setting, the proposed RC-IEF-PPS reduces the computation time from 5216.24 s for Full-PPS to 4074.63 s, i.e., by 21.9%, while maintaining comparable reliability assessment accuracy. These results indicate that the proposed framework can support the sustainable integration of high-penetration renewable energy by improving clean-energy utilization, operational reliability, and computational tractability in interconnected power systems.

28 May 2026 in Sustainability
Verified
Journal Article
Open access
PDF file
SWShuzheng Wang
Shuzheng Wang
WSWang Shengyuan
Wang Shengyuan
ZHI WUZHI WU
ZHI WU
GZGuyue Zhu
Guyue Zhu
HWHaode Wu
Haode Wu
Accurate transmission-line parameters are essential for reliable, efficient, and sustainable smart grid operation, especially under increasing renewable-energy integration and data-driven grid management. However, line aging, temperature variations, and measurement outliers may cause significant deviations between actual and nominal grid models, thereby degrading the state estimation, power-flow analysis, and operational security assessment. To address these challenges, this paper proposes a robust transmission-line parameter estimation method based on a variable-projection framework. The proposed framework decomposes the original high-dimensional, strongly coupled, and non-convex joint estimation problem into two subproblems associated with line-parameter identification and operating-state calibration. An iteratively reweighted least-squares algorithm based on the Huber M-estimator is introduced to dynamically adjust measurement weights and suppress the influence of outliers. The preconditioned conjugate-gradient method is further employed to avoid the explicit inversion of large-scale normal matrices. Simulations on the IEEE 118-bus system demonstrate that the proposed method achieves a higher parameter-estimation accuracy and stronger robustness than conventional weighted least-squares and joint state-parameter estimation methods. In the base case, the proposed method reduces the RMSRE of line reactance to 0.0794%, compared with 0.1558% for WLS and 0.1126% for JSE. Under the representative 5% gross-error case, the proposed method maintains lower RMSREs of 0.9772%, 0.0875%, and 5.8536% for Rl, Xl, and Bsh, respectively. Further sensitivity tests under contamination ratios from 1% to 20%, outlier magnitude factors from 1.5 to 5.0, and different outlier-location patterns confirm that the proposed method maintains a more stable estimation accuracy than WLS, conventional JSE, and Huber-JSE without VPM under diverse bad-data conditions. In downstream operational evaluations, it reduces the branch active-power flow RMSE from 1.6842 MW to 0.7215 MW, voltage-magnitude RMSE from 0.00482 p.u. to 0.00216 p.u., and active-power-loss error from 2.4368% to 0.9327% compared with WLS. These quantitative results indicate that the proposed approach can improve the grid model accuracy under imperfect measurements, thereby supporting reliable and sustainable smart-grid operation.