Mo Maleki Sadabad

Dr. Mo Maleki Sadabad


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 August 2025 in Environment, Development and Sustainability
Verified
Journal Article
Open access
PDF file
STSHAHRAM Tahmasseby
SHAHRAM Tahmasseby
SSSalwa Salam
Salwa Salam
MSMo Maleki Sadabad
Mo Maleki Sadabad
Sustainable construction is a key priority for Qatar, aligning with Qatar National Vision 2030 and the country’s commitment to environmental sustainability. Life Cycle Assessment (LCA) is a crucial tool for evaluating the environmental impact of construction projects, yet its adoption in Qatar remains limited due to financial constraints, regulatory inconsistencies, and lack of industry expertise. This study investigates the current state of sustainable construction in Qatar, focusing on the challenges and opportunities for LCA implementation. Through a survey of industry professionals, key barriers were identified, including high initial costs, insufficient technical knowledge, and the absence of standardized sustainability regulations. The findings reveal that while many practitioners recognize the long-term benefits of LCA, its integration remains hindered by weak enforcement mechanisms and inconsistent policy frameworks. Additionally, the study highlights the potential of Building Information Modeling (BIM) integration with LCA to enhance sustainability assessments, yet adoption remains low due to knowledge gaps and limited digital transformation in the sector. To address these challenges, the study recommends strengthening regulatory enforcement, introducing financial incentives, and implementing structured training programs to enhance industry capacity and encourage LCA adoption. Increased collaboration between policymakers, developers, and environmental agencies is also necessary to create a more robust sustainability framework. By tackling these barriers and leveraging digital tools, Qatar can enhance its transition towards a resource-efficient, low-carbon construction sector, positioning itself as a regional leader in sustainable building practices.

1 February 2023
Verified
Conference Paper
Open access
PDF file
MSMo Maleki Sadabad
Mo Maleki Sadabad
In contrast to traditional piece meal onsite construction, offsite construction comprises the planning, designing, production, transporting, and assembly of building elements for speedy site assembly to a higher degree of completion. Offsite building utilises a wide range of materials, scales, and systems, as well as modern manufacturing and fabrication techniques and computer software. Offsite construction is utilised to create componentised, panelised, and modular elements that support structural, enclosure, service, and interior partition systems. Integrating these systems with the supply chain through research, design, testing, and prototyping is an off-site optimisation technique. Due of economic, health and safety, and environmental factors, major UK contractors have adopted offsite construction over the past decade. Large projects are requiring major contractors like Mace, Laing O' Rourke, and Balfour Beatty to invest in off-site manufacturing. Offsite construction is defined in detail in this paper, along with how it can help construction projects to succeed economically and environmentally. The impact of offsite construction was examined in this research using a narrative review of the existing literature, and the findings demonstrate that there are numerous advantages both economically and environmentally. Offsite construction is more environmentally friendly because it requires less energy and large machinery uses on site. Since it is simpler to anticipate the amount of material required and buy in bulk, the organisation may reduce waste and the number of vehicles required to transport the finished product to the site. Cost savings always result from transferring site processes to a production workshop setting. The cost of labour in mechanical and electrical installation is one of the highest costs in construction industry, therefore, as prefabricated solutions have been fully or partially completed before they arrive on-site, labour can be reduced with offsite construction.

1 November 2025
Verified
Book Chapter
Closed access
PDF file
GWGreg Watts
Greg Watts
MSMo Maleki Sadabad
Mo Maleki Sadabad
NVNarendra Vasudeva
Narendra Vasudeva
WKWaleed Khan
Waleed Khan