Haozhen Yue

Dr. Haozhen Yue


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 October 2022 in Journal of Rock Mechanics and Geotechnical Engineering
Verified
Journal Article
Open access
CYChong Yu
Chong Yu
HLHaibo Li
Haibo Li
HYHaozhen Yue
Haozhen Yue
XWXiaohu Wang
Xiaohu Wang
XXXiang Xia
Xiang Xia

19 January 2022 in Shock and Vibration
Verified
Journal Article
Open access
PDF file
HYHaozhen Yue
Haozhen Yue
CYChong Yu
Chong Yu
HLH.B. Li
H.B. Li
CZChuanbo Zhou
Chuanbo Zhou
SCS.H. Chen
S.H. Chen
ZSZhushan Shao
Zhushan Shao
Rock damage and vibration attenuation are the basis of blasting design, which will affect rock breaking results and the safety of structures (buildings). In this paper, the effect of blast-hole arrangement, delay time, and decoupling charge on the rock damage and the vibration attenuation in multihole blasting were numerically investigated. Through dynamic analysis software ANSYS/LS-DYNA, the JOHNSON_HOLMQUIST_CONCRETE (JHC) rock model and fluid-solid coupling method were used to establish single-hole and multihole rock blasting models. Based on the analysis of single-hole rock damage and vibration, firstly, the effect of the above three factors on the rock damage characteristics of multihole blasting was analyzed. Then, the extracted peak particle velocity (PPV) data of multihole blasting were fitted to the United States Bureau of Mines (USBM) equation to obtain the blasting vibration attenuation parameters (the site constant K and α). It is found that the blast-hole arrangement, delay time, and decoupling charge have a much smaller effect on α than K. At the same time, a delay-time-dependent model of PPV correction coefficient was proposed, and its rationality was verified by field data. The results obtained in this paper have reference significance for optimizing the blasting design and improving the blasting effect.

17 April 2026 in Buildings
Verified
Journal Article
Open access
PDF file
HYHaozhen Yue
Haozhen Yue
YZYapeng Zhang
Yapeng Zhang
Chaoyi SunChaoyi Sun
Chaoyi Sun
YZYun Zheng
Yun Zheng
DXDemin Xue
Demin Xue
With the acceleration of urbanization, deep and large foundation pit projects have become increasingly common, posing challenges for retaining structural performance. This study investigates the mechanism of the recently proposed vertical–inclined pile wall (VIPW) through physical model tests. Six sets of large-scale model tests of foundation pit excavation under 1 g gravity conditions were carried out. Among these tests, one employed the soldier pile wall (SPW) as the support system, while the remaining five adopted the VIPW. By monitoring and analyzing the distribution and variation in the vertical pile deformation, surface settlement, pile bending moment, and inclined pile top axial force during the excavation process, the action mechanism of the VIPW was revealed, and it was verified that VIPWs exhibit better support performance than SPWs. Furthermore, four key parameters, including the embedded depth, the inclination angle, the support position of the inclined piles, and the embedded depth of the vertical piles, were varied to study their influence on the deformation and force characteristics of the VIPW, providing a theoretical basis for structural optimization design. Moreover, by comparing the instability and failure characteristics of the foundation pit, it was proved that the VIPW can effectively ensure the stability of the foundation pit.

20 March 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
HYHaozhen Yue
Haozhen Yue
YZYapeng Zhang
Yapeng Zhang
Chaoyi SunChaoyi Sun
Chaoyi Sun
YZYun Zheng
Yun Zheng
DXDemin Xue
Demin Xue
With the acceleration of urbanization, numerous deep and large foundation pit projects have been emerging. This paper proposes a new type of support structure for deep foundation pits, namely vertical-inclined-piles wall (VIPW). Six sets of large-scale model tests of foundation pit excavation under 1-g condition were carried out, among which one set was supported by soldier pile wall (SPW) and the other five by VIPW. By monitoring and analyzing the distribution and variation characteristics of vertical pile deformation, surface settlement, pile bending moment, and inclined pile top axial force during the excavation process, the action mechanism of VIPW was revealed, and it was verified that VIPW exhibits better support performance than SPW. Furthermore, four key parameters, including the embedded depth of inclined piles, the inclination angle of inclined piles, the support position of inclined piles, and the embedded depth of vertical piles, were changed respectively to study their influences on the deformation and force characteristics of VIPW, providing a theoretical basis for structural optimization design. Moreover, by comparing the instability and failure characteristics of the foundation pit, it is proved that VIPW can effectively ensure the stability of the foundation pit.