Gary Hahn

Mr. Gary Hahn

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 August 2023 in Energy Reports
Verified
Journal Article
Open access
EPEmilio Piesciorovsky
Emilio Piesciorovsky
GHGary Hahn
Gary Hahn
RHRaymond Charles Borges Hink
Raymond Charles Borges Hink
AWAaron Werth
Aaron Werth
ALAnnabelle Lee
Annabelle Lee

30 May 2023 in Energies
Verified
Journal Article
Open access
PDF file
EPEmilio Piesciorovsky
Emilio Piesciorovsky
RHRaymond Charles Borges Hink
Raymond Charles Borges Hink
AWAaron Werth
Aaron Werth
GHGary Hahn
Gary Hahn
ALAnnabelle Lee
Annabelle Lee
YPYarom Polsky
Yarom Polsky
Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small-measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible troubleshooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.

15 October 2024 in Electronics
Verified
Journal Article
Open access
PDF file
EPEmilio Piesciorovsky
Emilio Piesciorovsky
GHGary Hahn
Gary Hahn
RHRaymond Charles Borges Hink
Raymond Charles Borges Hink
AWAaron Werth
Aaron Werth
In modern electrical grids, the numbers of customer-owned distributed energy resources (DERs) have increased, and consequently, so have the numbers of points of common coupling (PCC) between the electrical grid and customer-owned DERs. The disruptive operation of and out-of-tolerance outputs from DERs, especially owned DERs, present a risk to power system operations. A common protective measure is to use relays located at the PCC to isolate poorly behaving or out-of-tolerance DERs from the grid. Ensuring the integrity of the data from these relays at the PCC is vital, and blockchain technology could enhance the security of modern electrical grids by providing an accurate means to translate operational constraints into actions/commands for relays. This study demonstrates an advanced power system application solution using distributed ledger technology (DLT) with smart contracts to manage the relay operation at the PCC. The smart contract defines the allowable total power factor (TPF) of the DER output, and the terms of the smart contract are implemented using DLT with a Cyber Grid Guard (CGG) system for a customer-owned DER (wind farm). This article presents flowcharts for the TPF smart contract implemented by the CGG using DLT. The test scenarios were implemented using a real-time simulator containing a CGG system and relay in-the-loop. The data collected from the CGG system were used to execute the TPF smart contract. The desired TPF limits on the grid-side were between +0.9 and +1.0, and the operation of the breakers in the electrical grid and DER sides was controlled by the relay consistent with the provisions of the smart contract. The events from the real-time simulator, CGG, and relay showed a successful implementation of the TPF smart contract with CGG using DLT, proving the efficacy of this approach in general for implementing electrical grid applications for utilities with connections to customer-owned DERs.

1 August 2024 in International Journal of Electrical Power & Energy Systems
Verified
Journal Article
Open access
GHGary Hahn
Gary Hahn
EPEmilio C. Piesciorovsky
Emilio C. Piesciorovsky
RHRaymond Borges Hink
Raymond Borges Hink
AWAaron Werth
Aaron Werth

1 January 2023 in SSRN Electronic Journal
Verified
Preprint
Open access
PDF file
EPEmilio Carlos Piesciorovsky
Emilio Carlos Piesciorovsky
RHRaymond Charles Borges Hink
Raymond Charles Borges Hink
AWAaron Werth
Aaron Werth
GHGary Hahn
Gary Hahn
ALAnnabelle Lee
Annabelle Lee
YPYarom Polsky
Yarom Polsky
Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, protection, and communication applications. Like real electrical utility substations, complex electrical substation grid test beds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, protection, control (synchro check), and communication applications that are limited by small measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the test bed were described to define a method with flowcharts to assess possible troubleshooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time stamp sources.

1 June 2025
Verified
Report
Open access
PDF file
USUsdoe
Usdoe
EPEmilio Piesciorovsky
Emilio Piesciorovsky
GHGary Hahn
Gary Hahn
RHRaymond Charles Borges Hink
Raymond Charles Borges Hink
AWAaron Werth
Aaron Werth
In this study is presented two power system applications with distributed ledger technology (DLT) and smart contracts (SC) that were assessed in a Cyber-Grid-Guard System (CGGS) advanced testbed, with protective relays, power meters, communication devices, DLT devices, synchronized time source, clock displays and real time simulator. This CGGS testbed was set in the Advanced Protection Lab, 252 lab space of the Grid Research Integration and Deployment Center (GRID- C), at Oak Ridge National Laboratory. In power grids, customer-owned distributed energy resources (DERs) are more frequent than in the past, and the numbers of points of interconnection (POI) with customer-owned DERs have increased. Disruptive operation from DERs presents a risk to grid operations, and protective relays located at the POI are used to isolate out-of-tolerance or poorly behaving of DERs. Ensuring the integrity of data from the relays at the POI, and DLT could enhance the security of the power grids. The first application is a SC to define and control the allowable total power factor (TPF) of the DER (wind farm) output, and the terms of the SC are implemented using DLT with a CGGS for a customer-owned DER [1]. The TPF SC was implemented by the CGGS using DLT. The experimental model was performed with a real-time simulator using a CGGS and relay in-the-loop. The data collected from the CGGS were used to execute the TPF SC. The TPF limits were between +0.9 and +1.0, and the breakers’ operation in the POI was controlled by the relay using the SC. The events were collected from the real-time simulator, CGGS, and SEL 700GT relay to validate a successful application of the TPF SC using DLT. The second application is a SC to measure and control the allowable voltage service limits (VSL) by the CGGS using DLT. The tests were performed by using a real-time simulator, CGGS and relay in-the-loop. The data was collected from the CGGS that executed the SC. The main constraints were defined based on ANSI C84.1 service voltage limits, and the operation of the breakers in the POI. The events were collected from the CGGS, and SEL 700GT relay to assess a successful operation of the VSL SC using DLT.