The limited availability of reconstruction resources is one of the main challenges that often confront postdisaster recovery of damaged transportation networks. This requires an effective and efficient deployment and utilization of these limited resources in order to minimize both the performance loss of the damaged transportation network and the reconstruction costs. This paper presents the development of a robust model for planning postdisaster reconstruction efforts that is capable of: (1) optimizing the allocation of limited reconstruction resources to competing recovery projects; (2) assessing and quantifying the overall functional loss of damaged transportation networks during the recovery efforts; (3) evaluating the impact of limited availability of resources on the reconstruction costs; and (4) minimizing the performance loss of transportation networks and reconstruction costs. The model utilizes the user equilibrium algorithm to enable the assessment of the transportation network performance loss...
1 October 2010 in Journal of Management in Engineering
Postdisaster recovery efforts of damaged civil infrastructure systems need to be optimized in order to alleviate the adverse impacts of natural disasters on local societies and economies. This paper presents an innovative framework that integrates two newly developed models for resource utilization and multiobjective optimization that are designed to optimize these recovery efforts. The developed models provide new and unique capabilities, including (1) allocating limited reconstruction resources to competing recovery projects, (2) estimating the reconstruction duration and cost associated with implementing specific recovery plans, and (3) generating optimal trade-offs between minimizing the reconstruction duration and cost. An application example is analyzed to evaluate the performance of the developed models and demonstrate their capabilities in identifying a wide spectrum of optimal reconstruction plans, where each provides a unique and nondominated trade-off between minimizing the recovery duration an...
1 September 2016 in Journal of Infrastructure Systems
Because of their potential danger to public health, economic loss, environmental damage, and energy waste, underground water pipelines leaks have received more attention globally. Researchers have proposed active leakage control approaches to localize, locate, and pinpoint leaks. Noise loggers have usually been used only for localizing leaks while other tools were used for locating and pinpointing. These approaches have resulted in additional cost and time. Thus, regression and artificial neural network (ANN) models were developed in this study to localize and locate leaks in water pipelines using noise loggers. Several lab experiments have been conducted to simulate actual leaks in a sample ductile iron pipeline distribution network with valves. The noise loggers were used to detect these leaks and record their noise readings. The recorded noise readings were then used as input data for the developed models. The ANN models outperformed regression models during testing. Moreover, ANN models were s...
1 August 2016 in Journal of Performance of Constructed Facilities
The deterioration of water pipelines leads to impaired water quality, increased breakage rate, and reduced hydraulic capacity. The planning of maintenance programs for water pipelines is essential to minimize health and safety concerns and ensure an adequate supply of water in a safe, cost-effective, reliable, and sustainable manner. It is essential to assess the performance of water pipelines to assist municipalities in planning inspection and rehabilitation programs for their pipelines. Several models have been developed to assess the condition or performance of water pipelines based on several affecting factors. However, none of them considered the interdependency relationships between the factors. Moreover, some models did not account for the factors’ weights uncertainty. This paper presents the development of performance assessment models for water pipelines. The models consider three groups of factors affecting water pipeline performance, namely, physical, environmental, and operational. The...
1 December 2016 in Journal of Construction Engineering and Management
Despite the efforts of governments to promote sustainable construction practices, the decision to adopt sustainability practices largely falls upon the firms involved in construction projects. This paper presents an econometric model that describes the relationship between the level of sustainability experience a firm possesses and its characteristics and behavioral attributes. Data for this research were collected in Qatar by means of a survey as part of a study that aimed to analyze the triggers of sustainability adoption in the Qatari construction market. The presented model showed that a number of behavioral attributes of firms, besides their origin and the average size of projects they undertake, determine the level of sustainability experience these firms might have. Examples include firms’ risk-taking tendencies, their claimed competitive advantages, and their previous history of introducing changes to their modus operandi. This research adds to the body of knowledge on sustainable construc...
1 June 2017 in Journal of Architectural Engineering
Uncertainty is an inherent characteristic of decision making related to sustainable construction projects. The main reason for this uncertainty is the incomplete information available to stakeholders on the relative impact of their decision criteria and the full consequences of the sustainability decisions on the projects’ financial and environmental performance. One of the critical decisions made to achieve the objectives of sustainable construction projects is the choice of credits that qualify projects for certification by sustainability rating systems like Leadership in Energy and Environmental Design (LEED). The objective of this paper is to create an objective methodology for the sustainability credit selection along with a modeling tool that incorporates the proposed methodology and then compare the performance of this tool with that of the commonly used cognitive approaches to decision making. Therefore, structured interviews were held with industry professionals, the results of which are used to develop an ordered-probit statistical model that identifies the significant independent parameters affecting the subject credit-selection decisions. Subsequently, the proposed credit-selection methodology is developed based on the ELECTRE III technique and compared with the intuition-based approach. The validation of the model results is performed by comparing the model output with credits actually selected in a number of actual projects targeting certification by LEED and the Qatar Sustainability Rating System (QSAS). The results of this comparison indicate that the developed methodology is capable of providing valuable guidance in the credit-selection process in the early stage of project design. The methodology also provides a systematic and consistent way for credit selection based on in-depth analyses of the evaluation criteria and perceived project priorities.