Chunlin Peng

Mr. Chunlin Peng


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 May 2026 in Machines
Verified
Journal Article
Open access
PDF file
CPChunlin Peng
Chunlin Peng
XYXiaowei Yuan
Xiaowei Yuan
FWFei Wang
Fei Wang
JSJiachun Sun
Jiachun Sun
SYShaochen Yang
Shaochen Yang
YZYakun Zhang
Yakun Zhang
The Earth Pressure Balance (EPB) shield machine plays a pivotal role in underground tunnel excavation, where precise control of chamber pressure is essential for maintaining tunnel stability and minimizing risks. Traditional EPB control methods heavily rely on operator experience, resulting in delays and limited responsiveness to sudden geological changes. This paper presents an improved EPB mechanism model that builds upon traditional approaches, which primarily consider chamber pressure changes caused by soil volume variations. The improved model further incorporates the effects of excavation face pressure variations, arising from factors such as cutterhead soil extrusion and changing geological conditions. By integrating these additional influences, the model achieves more accurate predictions of chamber pressure. To further enhance performance, a hybrid modeling approach is proposed, combining the improved mechanism model with a data-driven component that compensates for residual prediction errors. The hybrid model is validated using field data from two distinct tunneling projects, demonstrating superior prediction accuracy and generalization capability compared to standalone mechanisms and data-driven models. The results confirm that the proposed hybrid model significantly improves pressure prediction accuracy and provides a more reliable solution for intelligent control of the EPB process.