Fernando Lopez-Irarragorri

Dr. Fernando Lopez-Irarragorri

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2018 in Journal of Industrial and Management Optimization
Verified
Journal Article
Open access
PDF file
PAPaulina A. Avila-Torres
Paulina A. Avila-Torres
FLFernando Lopez-Irarragorri
Fernando Lopez-Irarragorri
RCRafael Caballero
Rafael Caballero
YRYasmin Rios
Yasmin Rios
ALAv. Pedro de Alba Universidad Autónoma de Nuevo León
Av. Pedro de Alba Universidad Autónoma de Nuevo León
The urban transport planning process has four main activities: Network design, Timetable construction, Vehicle scheduling and Crew scheduling; each activity has subactivities. In this paper the authors work with the subactivities of timetable construction: minimal frequency calculation and departure time scheduling. The authors propose to solve both subactivities in an integrated way. The developed mathematical model allows multi-period planning and it can also be used for multimodal urban transportation systems. The authors consider demand uncertainty and the authors employ fuzzy programming to solve the problem. The authors formulate the urban transportation timetabling construction problem as a bi-objective problem: to minimize the total operational cost and to maximize the number of multi-period synchronizations. Finally, the authors implemented the SAUGMECON method to solve the problem.