Carla Di Biccari

Dr. Carla Di Biccari


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2019 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
CBCarla Di Biccari
Carla Di Biccari
JAJ Abualdenien
J Abualdenien
ABA Borrmann
A Borrmann
ACA Corallo
A Corallo
The Circular Economy paradigm seeks to shift products and systems from linear to "closed loop" life cycles applying specific business models and strategies to their designs and lifelines. The implementation of the circular economy in buildings depends on the efforts made by all the stakeholder involved in the life cycle of a building, where it can draw most of the benefits if the application of a circular business model is planned during the design phases. Building Information Modelling is an approach that helps designers in creating and managing semantically rich 3D-models describing the status of the building over its life cycle. In this paper, a BIM-based framework for evaluating the application of circular business models of buildings from the circularity and the life cycle cost points of views is proposed.

7 November 2017 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
MMManuela Marra
Manuela Marra
CBCarla Di Biccari
Carla Di Biccari
MLMariangela Lazoi
Mariangela Lazoi
CACorallo Angelo
Corallo Angelo
Product lifecycle management (PLM) is a strategic and holistic approach for the management of information, processes, and resources supporting the entire product lifecycle from concept to disposal. Several systems are available to manage data and information during the lifecycle. A PLM system does not have to be considered as a unique solution, but as a set of software supporting different perspectives and activities related to the lifecycle management. A full comprehensive implementation of PLM systems is rare. Since PLM reflects the peculiarities of processes and data structures, implementation differences are evidently observable among companies. The design of methods and tools supporting an assessment of PLM implementation inside a company can enable a correct definition of PLM strategies and goals. Based on these premises, the paper aims to specify a methodology for carrying out a gap analysis of PLM with the scope of discovering existing technological and methodological gaps, and planning actions for improvement. The proposed methodology implements a visual and lean reference model, and an assessment questionnaire for data collection. Lesson learned and feedback from three industrial applications are also described and discussed.

Verified
Journal Article
Open access
PDF file
COChristelle Ntuala Ompua
Christelle Ntuala Ompua
CBCarla Di Biccari
Carla Di Biccari
Niklas LavessonNiklas Lavesson
Niklas Lavesson
CACorallo Angelo
Corallo Angelo
The architecture, engineering, construction, and operations (AECO) sector is undergoing rapid digital transformation, driven by Industry 4.0 technologies such as BIM, IoT, and digital twins. While these tools improve efficiency, they are increasingly blurring the lines between the digital and physical worlds, making the building sector a prime target for cyberattacks. This evolution has generated considerable academic interest, particularly since 2020, as the potential consequences of data breaches now extend beyond data loss to include disruption of physical assets. Given the need for a structured overview of this rapidly evolving field, this article provides a systematic bibliometric analysis, reported in accordance with PRISMA 2020 guidelines, of cybersecurity research in the AECO sector. From a total of 183 peer-reviewed documents, books/chapters retrieved from the Scopus database, covering the period 2004–2026 (early access), a performance analysis was first conducted to assess research productivity and geographical contributions. Next, a scientific mapping based on keyword co-occurrence visualized the knowledge base. Four major thematic clusters were identified and discussed in detail. Finally, a future research agenda is proposed, emphasizing a transition to proactive AI-based detection and holistic governance. These findings provide insights into the current research landscape and suggest opportunities for future investigation.

1 January 2023
Verified
Book Chapter
Open access
MMMattia Mangia
Mattia Mangia
CBCarla Di Biccari
Carla Di Biccari
MRMattias Roupé
Mattias Roupé
Complex infrastructures such as railway networks face increasing challenges related to resource allocation, external events, constraints, and demands. Therefore, it is crucial to optimize the Asset Management (AM) phase to ensure the value and functionality of the assets. The integration of Building Information Modelling (BIM) and Geographic Information Systems (GIS) can support this phase, but it can only yield benefits with a comprehensive approach that considers and addresses the specific needs and resources of the assets and their AM organization. The main benefits include improved data management, manipulation, information visualization and optimized resource allocation. This study describes an intermediate step towards developing a BIM/GIS integration framework for AM that can guide both researchers and practitioners. The framework aims to bridge theory and practice by incorporating insights from literature reviews and case studies. Its main objectives are to provide a comprehensive multi-stakeholder view and methods for effectively integrating BIM and GIS in this context. To develop the framework, the study employed focus groups, interviews, and practical BIM/GIS tests, which provided insights reported in this article. Furthermore, the study provides research directions for effective BIM/GIS integration in infrastructure AM

19 November 2025
Verified
Book Chapter
Closed access
PDF file
IBIchrak Boudjelkha
Ichrak Boudjelkha
CBCarla Di Biccari
Carla Di Biccari
MLMariangela Lazoi
Mariangela Lazoi
EMEliana Mello
Eliana Mello

17 July 2026 in Heritage
Verified
Journal Article
Open access
PDF file
MMMattia Mangia
Mattia Mangia
CBCarla Di Biccari
Carla Di Biccari
Daniela FicoDaniela Fico
Daniela Fico
DRDaniela Rizzo
Daniela Rizzo
Carola Esposito CorcioneCarola Esposito Corcione
Carola Esposito Corcione
Cultural Heritage (CH) is becoming increasingly vulnerable to the impacts of climate change, aging, and environmental decay, necessitating advanced preventive conservation strategies. This study presents the results of the SPIDER project, focused on Marquis’s Palace in Botrugno, a small but representative case study in Southern Italy of a municipality overwhelmed with the management of valuable CH sites. The approach integrates multi-sensor surveys, subsurface diagnostics, HBIM modeling, and IoT microclimatic monitoring into a lightweight information model designed for operational flexibility. In addition to that, the possibility of producing new, eco-friendly filaments for Fused Filament Fabrication (FFF) printing from industrial stone dust waste was explored through a preliminary morphological, structural, and chemical–physical investigation of the stone material historically used in construction, with the aim of identifying materials similar to the original using a simplified, low-cost process. The findings highlight that economic and social factors such as limited resources and the “digital divide” hinder effective technology transfer. Consequently, this study investigates whether a “lightweight” Asset Information Model (AIM) can provide a more sustainable alternative to complex Digital Twins for small municipalities and other public bodies. For this reason, this research proposes a scalable, wide but basic framework of information management tools and methods aimed at enhancing territorial capacity building, fostering technology integration and social inclusion, and valorizing multidisciplinary approaches to address the challenges affecting CH.