MARÍA DEL PILAR AVILÉS-VERA

Dr. MARÍA DEL PILAR AVILÉS-VERA

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 October 2016
Verified
Book Chapter
Closed access
PDF file
VVVanessa Vergara-Lozano
Vanessa Vergara-Lozano
KLKatty Lagos-Ortiz
Katty Lagos-Ortiz
MMMARITZA ELIZABETH AGUIRRE MUNIZAGA
MARITZA ELIZABETH AGUIRRE MUNIZAGA
MAMARÍA DEL PILAR AVILÉS-VERA
MARÍA DEL PILAR AVILÉS-VERA
JMJosé Medina-Moreira
José Medina-Moreira
AMAna Muñoz-García
Ana Muñoz-García

20 October 2016
Verified
Book Chapter
Closed access
PDF file
MMMARITZA ELIZABETH AGUIRRE MUNIZAGA
MARITZA ELIZABETH AGUIRRE MUNIZAGA
RGRaquel Gomez
Raquel Gomez
MAMARÍA DEL PILAR AVILÉS-VERA
MARÍA DEL PILAR AVILÉS-VERA
MVMitchell Vasquez
Mitchell Vasquez
GRG. Cristina Recalde-Coronel
G. Cristina Recalde-Coronel

30 September 2024 in Ecuadorian Science Journal
Verified
Journal Article
Open access
PDF file
MBMitchell Vásquez Bermúdez
Mitchell Vásquez Bermúdez
JLJorge Hidalgo Larrea
Jorge Hidalgo Larrea
MAMARÍA DEL PILAR AVILÉS-VERA
MARÍA DEL PILAR AVILÉS-VERA
MVMiguel Molina Villacís
Miguel Molina Villacís
AJAlex Suárez Jaramillo
Alex Suárez Jaramillo
Contexto: Los sistemas de gestión de aprendizaje (LMS) han adquirido una relevancia creciente en los últimos años, desempeñando un papel crucial en las instituciones educativas al facilitar la administración de los procesos académicos y educativos de los estudiantes. Las instituciones deben ser capaces de seleccionar el sistema más adecuado según sus necesidades y prioridades académicas. Método: Este trabajo presenta una descripción detallada del concepto de los LMS, sus características, actividades y el funcionamiento que tienen en los centros educativos. Se utiliza el modelo AHP (Proceso Analítico Jerárquico), estableciendo criterios como procesos académicos, administrativos y tecnológicos. Resultados: Los resultados obtenidos del análisis de los LMS para Instituciones de Educación Superior en Ecuador son presentados a continuación. Conclusiones: El análisis AHP, basado en criterios académicos, administrativos y tecnológicos, determinó que Moodle es la mejor alternativa LMS para Instituciones de Educación Superior con un 49.2% de aceptación, seguida por Cambas LMS (23.4%), Blackboard (18.8%) y Sakai (8,6%).


28 May 2026 in Agriculture
Verified
Journal Article
Open access
PDF file
MMMARITZA ELIZABETH AGUIRRE MUNIZAGA
MARITZA ELIZABETH AGUIRRE MUNIZAGA
MVMitchell Vásquez-Bermúdez
Mitchell Vásquez-Bermúdez
JHJorge Hidalgo-Larrea
Jorge Hidalgo-Larrea
Yoansy GarcíaYoansy García
Yoansy García
MAMARÍA DEL PILAR AVILÉS-VERA
MARÍA DEL PILAR AVILÉS-VERA
Accurate estimation of weekly banana production is relevant for harvest, packing, and logistics planning at the farm level. This study compared Random Forest, XGBoost and Long Short-Term Memory (LSTM) models for estimating the number of banana boxes processed weekly on a commercial banana farm in Naranjal canton, Ecuador. The dataset comprised 156 weekly records from January 2022 to December 2024 and integrated meteorological, edaphological and operational variables. Records from 2022 and 2023 were used for model training and hyperparameter selection, while the 52 weekly records from 2024 were retained as an unseen chronological hold-out test set. XGBoost achieved the best numerical performance on the 2024 hold-out set, followed closely by Random Forest, whereas LSTM showed weaker predictive performance given the available data. Bootstrap confidence intervals supported a cautious interpretation of the numerical differences between the tree-based models. Feature-importance analysis identified harvested bunches as the dominant operational predictor, followed by autoregressive production features and selected management-, soil-, and weather-related variables. Because harvested bunches are available only after the weekly harvest operation, the proposed model should be interpreted as a same-week production estimation or nowcasting tool rather than as a strict multi-week-ahead forecasting model. The augmented Dickey–Fuller and KPSS tests jointly supported treating the weekly target series as stationary for the purposes of the present modeling workflow. The results are limited to one farm and three production years; therefore, external validation across additional farms, seasons, and explicit ahead-of-time forecast horizons is required before broader deployment.