Electric vehicles have been gaining attention as a cleaner means of transportation that is low-carbon and environmentally friendly and can reduce greenhouse gas emissions and air pollution. Despite EVs’ many advantages, widespread adoption will negatively affect the electric grid due to their random and volatile nature. Consequently, predicting the charging demand for electric vehicles is becoming a priority to maintain a steady supply of electric energy. Time series methodologies are applied to predict the charging demand: traditional and deep learning. RNN, LSTM, and transformers represent deep learning approaches, while ARIMA and SARIMA are traditional techniques. This research represents one of the first attempts to use the Transformer model for predicting EV charging demand. Predictions for 3-time steps are considered: 7 days, 30 days, and 90 days to address both short-term and long-term forecasting of EV charging load. RMSE and MAE were used to compare the model’s performance. According to the results, the Transformer outperforms the other mentioned models in terms of short-term and long-term predictions, demonstrating its ability to address time series problems, especially EV charging predictions. The proposed Transformers framework and the obtained results can be used to manage electricity grids efficiently and smoothly.
Electric vehicles (EVs) contribute to reducing fossil fuel dependence and environmental pollution problems. However, due to complex charging behaviors and the high demand for charging, EVs have imposed significant burdens on power systems. By providing reliable forecasts of electric vehicle charging loads to power systems, these issues can be addressed efficiently to dispatch energy. Machine learning techniques have been demonstrated to be effective in forecasting loads. This research applies six machine learning methods to predict the charging demand for EVs: RNN, LSTM, Bi-LSTM, GRU, CNN, and transformers. A dataset containing five years of charging events collected from 25 public charging stations in Boulder, Colorado, USA, is used to validate this approach. Compared to other highly applied machine learning models, the transformer method outperforms others in predicting charging demand, demonstrating its ability for time series forecasting problems.
1 July 2016 in Transportation Research Part D: Transport and Environment
City, regional and state transportation planning authorities typically need to undertake multiple transportation improvement projects to maintain the desired level of service in a road network. Due to budgetary restrictions and to avoid inconvenience to network users, sequencing (or stage construction) of highway projects is usually considered by these decision-making agencies. This paper proposes a two-step process to determine the optimal sequencing of road network capacity improvement projects. In the first step, bi-level problems determine an optimal set of capacity improvement projects for potential links in a network. Then, in the second step, sequencing of projects is determined through an optimization framework with twofold prioritization criteria. The implementation feasibility of the proposed method is demonstrated through the numerical experiments using city, county and regional networks. The results of numerical experiments suggest that a proper sequencing of transportation projects can lead to significant network user travel time savings during construction.