The problem of large deformation is very prominent in deep-buried tunnel excavation in soft rock, which brings serious potential safety hazards and economic losses to projects. Knowledge of the stress field distribution and deformation law is the key to ensuring rational design and safe construction in large deformation tunnels of soft rock. As described in this paper, theoretical analysis, numerical simulation and field monitoring were employed to investigate the surrounding rock stress and displacement state in the Dongsong hydropower station in Sichuan Province, China. The results show that the short-bench construction method can effectively control the deformation of surrounding rock and range of the plastic zone. In order to reserve enough working space, the optimum bench length in the actual construction was 10 to 14 m. The peripheral displacement and plastic radius decreased with the increase of tunnel support strength and the advance of supporting time. The displacement can be effectively controlled by applying the second lining in time at a position about twice the diameter of the hole (16 m) from the working face. A reasonable reserved deformation should be adopted to avoid secondary expanding excavation. The values of different positions in the tunnel laterally and longitudinally may be different, and adjustments are needed according to the actual situation.
The problem of large deformation is very prominent in deep-buried tunnel excavation in soft rock, which brings serious potential safety hazards and economic losses to projects. The knowledge of deformation law and support measures is the key to ensure the rational design and safe construction in a large deformation tunnel of soft rock. This paper describes rock physical and mechanical tests and field monitoring is employed to investigate the cause and development process of large deformation in Dongsong hydropower station in Sichuan Province, China. The results show that the free expansion rate of the rock sample is 20.0%, the average expansion stress of the rock sample is 11.0 kPa, and the expansibility of the rock is low. Large deformation of surrounding rock mainly comes from the dilatancy effect with high geostress and relaxation deformation with weak support. Shotcrete sealing exposed surrounding rock, and early strength support avoiding water immersion are useful to deal with the three main factors (weathering, water and confining pressure) that affect the strength of surrounding rocks. The second lining applied in time can effectively limit the further development of stress and deformation of initial support, and prevent the cracking and large deformation of concrete. Clearance convergence is suggested to be the main monitoring work in construction, because of its advantages of intuitive results, easy quality assurance of instrument installation and high accuracy.
Rockburst hazards induced by high geostress are particularly prominent during the construction of underground engineering. Prevention and control of rockburst is still a global challenge in the field of geotechnical engineering, which is of great significance. Based on the tunnel group of the Jinping II hydropower station of China, this paper analyzed the mechanical principle of support in the process of construction, and discussed in detail the active release and passive support by numerical simulation and field application. The results show that as two active measures, stress relieve holes and advanced stress relief blasting can release the energy of the microseismic source and transfer the high stress to the deeper surrounding rock, make the surface rock wall with a relatively low stress act as a protective barrier. Their stress release rate is about 12% and 33% in this project, respectively. In term of passive measure, the combined rapid support, which is mainly composed of water swelling anchor and nano-admixture shotcrete, is also an effective way to prevent and control the rockburst under high geostress.
In order to relieve the increasing ground traffic pressure in the process of urbanization in China, it is inevitable to build more metro lines. However, the stratum movement caused by tunneling affects the safety of adjacent underground structures and aboveground buildings. Therefore, how to evaluate and control the stratum movement is a prominent problem. In this paper, based on the engineering project of an interval tunnel between Shizishan Station and Chuanshi Station in Chengdu Metro Line 7, China, the action mechanism of stratum movement induced by shield tunneling is analyzed, and the effect factors are divided into two categories: ground loss factors and mechanical factors. Combining the advantages of Loganathan method and mirror source-sink method, a new solution of three-dimensional displacement induced by ground loss is proposed. Based on the elastic half-space Mindlin model, the displacement at any point induced by four mechanical effect factors is deduced. Finally, the total displacement is verified by field monitoring data and quantitative analyzed in various parts.
Rock mass deformation is a time related process, especially for soft rock. Its deformation usually has a certain timeliness. Moreover, the deformation of surrounding rock is typically asymmetric. Therefore, it is of great significance to reasonably describe the time-dependent mechanical properties and behaviors of rock mass for practical engineering, especially when the actual engineering is a symmetric structure. Taking the chlorite schist section at the west end of the diversion tunnel of Jinping II Hydropower Station as the research object and introducing the characteristic that creep parameters attenuate with equal effect change into Burgers constitutive model used for numerical calculation, an improved Burgers model is proposed. Then, according to the actual situation of the project, the improved three-parameter H-K model, which is suitable for this study, is proposed by using the fractional calculus method. The effects of different factors on the rheological properties of soft rock tunnels are discussed. The results show that When K is equal to 1, creep is positively correlated with burial depth; When the burial depth H is 1500 m, the creep deformation is positively correlated with the horizontal geostress; The farther away from the working face, the greater the instantaneous elastic deformation release and the later creep displacement; After the tunnel excavation is stopped, the earlier the support is, the smaller the later creep deformation is; After excavation and support of the upper bench, the longer the stagnation time is, the more unfavorable the rheological deformation of the tunnel is.