Kyu-Tae Shim

Dr. Kyu-Tae Shim

Catholic Kwandong University
orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 April 2018 in Journal of Sensors
Verified
Journal Article
Open access
PDF file
Kyu-Han KimKyu-Han Kim
Kyu-Han Kim
SCSi-Bum Cho
Si-Bum Cho
Hyun Dong KimHyun Dong Kim
Hyun Dong Kim
KSKyu-Tae Shim
Kyu-Tae Shim
The characteristics of a new wave power generating system have been proposed by installing a piezoelectric sensor to the seaward position of an existing coastal structure. By installing the sensor to the structure, waves will hit the piezoelectric sensor to generate wave energy; at the same time, the structure acts as a wave breaker. This technique can be applied to various coastal structures to converge the functions of renewable energy generator and the wave reducing structure. This technique of using piezoelectric sensor is relatively inexpensive that can be used for economic purposes as well. Throughout the study, usability of the existing coastal structure and characteristics of current research trend in the ocean wave energy retrieval of the wave power generators have been analyzed. Hydrographic analysis of this technique has been conducted by hydraulic model experiment using 2D wave flume and confirmed that the wave pressure and voltages maximize when higher wave with longer period of wave induces. Throughout the experiment, correlations of generation volume and wave conditions have been found.

Verified
Journal Article
Open access
PDF file
KSKyu-Tae Shim
Kyu-Tae Shim
Kyu-Han KimKyu-Han Kim
Kyu-Han Kim
JPJun-Ho Park
Jun-Ho Park
A physical model test was carried out to evaluate a measure of reducing sediment transport in a condition of erosive wave incidence. The erosion trend was analyzed in a beach profile consisting of 0.1 mm sand, and a scenario in which 1 mm and 5 mm materials were applied to the erosion section was conducted. The effects of beach nourishment profiles with different sand diameters were verified by comparing the results when the submerged breakwater was installed. In addition, because high waves are usually accompanied with strong wind, to determine the wind effect, morphological change was examined under waves only and the coexistence of waves and wind together. The experimental results showed that sediment transport around the shoreline decreased in a condition of nourishment with 1 mm grains, and the total amount of morphological change was similar to the case in which the submerged breakwater was installed. The results illustrated that a change in wind velocity increased the wave energy density, as well as the range of morphological change.

16 August 2023 in Water
Verified
Journal Article
Open access
PDF file
KSKyu-Tae Shim
Kyu-Tae Shim
Kyu-Han KimKyu-Han Kim
Kyu-Han Kim
This study investigated the beach nourishment effect and topographical changes when using nourishment sand with relatively large particle diameters to perform beach nourishment on a beach subject to erosion. A physical model test was conducted in a 2D wave flume with an installed wind tunnel. The experiment examined the sediment transport mechanism under conditions with wind and waves. Although applying nourishment sand with large particle diameters attenuated sediment transport, the increase in particle diameter was not always proportional to the reduction in topographical changes. Increasing the particle diameter of the nourishment sand increased the friction force between particles, resulting in large-scale erosion and accretion around the coastline, and this trend increased with winds. Also, with wind, the wave run-up height increased, the undertow became stronger, and large-scale scouring occurred at the boundary between the nourishment sand and the existing beach. Increasing the particle diameter of the nourishment sand played a role in reducing the run-up phenomenon (d50: 1.0 mm with 24–50%, d50: 5.0 mm with 59–83%), and the range of particles moved by winds also decreased (d50: 1.0 mm with 10–38%, d50: 5.0 mm with 5–37%).

2 May 2019 in Journal of Sensors
Verified
Journal Article
Open access
PDF file
Kyu-Han KimKyu-Han Kim
Kyu-Han Kim
BSBum-Shick Shin
Bum-Shick Shin
KSKyu-Tae Shim
Kyu-Tae Shim
The construction of large-scale coastal structures in any coastal area may not only have direct effects on the coastal environment in that vicinity but also cause severe property damage. In order to prevent this problem, probable effects should be appreciated before any construction and the mechanism that may cause any probable damage must be accurately analyzed along with the plans to minimize damage. This study sought to analyze the cause and mechanism of damage inflicted on coasts by artificial structures through reviewing beach erosions that have occurred on beaches on the east coast of Korea after the large-scale construction of artificial structures, for which wave heights were measured in the vicinity of those structures, and the correlation between the measurements and the analysis data of waves and coastal erosion on the surrounding beach was analyzed. In addition, the correlation between coastal erosion and wave data was applied in order to understand what impact large waves have in relation to sand loss. Accordingly, a movable-bed physical model test was employed to appraise the factors that cause coastal erosion to take place.

Verified
Journal Article
Open access
PDF file
KSKyu-Tae Shim
Kyu-Tae Shim
Kyu-Han KimKyu-Han Kim
Kyu-Han Kim
The study area was Anin Beach, where a 1.48-km-long breakwater, consisting of a non-porous caisson, was constructed over 16 months. During this process, significant erosion occurred over a wide area behind the coast, with a maximum reduction in the beach width of 36 m observed in the central part of the coastline. As a countermeasure to prevent erosion, a submerged breakwater was installed that consisted of concrete blocks and had a length of 600 m. Following the implementation of this submerged breakwater, the beach behind it increased in width by 64 m, in proportion to the installation length, while erosion phenomena, such as the loss of coastal roads, were observed at both ends of the structure. In this study, the topographical changes caused by waves and currents were analyzed to identify their causes and establish countermeasures. Additionally, the planned measures, established before structure installation, were closely examined against the actual occurrences observed onsite through a coastline survey.

5 June 2020 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
Kyu-Han KimKyu-Han Kim
Kyu-Han Kim
KSKyu-Tae Shim
Kyu-Tae Shim
KLKi-Hee Lee
Ki-Hee Lee
BIByung-Chan Im
Byung-Chan Im
When a land area is established on top of soft ground on a coast and an estuary though reclamation, the reclamation is carried out by dropping gravel and rubble in order to improve the efficiency in the movement of equipment and the work being done. There is a difficulty with regard to final closing work in the closing section due to the occurrence of scouring. This is because the closing work is carried out with an increased flow velocity as a significant difference in water level occurs during the tidal embankment construction work for developing the inner side of the embankment by blocking seawater. In this study, the distribution of layer velocity and particle tracking according to the phased closing work with the high water level (DL(+)9.17 m) as the normal tidal condition were carried out. In addition, the flow velocity field was cross-correlated through the numerical simulation and hydraulic model test. When the tidal embankment was constructed using the combined deep and high critical method through the experiment, an increase in the flow velocity occurred in the closing section as the closing width became narrower. The flow velocity decreased due to a decrease in the cross sectional area of flow within 20 m of the closing width. The layer velocity reached a maximum near the bottom layer due to the installation of a sill and reached a minimum in the middle layer.