Xiaole Han

Mr. Xiaole Han


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 June 2026 in Symmetry
Verified
Journal Article
Open access
PDF file
FHFeng Haochen
Feng Haochen
WGWeiming Guan
Weiming Guan
HWHAOSEN WANG
HAOSEN WANG
XWXin Wang
Xin Wang
XHXiaole Han
Xiaole Han
CQCheng Qian
Cheng Qian
Rock bolt corrosion can weaken support systems and affect the long-term stability of water-flooded roadways. This study investigates the symmetry evolution of roadway deformation induced by bolt deterioration in alkaline water-flooded roadways, using Sanxin Coal Mine, Xinjiang, as a case. Electrochemical accelerated corrosion tests were conducted in 10% Na2SO4 solutions at pH = 9, 11, and 13 for 3, 6, and 9 d, followed by uniaxial tensile tests and FLAC3D numerical simulations. Under the controlled accelerated electrochemical conditions, the mass loss rate and corrosion rate generally increased with corrosion duration, with the greatest deterioration observed in the pH = 13 group after 9 d. The tensile curves of corroded bolts still exhibited elastic deformation, yielding, strain hardening, and post-peak softening stages. However, the yield load decreased with increasing mass loss rate, with fitted slopes of −0.1842, −0.07531, and −0.04998 kN/% for pH = 9, 11, and 13, respectively. Numerical results showed that bolt deterioration intensified roadway deformation and stress redistribution. Under severe corrosion, the horizontal displacement of the two sidewalls reached approximately −153.7 mm and 155.4 mm, while the maximum roof subsidence and floor heave reached about −188.7 mm and 191.3 mm, respectively. The shallow stress release zone expanded, and the deep stress concentration became more pronounced. Moreover, bolt deterioration intensified the roadway response while largely preserving its left–right symmetry. The numerical results incorporating the experimentally derived bolt deterioration showed increased roadway deformation and stress redistribution, indicating that bolt-capacity degradation can adversely affect roadway stability. These findings provide a reference for evaluating residual support performance and designing reinforcement measures for water-flooded roadways.

29 May 2026 in Symmetry
Verified
Journal Article
Open access
PDF file
XHXiaole Han
Xiaole Han
WGWeiming Guan
Weiming Guan
XWXin Wang
Xin Wang
CQCheng Qian
Cheng Qian
HWHAOSEN WANG
HAOSEN WANG
DHDefeng Hou
Defeng Hou
Determining the safe thickness of a boundary crown pillar is critical during the transition from open-pit to underground mining, as it directly affects both mining safety and resource recovery. Crown pillar instability is commonly associated with asymmetric stress redistribution, nonuniform deformation, and progressive plastic failure. In this study, the Kumusayi Li-Nb-Ta mine in Xinjiang, China, was selected as an engineering case to optimize the boundary crown pillar thickness and evaluate its deformation characteristics. Four theoretical methods, namely the load transfer intersection method, span-to-thickness ratio method, simplified structural beam method, and Rubeneeite formula method, were first used to determine the feasible thickness range. The calculated thicknesses were 19.99, 14.00, 29.81, and 10.41 m, respectively, yielding an engineering design interval of 14.00–29.81 m. Based on this interval, four thickness schemes of 15, 20, 25, and 30 m were evaluated using FLAC3D simulations in terms of stress redistribution, displacement evolution, surface movement, plastic-zone development, and deformation symmetry. The results show that the 15 m pillar exhibits pronounced stress concentration, asymmetric deformation, and through-going plastic failure, indicating insufficient stability. Although the 20 m pillar improves the load-bearing capacity, a potential connected failure path remains. At 25 m, the high-stress zone becomes localized, the plastic zone no longer penetrates the pillar, and the maximum vertical displacement decreases by approximately 27.0% compared with the 15 m scheme. Increasing the thickness to 30 m provides limited additional improvement, with less than a 2% reduction in maximum vertical displacement compared with the 25 m scheme. Physical similarity model tests further confirm that a 20.8 cm model pillar, corresponding to a 25 m prototype pillar, effectively prevents through-going cracking and overall slope sliding. Therefore, a 25 m boundary crown pillar is recommended for the Kumusayi mine.