High penetration of distributed photovoltaic (PV) generation complicates coordinated PV–energy storage system (ESS) planning and network operation, especially where discrete and continuous reactive-power devices coexist. This study develops a screening-assisted planning–operation framework incorporating capacitor banks (CBs) and static var compensators (SVCs). A time-averaged voltage-stress index (TVSI) and network-loss sensitivity (NLS) identify candidate installation buses. The screened layout A1 is compared with the reference layout A0 at matched PV/ESS ratings under prescribed and coordinated reactive-power control. Under coordinated control, A0 achieves 1.14% lower daily operating cost and 13.17% lower physical voltage deviation than A1; thus, the screened layout is not adopted for subsequent capacity planning. At the retained A0 sites, PV/ESS capacities and seasonal dispatch are jointly optimized using single-level mixed-integer second-order cone programming (MISOCP) with relaxed branch-flow constraints. The formulation includes PV availability and curtailment, ESS state-of-charge dynamics, voltage and branch-current limits, CB configuration-change limits and stage-operation costs, and a unified upstream electricity-purchase boundary. Four-season profiles and probability-weighted PV–load–price scenarios support deterministic and scenario-based planning, with common-input evaluation and independent alternating-current (AC) power-flow verification. In the IEEE 33-bus system, coordinated control reduces A0’s physical voltage-deviation index by 42.96% relative to prescribed control, at a higher daily cost. Scenario-based planning yields a 0.43% lower observed annualized test cost than deterministic planning on the common 30-day sample, while both satisfy the checked AC limits.