Shijin WANG

Dr. Shijin WANG


Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 June 2019 in International Journal of Production Research
Verified
Journal Article
Closed access
SWShijin WANG
Shijin WANG
XWXiaodong Wang
Xiaodong Wang
FCFeng Chu
Feng Chu
JYJianbo Yu
Jianbo Yu
Energy-efficient scheduling is highly necessary for energy-intensive industries, such as glass, mould or chemical production. Inspired by a real-world glass-ceramics production process, this paper investigates a bi-criteria energy-efficient two-stage hybrid flow shop scheduling problem, in which parallel machines with eligibility are at stage 1 and a batch machine is at stage 2. The performance measures considered are makespan and total energy consumption. Time-of-use (TOU) electricity prices and different states of machines (working, idle and turnoff) are integrated. To tackle this problem, a mixed integer programming (MIP) is formulated, based on which an augmented ε-constraint (AUGMECON) method is adopted to obtain the exact Pareto front. A problem-tailored constructive heuristic method with local search strategy, a bi-objective tabu search algorithm and a bi-objective ant colony optimisation algorithm are developed to deal with medium- and large-scale problems. Extensive computational experiments are conducted, and a real-world case is solved. The results show effectiveness of the proposed methods, in particular the bi-objective tabu search.

13 November 2015 in International Journal of Production Research
Verified
Journal Article
Closed access
MLMing Liu
Ming Liu
SWShijin WANG
Shijin WANG
CCChengbin Chu
Chengbin Chu
Feng ChuFeng Chu
Feng Chu
In this paper, we investigate a single-machine scheduling problem with periodic maintenance, which is motivated by various industrial applications (e.g. tool changes). The pursued objective is to minimise the number of tardy jobs, because it is one of the important criteria for the manufacturers to avoid the loss of customers. The strong NP-hardness of the problem is shown. To improve the state-of-the-art exact algorithm, we devise a new branch-and-bound algorithm based on an efficient lower bounding procedure and several new dominance properties. Numerical experiments are conducted to demonstrate the efficiency of our exact algorithm.

19 October 2019 in Soft Computing
Verified
Journal Article
Closed access
PDF file
SWShijin WANG
Shijin WANG
RWRuochen Wu
Ruochen Wu
FCFeng Chu
Feng Chu
JYJianbo Yu
Jianbo Yu

27 March 2017 in International Journal of Production Research
Verified
Journal Article
Closed access
MLMing Liu
Ming Liu
SWShijin WANG
Shijin WANG
FZFeifeng Zheng
Feifeng Zheng
CCChengbin Chu
Chengbin Chu
In this paper, we investigate a joint multitasking scheduling and common due date assignment problem on a single machine, for which examples can be found in product delivery process in logistics. Multitasking allows the machine to perform multiple tasks. The multitasking phenomenon has been observed in various practical domains, including manufacturing and administration. In multitasking settings, each waiting job interrupts a currently in-processing job, causing an interruption time and a switching time. In common due date assignment problems, the objective is to determine the optimal value of this due date with the purpose of minimising a total penalty function, which is associated with service quality. For the problem with general interruption functions, analytical properties are obtained to reduce the search space of the optimal solutions. For the cases with linear interruption functions, we develop a polynomial-time algorithm. Numerical experiments have been conducted to validate the efficiency of our proposed algorithm. Computational results also demonstrate an interesting phenomenon that in some cases, the optimal solutions under multitasking are superior to the counterparts without multitasking. Besides, we also devise a mixed integer programme for the cases with linear interruption function.

14 May 2020 in International Journal of Production Research
Verified
Journal Article
Closed access
SWShijin WANG
Shijin WANG
WCWenli Cui
Wenli Cui
We consider the robust (min-max regret) version of identical parallel machine scheduling problem, in which jobs may be outsourced to balance total cost against production efficiency. The total cost is measured in terms of the total completion time of jobs processed in-house and the cost of outsourcing the rest. Processing times of in-house jobs are uncertain and they are described as two types of scenarios: discrete and interval. The objective is to obtain a robust (min-max regret) decision that minimises the absolute deviation of total cost from the optimal solution under the worst-case scenario. We first prove the worst-case scenario for any feasible solution. For the interval scenario, we further prove that the maximum regret value can be obtained in polynomial time for any feasible schedule. We also prove that for any discrete scenario, the minimum total cost can be obtained in polynomial time. Since the problem with the interval scenario is strongly NP-hard, we then transform the problem into an equivalent robust single machine scheduling problem. Finally, we develop 2-approximation algorithms for the problem with discrete and interval scenarios, respectively. These results are helpful for bridging the scheduling theory and practice in identical parallel machining environments with outsourcing and uncertain processing times.

25 March 2014 in International Journal of Systems Science
Verified
Journal Article
Closed access
SWShijin WANG
Shijin WANG
Ming LiuMing Liu
Ming Liu
This paper investigates an integrated optimisation problem of production scheduling and preventive maintenance (PM) in a two-machine flow shop with time to failure of each machine subject to a Weibull probability distribution. The objective is to find the optimal job sequence and the optimal PM decisions before each job such that the expected makespan is minimised. To investigate the value of integrated scheduling solution, computational experiments on small-scale problems with different configurations are conducted with total enumeration method, and the results are compared with those of scheduling without maintenance but with machine degradation, and individual job scheduling combined with independent PM planning. Then, for large-scale problems, four genetic algorithm (GA) based heuristics are proposed. The numerical results with several large problem sizes and different configurations indicate the potential benefits of integrated scheduling solution and the results also show that proposed GA-based heuristics are efficient for the integrated problem.