Oscar Link

Prof. Dr. Oscar Link

orcid

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2011 in Coastal Engineering
Verified
Journal Article
Closed access
UZUlrich C.E. Zanke
Ulrich C.E. Zanke
THTai-Wen Hsu
Tai-Wen Hsu
ARAron Roland
Aron Roland
Oscar LinkOscar Link
Oscar Link
RDReda Diab
Reda Diab

1 September 2008 in International Journal of Sediment Research
Verified
Journal Article
Closed access
Oscar LinkOscar Link
Oscar Link
FPFlorian Pfleger
Florian Pfleger
UZUlrich Zanke
Ulrich Zanke

18 November 2016 in Journal of Hydraulic Research
Verified
Journal Article
Closed access
Oscar LinkOscar Link
Oscar Link
CCCristian Castillo
Cristian Castillo
Alonso PizarroAlonso Pizarro
Alonso Pizarro
ARAlejandro Rojas-Palma
Alejandro Rojas-Palma
BEBernd Ettmer
Bernd Ettmer
Salvatore ManfredaSalvatore Manfreda
Salvatore Manfreda
The time-dependent bridge pier scour during flood waves is analysed. Scour experiments were conducted in a novel installation able to produce complex hydrographs with high precision. Experimental data were used to test scour formulas including a new mathematical model. Results confirm the reliability and superior performance of the proposed dimensionless, effective flow work based model under steady and unsteady hydraulic conditions. Analyses highlight the impact of different hydrographs on scour, demonstrating the strong control by the hydrograph shape of the temporal evolution of scour depth and scour rate, although final scour after a flood only depends on the total effective flow work exerted by the hydrograph on the sediment bed. Hysteresis between flow discharge and scour rate is reported and explained. Flow acceleration is shown to play a minor role in scouring. The proposed model is a promising alternative for computation of local scour under highly unsteady hydraulic conditions.

1 March 2020 in Journal of Hydraulic Engineering
Verified
Journal Article
Closed access
Oscar LinkOscar Link
Oscar Link
MGMarcelo García
Marcelo García
Alonso PizarroAlonso Pizarro
Alonso Pizarro
HAHernan Alcayaga
Hernan Alcayaga
SPSebastián Palma
Sebastián Palma
The local scour and sediment deposition at a bridge pier during flood waves is analyzed to investigate the effects of different flow and sediment regimes (regulated and unregulated discharges with or without excess sediment supply). Concurrent field measurements of scour and streamflow were performed during 6 days at the Rapel Bridge, over the Rapel River (mean annual discharge, QMA=172  m3/s ), located in Central Chile (71°44’9” W, 33°56’22” S). During the measurements, river discharge was regulated by the operation of a hydropower plant, located 24 km upstream of the bridge, which follows a daily hydropeaking scheme. A simple mathematical model of scour and deposition is proposed, and field measurements are used to estimate optimal model parameters and to evaluate model performance. The model was applied to pre- and postdam scenarios to compare expected scour caused by a natural flow regime and by hydropeaking considering different excess sediment supply. Results show that the ultrasonic scour sensor is reliable for real scour monitoring under the presented field conditions. A single and easy-to-perform measurement of scour evolution during one flood was enough for estimation of optimal model parameters. The calibrated model reproduced measured scour and deposition in a verification case with high precision, i.e., root mean square error, RMSE=0.023  m and Nash-Sutcliffe efficiency, NSE=0.96 . The model application showed that scour and deposition are very sensitive to the excess sediment supply. After two years, scour in the predam scenario resulted higher than in the postdam scenario when equilibrium conditions or no sediment deposition occurred. In case of equilibrium conditions and excess sediment supply deposition occurred during the falling limb of floods producing important refilling of the scour hole. However, floods’ high peak-discharges and excess sediment supply produced high scour depths of comparable magnitude as those after the two years hydrograph, which occurred only briefly around the peak discharges before sediment deposition, illustrating the complex interactions between flow and sediment in time, with important consequences for monitoring of bridge pier scour in the field and for forensic analyses.

8 October 2012 in Acta Geophysica
Verified
Journal Article
Closed access
PDF file
Oscar LinkOscar Link
Oscar Link
CGChristian González
Christian González
MMMaría Maldonado
María Maldonado
CECristian Escauriaza
Cristian Escauriaza

24 January 2022 in Environmental Research
Verified
Journal Article
Closed access
FCFrancisco Javier Correa-Araneda
Francisco Javier Correa-Araneda
Javier PérezJavier Pérez
Javier Pérez
ATAlan M. Tonin
Alan M. Tonin
CECarlos Esse
Carlos Esse
Luz BoyeroLuz Boyero
Luz Boyero
MUMauricio Urbina
Mauricio Urbina