This study analyzes the scouring characteristics of the Mahakam River section to support bridge design and safety assessments. Using a 100-year return period, the design rainfall was determined to be 1246 mm via the Log Pearson III method, resulting in a peak design flood discharge (Q100) of 77,984 m3/s. Hydraulic analysis using a rating curve indicates a flood water level elevation of 32.578 m from the riverbed. Scouring calculations, including construction and stream scouring, were performed using Laursen’s and empirical methods. The results show a total scouring depth of 4.8 cm/year, primarily driven by stream scouring, as construction scouring was zero under current existing conditions. These findings emphasize the necessity of bank protection, such as gabions, to mitigate erosion risks for future infrastructure.