TEDDY MELENDEZ

TEDDY MELENDEZ

orcid

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2016 in Sustainable Energy Technologies and Assessments
Verified
Journal Article
Closed access
LVL. Roberto Valer
L. Roberto Valer
TMTEDDY MELENDEZ
TEDDY MELENDEZ
MFM. Cristina Fedrizzi
M. Cristina Fedrizzi
RZROBERTO ZILLES
ROBERTO ZILLES
AMAlbemerc M. de Moraes
Albemerc M. de Moraes

1 December 2018 in Anais Congresso Brasileiro de Energia Solar - CBENS
Verified
Conference Paper
Open access
PDF file
KSKauê José Felipe Novaes Cândido De Souza
Kauê José Felipe Novaes Cândido De Souza
AMAlex Renan Arrifano Manito
Alex Renan Arrifano Manito
TMTEDDY MELENDEZ
TEDDY MELENDEZ
AMAndré Ricardo Mocelin
André Ricardo Mocelin
RZROBERTO ZILLES
ROBERTO ZILLES
JPJoão Tavares Pinho
João Tavares Pinho
A possibilidade de gerenciar a demanda de energia elétrica utilizando a geração distribuída com armazenamento apresenta-se como uma alternativa para diversificação da matriz elétrica brasileira. Este trabalho contextualiza o atual cenário brasileiro de geração e as principais tecnologias de armazenamento. São destacados os fatores que entravam e estimulam a geração distribuída com armazenamento. É apresentada a infraestrutura presente no Laboratório de Sistemas Fotovoltaicos (LSF), para análise operacional da gestão da geração e demanda de energia da geração distribuída com armazenamento conectada a rede.

9 July 2026 in Energies
Verified
Journal Article
Open access
PDF file
JMJulio Martinez-Bolaños
Julio Martinez-Bolaños
AMAlex Renan Arrifano Manito
Alex Renan Arrifano Manito
RMRodrigo Maruyama
Rodrigo Maruyama
RVRenzo Vargas
Renzo Vargas
TMTEDDY MELENDEZ
TEDDY MELENDEZ
RARafael Herrero Alonso
Rafael Herrero Alonso
Solar resource databases used for estimating the plane-of-array irradiance for small- and medium-scale distributed photovoltaic (PV) systems are typically selected exclusively based on global horizontal irradiance bias. Since the databases are usually derived from satellite-based products and complemented by reanalysis models, this criterion is not always adequate because the biases associated with direct normal irradiance and diffuse horizontal irradiance may be amplified by the transposition model. This study investigates the bias effect through an analytical approach based on an isotropic transposition model and proposes practical guidelines for selecting databases to minimize errors when estimating the plane-of-array irradiance. The analytical approach, which was validated through numerical simulations parameterized with anisotropic models, demonstrates that the plane-of-array estimation errors depend primarily on latitude, the PV modules’ tilt and azimuth, as well as on the time of the year. The results of a case study conducted to validate the theoretical analysis under real-world conditions show that the method consistently selects the database with the lowest plane-of-array irradiation error.

13 December 2016 in Anais Congresso Brasileiro de Energia Solar - CBENS
Verified
Conference Paper
Open access
PDF file
TMTEDDY MELENDEZ
TEDDY MELENDEZ
MFMaria Cristina Fedrizzi
Maria Cristina Fedrizzi
RZROBERTO ZILLES
ROBERTO ZILLES
This article presents the operating characteristics of a photovoltaic pumping system using Variable Speed Drive with PLC (Programmable Logic Controller) and its advantages (MPPT and fixed voltage algorithms control for PV systems voltage operation and empty well protection through frequency and torque monitoring of electric machine) over standard frequency converters without PLC, both national manufacturer. The development of characterization is the result of knowledge acquired in pilot projects and implemented through a partnership between the Photovoltaics Laboratory of the University of São Paulo and the Weg industry. O artigo apresenta a caracterização operacional de um sistema fotovoltaico de bombeamento usando conversor de frequência com CLP (Controlador Lógico Programável) e suas vantagens (apresenta algoritmo de controle de tensão fixa e MPPT do gerador fotovoltaico e proteção de poço seco mediante monitoração da frequência e torque do motor elétrico) em relação ao conversor de frequência convencional sem CLP, ambos de fabricação nacional. O desenvolvimento da caracterização é resultado do aprendizado adquirido em projetos piloto e concretizado pela parceria entre o Laboratório de Sistemas Fotovoltaicos da Universidade de São Paulo e a empresa Weg.

10 November 2008 in Anais Congresso Brasileiro de Energia Solar - CBENS
Verified
Conference Paper
Open access
PDF file
TMTEDDY MELENDEZ
TEDDY MELENDEZ
MFMaria Cristina Fedrizzi
Maria Cristina Fedrizzi
RZROBERTO ZILLES
ROBERTO ZILLES
This work presents the operational performance and economic evaluation of three photovoltaic pumping configurations with motor pump power between 0.75 and 1 CV. Two systems are solar energy dedicated and one adopts the configuration proposal for Alonso Abella (2003) and Brito and Zilles (2004), that is, motor pump and conditioning power system from national factory production. The results show that the alternative configuration has smaller motor pump daily efficiency. The economic evaluation reveals the competitiveness of the alternative configuration when compared with imported solar energy dedicated systems. It’s worth mention, as additional advantage, the readiness of the conditioning power system equipments and the replacement easiness. It was also verified that the alternative configuration, variable speed drive Weg CFW08 and 1 CV SOMAR motor pump with 8 stages works with daily efficiency close to 30% between 30 and 40 meters head. Therefore, with an appropriate choice of the alternative configuration motor pump similar solar energy dedicated performance could achieve. The alternative configuration pumped only 1% less than the Grundfos system for 30 m operation. Este trabalho apresenta o desempenho e avaliação econômica de três configurações de sistemas fotovoltaicos de bombeamento que utilizam motobombas com potência entre 0,75 e 1 CV. Dois sistemas são dedicados a energia solar e um adota a configuração proposta por Alonso Abella (2003) e Brito e Zilles (2004), ou seja, motobomba e equipamento de condicionamento de potência de fabricação nacional. Os resultados mostram que a configuração alternativa possui menor eficiência diária do conjunto motobomba. A avaliação econômica revela a competitividade da configuração alternativa frente os sistemas importados dedicados à fotovoltaica. Alia-se a isso a disponibilidade dos equipamentos de condicionamento de potência e a facilidade de reposição. Verificou-se também que a configuração alternativa, conversor de freqüência Weg CFW08 e motobomba Somar de 1 CV e 8 estágios, trabalha com eficiência diária próxima aos 30% na faixa de operação de 30 a 40 metros. Portanto, com uma adequada escolha da motobomba para a configuração alternativa pode-se obter desempenhos semelhantes aos obtidos com sistemas importados dedicados à fotovoltaica. Para 30 metros a configuração alternativa bombeou somente 1% a menos que o sistema Grundfos.

13 December 2016 in Anais Congresso Brasileiro de Energia Solar - CBENS
Verified
Conference Paper
Open access
PDF file
MFMaria Cristina Fedrizzi
Maria Cristina Fedrizzi
TMTEDDY MELENDEZ
TEDDY MELENDEZ
LVLuis Roberto Valer
Luis Roberto Valer
OPOsvaldo Soliano Pereira
Osvaldo Soliano Pereira
This article presents the experience of setting up and monitoring the pilot project "water pumping systems with photovoltaic systems and national pumping technology - Pernambuco," which became operational in January 2014. Dedicates attention to the problems that the recorded need for technical training of both users, such as local authorities, which can provide support for maintenance, repairs and equipment replacement. O presente artigo apresenta a experiência de implantação e acompanhamento do projeto piloto “Sistemas de bombeamento de água com sistemas fotovoltaicos e tecnologia de bombeamento nacional – zona rural de Pernambuco”, que entrou em operação em janeiro de 2014. Dedica atenção aos problemas encontrados em campo e à necessidade de capacitação técnica tanto dos usuários, como de entidades locais que possam dar suporte para a manutenção, reparos e substituição de equipamentos.