Ivona Nedevska Trajkova

Prof. Dr. Ivona Nedevska Trajkova

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2024 in Facta universitatis - series: Architecture and Civil Engineering
Verified
Journal Article
Open access
PDF file
Zlatko ZafirovskiZlatko Zafirovski
Zlatko Zafirovski
MMMite Markovski
Mite Markovski
SOSlobodan Ognjenovic
Slobodan Ognjenovic
VGVasko Gacevski
Vasko Gacevski
Ivona Nedevska TrajkovaIvona Nedevska Trajkova
Ivona Nedevska Trajkova
RRRiste Ristov
Riste Ristov
Due to increased activities in civil engineering, and especially in the transport infrastructure, and thus an increase in the use of additional construction materials, innovative solutions are needed in finding alternative materials for the preservation of natural resources. One of the solutions for preserving natural building materials is the application of recycled material, which will also meet the required standards in civil engineering. In the transport infrastructure, there is a great opportunity for the use of recycled material, starting from the subbase, through the embankment and all the way to the superstructure and the concrete structures. One of the recycled materials that can be used in construction is fly ash. Fly ash is the most promising waste material when it comes to the wide range of applications in construction. Fly ash is obtained by burning coal in thermal power plants to produce electricity. Due to variations in the composition and characteristics of fly ash, several divisions and classifications have been created. One of the main classifications is according to the American standard ASTM C 618-05 where it is divided into class C and class F fly ash. This research aims to investigate the application of fly ash for subgrade stabilization and to determine the difference from a financial and environmental perspective for the application of fly ash compared to natural stone aggregate. The main research was carried out in connection with the increased use of natural stone aggregate, which appeared as a need during the rehabilitation of state road R1206, section Karpalak - Zelino. Apart from the use of large quantities of stone aggregate for the stabilization of the subgrade, it also had an impact on the financial framework for the realization of the road project. In Macedonia, an analysis of the chemical composition of 4 samples of fly ash obtained in REC Bitola was carried out. From the obtained results, it can be concluded that it belongs to the classification of F-class fly ash and with the use of an activator (lime or cement) it can be used in the stabilization of the subgrade.

1 January 2025 in Journal of Applied Engineering Science
Verified
Journal Article
Open access
Ivona Nedevska TrajkovaIvona Nedevska Trajkova
Ivona Nedevska Trajkova
Zlatko ZafirovskiZlatko Zafirovski
Zlatko Zafirovski
The Track Quality Index (TQI) was used as a primary metric to assess the structural and geometric condition of railway track infrastructure, which is directly related to traffic safety, ride comfort, and maintenance prioritization. This paper presents a predictive modeling approach aimed at forecasting future TQI values by incorporating historical measurements, geometric characteristics, and operational parameters. The analyzed dataset consisted of 821 observations of track sections collected over several measurement cycles. It included explanatory variables such as previous TQI levels, train operating speed, traffic volume, and infrastructure elements like tunnels, bridges, and records of ballast tamping. A General Regression Neural Network (GRNN) was trained using 657 data samples and validated on 164 samples, achieving a coefficient of determination (R²) of 0.699, a root mean square error (RMSE) of 4.70, and a mean absolute error (MAE) of 3.55. The results confirmed that neural networks are suitable for short-term predictions of track conditions, facilitating more effective planning and optimization of maintenance interventions. The proposed framework supports engineering decision-making related to condition-based maintenance of railways.

10 February 2024
Verified
Book Chapter
Closed access
PDF file
Zlatko ZafirovskiZlatko Zafirovski
Zlatko Zafirovski
Ivona Nedevska TrajkovaIvona Nedevska Trajkova
Ivona Nedevska Trajkova
VGVasko Gacevski
Vasko Gacevski
RRRiste Ristov
Riste Ristov
SOSlobodan Ognjenovik
Slobodan Ognjenovik
MLMarijana Lazarevska
Marijana Lazarevska

1 January 2024
Verified
Conference Paper
Closed access
SOSlobodan Ognjenovic
Slobodan Ognjenovic
RRRiste Ristov
Riste Ristov
Zlatko ZafirovskiZlatko Zafirovski
Zlatko Zafirovski
VGVasko Gacevski
Vasko Gacevski
Ivona Nedevska TrajkovaIvona Nedevska Trajkova
Ivona Nedevska Trajkova
Considering the relatively good condition of the non-urban road network in Republic of North Macedonia on the one hand, and the level of damage of the pavements on the other hand, there is an emerging necessity to invest considerable financial amounts on their maintenance. The pavement rehabilitation is a measure of the maintenance level intended to eliminate all damages of the pavements incurred in time and under the influence of traffic and climate, as well as to adjust the bearing capacity of the pavement on the increasing traffic load. Therefore, it is especially important to correctly plan and carry out these activities

1 January 2024
Verified
Conference Paper
Closed access
Zlatko ZafirovskiZlatko Zafirovski
Zlatko Zafirovski
VGVasko Gacevski
Vasko Gacevski
Ivona Nedevska TrajkovaIvona Nedevska Trajkova
Ivona Nedevska Trajkova
RRRiste Ristov
Riste Ristov
SOSlobodan Ognjenovic
Slobodan Ognjenovic
NINorth Macedonia Sintek Inzenering
North Macedonia Sintek Inzenering
The Toranica tunnel is 885.0 m long, with a clear opening with a diameter of D=2.60m and an area of 9.57 m2, and the lining is reinforced concrete with a thickness of d=30.0 cm and MB30. The bottom of the tunnel is lined with basalt cubes measuring 25x12x18 cm, which protect the concrete lining from destruction by running water that sometimes carries sediments. During the tunnel inspection, several anomalies were observed, which were caused by the mechanical action of water, chemical aggression, and errors during the construction of the building, which required an analysis of the stability of the tunnel and a proposal for a solution for rehabilitation.