Luna Luna

Dr. Luna Luna


Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 January 2023 in Water
Verified
Journal Article
Open access
PDF file
MJMaritza Liliana Arganis Juarez
Maritza Liliana Arganis Juarez
MPMargarita Preciado
Margarita Preciado
LLLuna Luna
Luna Luna
LCLiliana Cruz
Liliana Cruz
RDRamón Domínguez
Ramón Domínguez
OSOlaf Santana
Olaf Santana
A rainfall regionalization method based on variation coefficient was applied with a variant in the construction of flash flood hyetographs with several return periods using the flash flood shape of the historical event that occurred in September 2021 in the Tlalnepantla River basin, Mexico, that caused severe damage to population and its infrastructure in a few hours. The historical flash flood was simulated with a semi-distributed model in the free software HEC-HMS in order to obtain the outflow hydrograph, and the flood plains were obtained with Iber and Hec-Ras 2d software that simulate free surface flow with a two-dimensional analysis. With photographs of the site, it was possible to locate traces of water that were contrasted with they calculated depths; they were concordant. Synthetic design storms were then simulated to estimate their potential consequences on the site.

1 April 2013 in Ingeniare. Revista chilena de ingeniería
Verified
Journal Article
Open access
PDF file
MJMaritza Liliana Arganis Juarez
Maritza Liliana Arganis Juarez
LLLuna Luna
Luna Luna
El análisis de datos numéricos en ingeniería demanda el empleo o desarrollo de herramientas que permitan, entre otros cálculos, la elaboración de gráficas donde se presenten una o más funciones. En este artículo se presenta paso a paso el uso de Visual Basic 6® y el control PictureBox® para dibujar una o más series en un mismo gráfico y que pueden ser de igual o distinta longitud o cantidad de datos, para su comparación. Se ejemplifica su aplicación con éxito en el caso del manejo de datos de precipitación de estaciones pluviográficas. La metodología presentada puede utilizarse con Visual Basic 6®, pero el proceso puede codificarse en otros lenguajes de programación comúnmente aplicados como herramientas en la solución de diversos problemas de ingeniería que tienen que ver con la revisión rápida de procesos de generación de datos.

28 February 2026 in Water
Verified
Journal Article
Open access
PDF file
MJMaritza Liliana Arganis Juarez
Maritza Liliana Arganis Juarez
CLCristian López
Cristian López
JAJuan Aquino
Juan Aquino
LLLuna Luna
Luna Luna
JOJavier Osnaya
Javier Osnaya
MPMargarita Preciado
Margarita Preciado
Safe operation of aging dam infrastructure requires regular updates to design flood estimates and spillway operating rules. This paper presents a semi-automated methodology for updating design floods for return periods of 10 to 10,000 years, utilizing a suite of open-source software tools. The framework was applied to the El Caracol, Infiernillo, and Villita dams within the Balsas River hydroelectric system in Mexico. The methodology is based on the Engineering Institute of National Autonomous University of Mexico (IIUNAM) procedure, incorporating frequency analysis of daily mean flows and the generation of design hydrographs using the AX and IIHIDRODIS programs. Flood routing was subsequently performed under various operational policies using the Trate, HEC-HMS, and Traven programs to develop safe and effective strategies. Key recommendations include: for El Caracol dam, a staggered discharge policy for floods exceeding a 50-year return period (Tr); for Infiernillo dam, limiting discharges to 6000 m3/s during frequent floods (Tr < 100 years) and up to 12,000 m3/s for extreme events; and for La Villita dam, operating at 6000 m3/s, potentially increasing to 10,000 m3/s under extreme conditions while respecting downstream channel capacity. The proposed sequential automation markedly reduces processing times, in particular during the sequence involved in constructing a design flood. Previously, this task required approximately one or two days; it can now be completed in just a few minutes, demonstrating a significant advancement in the state of knowledge for studies on dam safety reassessment.

20 October 2016
Verified
Conference Paper
Open access
PDF file
LLLuna Luna
Luna Luna
MFM. Oscar A. Fuentes
M. Oscar A. Fuentes
GRG. Horacio Rubio
G. Horacio Rubio
MVM. Laura Vélez
M. Laura Vélez
The main objective of the research reflects the great need to generate hazard maps and calculate risk in the basin Huahuatay Rosarito in Baja California Sur, Mexico.For the topography in the study area, it is associated with a basin with fast response to rainfall - runoff relationship, because of that is considered necessary to establish the cell size of 50 m side and a time increment of 0.65 seconds. The estimate of the flow of water on the surface from the rain was based on the characterization of soils and vegetation cover, through the called number of the runoff curve proposed by the Soil Conservation Service.Flood areas calculated with a mathematical model of two-dimensional hydraulically from rain (FLUBIDI); they are sensitive to the quality of the input data. Thus, a digital terrain model with good resolution is undoubtedly necessary, and it depends on the path of the runoff.A good estimate of the effective rainfall, in time and space allows for a volume of runoff, flood areas and depths according to the hydraulic conditions of the study area.The size of the elements of the mesh used in the calculations generally is higher than the resolution of digital terrain models available, so that processing time would be suitable and which are related to cell size. The results successfully represent runoff within the watershed. Appropriate selection of the value of the friction coefficient of the Manning formula influences, largely, in the magnitudes of the velocities and depths of flow.Maps maximum depths, maximum speed and severity parameter (or multiplication deep drag velocity) for return periods of two, 5, 10, 50 and 100 years for river floods and storm were obtained.The maximum values that appear in the maps refer to the largest amount came to present at a certain point in each of the cells in the spreadsheet grid. Maps where the expected damage is presented annually were also developed.The damages were estimated at 60,250 homes and be led risk analysis for return periods from 2 to 100 years.Not necessarily, the works are constructed to reduce flood damages. Sometimes the water that temporarily occupied an area of land can be shifted to other areas where it could cause further injury; it is therefore advisable to make comprehensive basin-wide studies to evaluate the goodness of the proposed works, usually with simulation models embracing the basin where the floodplains are located…

20 October 2016 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
LLLuna Luna
Luna Luna
MFM Oscar A. Fuentes
M Oscar A. Fuentes
MVM Laura Vélez
M Laura Vélez
IPIsmene L. A. Rosales Plascencia
Ismene L. A. Rosales Plascencia
Analysing some aspects of water management in urban areas affected by flooding, an event that occurred in September 2010 by overflows Cotaxtla Jamapa and rivers in western Mexico along with the rain event for five consecutive days. In this area, near the Gulf of Mexico, the elevations are less than three meters elevation. Floods are common in cities like Veracruz, in this article the flood risk calculated by means of a hydraulic model of rainfall-runoff dimensional type developed at the Institute of Engineering of the National Autonomous University of Mexico. Data digital terrain elevation models of LIDAR were used, records hourly rainfall levels and channels of some hydrometric stations of the National Water Commission. The location of housing and services in a metropolitan area considered to calculate the depths of flooding in them. To estimate the damage, shall take into account the hydrodynamic behaviour of the flows. Since houses remain flooded for several days, was the reason to use precipitation level for more than seven days. in the mathematical modelling of flows water with a regular grid made up of cells 10 m by side with the boundary condition downstream, corresponding to the predicted change in the average sea level.

18 September 2024
Verified
Book Chapter
Closed access
PDF file
MJMaritza Liliana Arganis Juarez
Maritza Liliana Arganis Juarez
MPMargarita Preciado
Margarita Preciado
LLLuna Luna
Luna Luna
JHJosé Luis Herrera
José Luis Herrera
Eduardo Juan DiegoEduardo Juan Diego
Eduardo Juan Diego
RDRamón Domínguez
Ramón Domínguez