Rex Asibuodu Ugulu

Dr. Rex Asibuodu Ugulu


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 October 2022 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
UIUchenna Sampson Igwe
Uchenna Sampson Igwe
SMSarajul Fikri Mohamed
Sarajul Fikri Mohamed
MAMohd Bin Mat Dzahir Azwarie
Mohd Bin Mat Dzahir Azwarie
RURex Asibuodu Ugulu
Rex Asibuodu Ugulu
OAOlusegun Ajayi
Olusegun Ajayi
The construction industry has become more digital and the traditional methods of construction activities are gradually becoming outdated. In this era of digital construction, various information and communication technologies have been developed and deployed to the site for the management and control of construction activities including cost management. Irrespective of the benefits of adopting these technologies, most of them are still not readily accepted for use for construction management. This study articulated Seven (7) recent technologies driving the industry and evaluated their acceptance for cost management of construction projects. The technologies include mobile technology, Augmented/Virtual Reality (AR/VR), Building Information Modeling (BIM), Internet of Things (IoT), Autonomous Equipment (Drones and Robotics), Artificial Intelligence (AI), and Predictive Analytics (PA). Data was gathered using a restructured questionnaire and technology acceptance model analysis was performed to identify which of the technologies have higher acceptance for cost management based on the criteria of availability, affordability, frequency of use, usefulness for cost management, and acceptance in the industry. Test statistics using Spearman’s correlations and Kendall’s correlations for each of the technologies and Spearman’s Correlations of Technology acceptance with other variables in the TAM Model were performed. The results showed that mobile technology has higher correlation values than other technologies, and therefore has a higher acceptance for cost management. Kendall’s coefficient of concordance values and Spearman’s correlation values for Mobile technology were all above 0.6 which indicates a high level of agreement among the raters and strong relationships between the compared TAM variables.

5 October 2017 in Data in Brief
Verified
Journal Article
Open access
PDF file
RURex Asibuodu Ugulu
Rex Asibuodu Ugulu
SAStephen Allen
Stephen Allen
The data presented in this article is an original data on “Investigating the role of onsite learning in the optimisation of craft gang's productivity in the construction industry”. This article describes the constraints influencing craft gang's productivity and the influence of onsite learning on the blockwork craft gang's productivity. It also presented the method of data collection, using a semi-structured interview and an observation method to collect data from construction organisations. We provided statistics on the top most important constraints affecting the craft gang's productivity using 3-D Bar charts. In addition, we computed the correlation coefficients and the regression model on the influence of onsite learning on craft gang's productivity using the man-hour as the dependent variable. The relationship between blockwork inputs and cycle numbers was determined at 5% significance level. Finally, we presented data information on the application of the learning curve theory using the unit straight-line model equations and computed the learning rate of the observed craft gang's blockwork repetitive work.

10 May 2018 in Built Environment Project and Asset Management
Verified
Journal Article
Closed access
RURex Asibuodu Ugulu
Rex Asibuodu Ugulu
SAStephen Allen
Stephen Allen
The purpose of this paper is to investigate how on-site blockwork craft gangs’ learning impacts productivity within the production environment on-site to optimise their productivity. The research is adopting a quantitative method with the observation of seven craft gangs’ blockwork with an average of five members in each gang, using the learning curve model application in a 17-storey tri-tower construction project in Nigeria. The linear regression method was employed in the analysis stage of this study using labour-recorded productivity time input as the dependent variables. The paper provides empirical insights about the significance of on-site craft gangs’ learning. The overall blockwork craft gangs learning observed at the site level shows an average learning rate of 94.21 per cent resulting in 5.79 per cent improvement gains. Due to the nature of the study and the research question, the observations in this research study were limited to FCDA construction project in Nigeria. The limitation of this scenario is that the research results may lack generalisability. Therefore, there is the need for further study on the learning rate. This research study includes the implications for the development of on-site blockwork craft gangs learning; the significant impact of learning rate of 94.21 per cent resulting in 5.79 per cent improvement gain can be used in the planning and to fast track the productivity of craft gangs’ construction. This paper identified the need to improve construction productivity through craft gangs’ on-site learning with the application of the learning curve theory.

6 May 2020
Verified
Book Chapter
Open access
PDF file
RURex Asibuodu Ugulu
Rex Asibuodu Ugulu
SAStephen Allen
Stephen Allen
AAAndrew Arewa
Andrew Arewa
This chapter presents the concept and meaning of construction productivity and the techniques used in measuring workforce skills productivity in the construction industry. There are three major methods highlighted for monitoring and measuring productivity in the construction industry. The first relates to visual recording that requires taught watchers to be available on location to monitor and record work by specialists. The second is the physical recording technique which involves a direct surveillance technique that includes a qualified observer observing the site for the full duration of the working day operation using the work study method or work measurement. This method was typically illustrated with the application of regression model and learning curve theory to improve labour productivity. The third measuring technique discussed is the use of questionnaires and interview survey which involves information gathering through an interview with supervisors and workers working in the construction industry. Finally, the chapter discussed how infrastructure productivity can be improved through effective supervision, material management and supply chain management, project front-end planning (loading) and work face planning, training and certification of workforce and labour management and relations.