In this study, effects of the combination of meter replacement and active leakage control on real and apparent losses are investigated. Generally, water meter replacement campaigns, SCADA system operation, data analysis studies and physical leak detection activities are carried out by different units in water utilities. Within the scope of this study, the studies carried out by different units of the water utility were carried out in an integrated manner in the same period and the obtained data sets were analysed together. Thus, water losses, which were at the level of 52% in the pilot study area (PSA), were reduced to 35%. When the volumes of water supplied to the system before and after the study are compared, the volumes after the study were decreased. Also, water losses in the PSA have been reduced by 17%.
Post-meter water leakage management is critical because leaks occurring after the subscriber meter often remain undetected for long periods, resulting in substantial water wastage and increased abstraction, treatment, and pumping requirements. This study presents a pilot application in Antalya, Türkiye, covering 29 public areas, including schools, mosques, cemeteries, parks, public toilets, health service units, and municipal buildings. Smart meters recording 15-min interval data over nine months were used to distinguish water consumption from post-meter leakage. The analysis revealed high leakage volumes, particularly in schools (7955 m3), cemeteries (3233 m3), and mosques (2721 m3), with the highest leakage ratio observed in mosques (0.77). Overall, post-meter leakages significantly increased operational costs, energy use, and associated greenhouse gas emissions.