Mikhail Petrushin

Mr. Mikhail Petrushin

orcid

Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 August 2026 in Processes
Verified
Journal Article
Open access
PDF file
MPMikhail Petrushin
Mikhail Petrushin
EKEfim Kherson
Efim Kherson
NSNikita Smirnov
Nikita Smirnov
EYEvgeny Yudin
Evgeny Yudin
SDShadfar Davoodi
Shadfar Davoodi
VGViktoriia Николаевна Gorbacheva
Viktoriia Николаевна Gorbacheva
Unstable well operations, driven by reservoir depletion, high gas–oil ratios, unstable inflow, and surface network interactions, have become a major challenge in modern production—especially in Western Siberian fields—causing flow instabilities and production losses. While numerous studies have advanced transient modeling for field optimization, their practical application remains largely limited to recommendation systems running on hourly or daily cycles, making recommendations irrelevant by the time they are applied. At the opposite end, PLCs (programmable logic controllers) relying on PID (proportional–integral–derivative) control cannot solve the main problem: determining the structure of the intermittent cycle. This work proposes a reduced-order transient model of the coupled “reservoir–tubing–annulus” system that captures the essential behavior of transient multiphase flow while remaining compact enough for on-edge real-time model predictive control. Constrained optimization algorithms built on this model provide autonomous closed-loop well control, ensuring equipment and reservoir limits are respected and enabling safe, smooth mode transitions. The solution was validated against high-fidelity simulations and real operating data from Western Siberian fields, demonstrating reliable intermittent ESP (electrical submersible pump) well operation, robust response to rapid operational changes, and effective disturbance rejection.

1 October 2026 in SPE Journal
Verified
Journal Article
Closed access
VLV. S. Liubimov
V. S. Liubimov
EKE. Y. Kherson
E. Y. Kherson
MPMikhail Petrushin
Mikhail Petrushin
VGV. N. Gorbacheva
V. N. Gorbacheva
MSM. D. Shabunin
M. D. Shabunin
VPV. A. Petyaev
V. A. Petyaev
Summary: Effective operation of low-rate electric-submersible-pump (ESP) wells often requires intermittent or alternating-frequency control, particularly in mature fields where installed ESP capacity exceeds the current sustainable reservoir inflow, and a full workover is not economically justified. In such wells, gradual loss of tightness in the downhole tubing check valve above the ESP discharge can cause back-drainage from the tubing during nonproducing intervals, distorting shut-in pressure recovery and restart conditions, and reducing production efficiency; under sufficiently strong reverse flow, the pump may also enter a pump-as-turbine (PAT) regime that further changes the hydraulic response of the system. While not every ESP completion includes a check valve, analysis of ESP workover records for a large sample of ESP wells across Western Siberia fields confirms that this is a common and recurring operational condition rather than a rare edge case. This paper extends a reduced-order transient model of ESP wells to account for leakage through the downhole tubing check valve above the ESP and for reverse-flow pump behavior during alternating-frequency operation. The proposed extension preserves computational efficiency while improving the model’s ability to reproduce nonstationary pressure and fluid-level dynamics. The model is integrated into automated adaptation and optimization workflows and tested on field cases from Western Siberia. The results show improved agreement with observed shut-in recovery behavior, substantially reduced cycle-to-cycle variability in production and power relative to baseline intermittent operation, and more robust selection of operating schedules for wells affected by leakage. The proposed approach can be used for diagnostics, model adaptation, and optimization of both individual wells and well groups operating under intermittent or alternating-frequency conditions.